11880 Greenville Ave
Dallas, TX 75243
11880 Greenville Ave suite being divided for Chip Targets
A March 19, 2026, Dallas permit describes dividing the existing 17,714-square-foot Suite 120 into two equal suites, numbered 120 and 130. The permit says Chip Targets Incorporated plans to occupy the new Suite 120 and is also applying for a certificate of occupancy for Suite 110. Later electrical permits cover power work and a meter release for a new tenant occupant.
Summarized from City of Dallas records · updated Jul 22, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jul 22, 2026
- since Jun 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsA new disconnect and panel will be installed to provide power to equipment within the building. the existing meter base will feed an outdoor-mounted disconnect, from which power will be routed indoors to a 200-amp panel supplying electricity to designated equipment inside. feeders will be installed in 2-inch emt conduit with weather-resistant fittings as required. the outdoor disconnect will be fused at 200 amps, with grounding and bonding completed in full compliance with applicable codes
A new disconnect and panel will be installed to provide power to equipment within the building. the existing meter base will feed an outdoor-mounted disconnect, from which power will be routed indoors to a 200-amp panel supplying electricity to designated equipment inside. feeders will be installed in 2-inch emt conduit with weather-resistant fittings as required. the outdoor disconnect will be fused at 200 amps, with grounding and bonding completed in full compliance with applicable codes
City of Dallas permitCommercial Electrical PermitMcr the current suite 120 has 17714 sq ft of space. we would like to divide it into two equal suites (suite 120 and 130) by two existing openings and move the door from one side of an office to another side of the same office. the new suite 120 will be occupied to chip targets incorporated. chip targets incorporated is also applying for a co of suite 110. therefore, this remodeling application is in conjunction with chip targets incorporated application for the co of suite 110 and new suite 120
Mcr the current suite 120 has 17714 sq ft of space. we would like to divide it into two equal suites (suite 120 and 130) by two existing openings and move the door from one side of an office to another side of the same office. the new suite 120 will be occupied to chip targets incorporated. chip targets incorporated is also applying for a co of suite 110. therefore, this remodeling application is in conjunction with chip targets incorporated application for the co of suite 110 and new suite 120
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 11880 Greenville Ave
What is being built at 11880 Greenville Ave?
A Dallas permit describes an interior alteration to divide existing Suite 120 into two equal suites, 120 and 130. It also describes moving a door within an office.
When was the suite remodel at 11880 Greenville Ave permitted?
The alteration permit was filed March 19, 2026. Its permit number is COM-ALT-ADD-26-000503.
Is Chip Targets Incorporated moving into 11880 Greenville Ave?
The permit says Chip Targets Incorporated plans to occupy the new Suite 120. It also says the company is applying for a certificate of occupancy for Suite 110.
How large is Suite 120 at 11880 Greenville Ave?
The permit says the existing Suite 120 contains 17,714 square feet and is to be divided into two equal suites.
What electrical work is permitted at 11880 Greenville Ave?
A May 7, 2026, permit describes installing an outdoor disconnect and a 200-amp panel to supply equipment inside the building. A July 22, 2026, permit requests release of the house power meter for a new tenant occupant.
When is the new tenant at 11880 Greenville Ave opening?
The permits listed for this address do not provide an opening date.
Also being built nearby
All of 75243- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 13 m away
- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 27 m away
- 11910 Greenville AveDec 2, 2025Replace 1" rpz, 1" solenoid valve · 65 m away
- 11835 Greenville AveDec 3, 2025Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer · 100 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 162 m away
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department · 200 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 237 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 247 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 249 m away
- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 267 m away
- 8900 Forest LnApr 14, 2026Replace rpz · 268 m away
- 11857 Judd CtJun 29, 2026Refreshment area installation with countertop, cabinets, fridge, sink, coffee machine, and microwave. additional restrooms, one for female, and one for male. exposed plumbing if allowed. wall-hung toilets. please advise if floor drain is required · 289 m away
More offices in 75243.