Roof overlay permitted for three buildings at 11835 Greenville Ave
A commercial roofing permit filed December 3, 2025, covers roof overlays on three buildings at 11835 Greenville Ave. The work includes replacing sections of wet insulation, installing new 60-mil TPO membranes and related flashing and edge details; the roof decks are not being removed.
Summarized from City of Dallas records · updated Dec 3, 2025
- Projects
- 6
- 6 filings
- Latest filing
- Dec 3, 2025
- since Dec 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsBuilding 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer
Building 1: remove the existing tpo membrane as needed to replace insulation. replace approximately 2,690 sq ft of wetted insulation found during the moisture survey with an average thickness of 4 inches, and install new poly iso as needed to fill.install a 0.5 inch eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. detach and reset the existing parapet coping metal with the new termination bar.adhere the new tpo to the front parapet wall.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 2:clean the existing modified bitumen roof system of loose debris.replace approximately 469 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches.install a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. install tapered insulation 8 feet out from the front parapet wall to promote positive drainage.remove xl abandoned satellite dish and dispose.replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.building 3:clean the existing modified bitumen roof system of loose debris.replace approximately 289 sq ft of wetted insulation found during the moisture survey with an average thickness of 2 inches, and install new poly iso insulation as needed to fillinstall a 0.5” eps fanfold cover board over the entire roof surface, which ensures a protective surface for the new membrane while adding additional insulation.install new flashings on all penetrations.install new 24-gauge drip edge along eaves. replace existing parapet coping metal due to poor condition - pre-finished.install new 60-mil tpo membrane mechanically attached per manufacturer's specifications.this scope does not include removing the roof to the deck - it is an overlay. the deck/substrate will not be removed during the overlay process, we are only removing and replacing specific areas of insulation that are saturated with moisture, as required by the manufacturer
City of Dallas permitCommercial Roofing Permit
Sources: City of Dallas
Questions about 11835 Greenville Ave
What is being built at 11835 Greenville Ave?
A December 3, 2025, commercial roofing permit covers roof overlays on three buildings, including new 60-mil TPO membranes and replacement of some wet insulation.
Is a new building going up at 11835 Greenville Ave?
The permit describes roofing work on three existing buildings, not construction of a new building.
When was the roofing work at 11835 Greenville Ave permitted?
The City of Dallas permit was filed December 3, 2025. Its permit number is COM-ROOF-25-000185.
Are the roofs at 11835 Greenville Ave being removed?
No. The permit describes the work as an overlay and says the roof decks will not be removed.
What roofing materials are specified for 11835 Greenville Ave?
The permit specifies new mechanically attached 60-mil TPO membranes, along with cover board, flashing and drip edge. It also calls for replacing specified areas of moisture-damaged insulation.
Also being built nearby
All of 75243- 11911 Greenville AveApr 8, 2026Apt-4120- changeout system- install 2.5 air handler and condenser · 85 m away
- 11880 Greenville AveJul 22, 2026House power meter is requesting to be released for new tenant occupant · 100 m away
- 11886 Greenville AveApr 29, 2026Run gas to bunsen burners · 109 m away
- 9035 Forest LnMar 31, 2026Installing (4) 2 pole 20 amp circuits for the freezers and coolers; relocating some circuits. adding a 100 amp subpanel · 146 m away
- 11910 Greenville AveDec 2, 2025Replace 1" rpz, 1" solenoid valve · 151 m away
- 9025 Forest LnApr 7, 20269- ceiling fans10-plugs · 155 m away
- 9131 Forest LnSep 21, 2026Clean and show.location is vacant · 167 m away
- 9009 Forest LnJun 23, 2025Adding an emergency backup generator. chaing entire electrical service and adding 2 transfer switches · 171 m away
- 8989 Forest LnSep 15, 2026Mcr just paint, front drywall & add two doors · 194 m away
- 9728 Greenville Ave · Bank OzkMay 22, 20257 pneumatic thermostats7 supply air diffusers6 return grilles · 272 m away
- 12000 Greenville AveSep 16, 2026Fence permit for new construction of a two-story concrete tilt-up panel building with offices, warehouse, training room, break rooms, locker rooms, restrooms, conference rooms, and balcony. the site will be developed for large fleet parking, employee staff parking, and visitor parking. the project will create a new home for water wastewater and stormwater divisions of the dallas water utilities department · 279 m away
- 9191 Forest LnAug 11, 2026Construct interior non-load barring wall to seperate restroom from kitchen area · 305 m away
More restaurants in 75243.