HVAC replacement and meter-base repair at 11911 Greenville Ave
Dallas permits indicate unit-level mechanical and electrical work at 11911 Greenville Ave, rather than a new building. A permit filed January 5, 2026, covers a meter-base repair in Building 2, Unit 2213; a permit filed April 8, 2026, covers replacement of an air handler and condenser in Apt-4120.
Summarized from City of Dallas records · updated Apr 8, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 8, 2026
- since Jan 5, 2021
- Largest scope
- —
- Listed value
- $31
- partial · often understated
Permit & project history
6 projectsSources: City of Dallas
Questions about 11911 Greenville Ave
What is happening at 11911 Greenville Ave?
Dallas permits show a meter-base repair in Building 2, Unit 2213, and an HVAC system changeout in Apt-4120. The records describe unit-level work, not a new building.
Is a new building being built at 11911 Greenville Ave?
The available permits do not indicate new construction at this address. They cover a meter-base repair and an air handler and condenser replacement.
What does the HVAC permit at 11911 Greenville Ave cover?
Permit COM-MEC-26-000845, filed April 8, 2026, describes a system changeout in Apt-4120, including installation of a 2.5-ton air handler and condenser.
What electrical work is permitted at 11911 Greenville Ave?
Permit COM-ELC-26-000055, filed January 5, 2026, covers a meter-base repair in Building 2, Unit 2213.
When were permits filed for work at 11911 Greenville Ave?
The City of Dallas records show filings on January 5, 2026, and April 8, 2026. They cover the meter-base repair and HVAC system changeout, respectively.
Also being built nearby
All of 75243- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 27 m away
- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 28 m away
- 11910 Greenville AveDec 2, 2025Replace 1" rpz, 1" solenoid valve · 67 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 85 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 178 m away
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department · 200 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 228 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 238 m away
- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 255 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 274 m away
- 8989 Forest LnSep 15, 2026Mcr just paint, front drywall & add two doors · 278 m away
- 8900 Forest LnApr 14, 2026Replace rpz · 293 m away