New demolitions in Dallas 75247
31 addresses in 75247 have permits or project filings for demolitions in the last two years. The most recent was filed at 9144 King Arthur Dr.
Latest filings
- 9144 King Arthur DrOct 28, 2026Demolition and replace two existing city approaches
- 4939 Reading St · Rack Asset Realty, LLCOct 27, 2026Installing main distribution feeders, mbp to ups feeders, ups control conduits, ups battery cabinet feeders, pdu feeder, crac branch circuit, crac condenser branch circuit, circuits for future crac units, generator
- 8601 Sovereign RowOct 22, 20265 ton packaged unitrun ductwork
- 4900 Calvert St · Shift HqOct 21, 2026Administrative request to create a new lease suite number (suite b127) inside an existing warehouse. no construction, no structural changes, and no mep (mechanical, electrical, plumbing) work being performed. establishing space for a certificate of occupancy
- 3000 Pegasus Park DrOct 6, 2026Hvac remodel
- 8408 Chancellor RowSep 15, 2026Service upgrade
- 4333 Irving Blvd · Core & Main LPSep 8, 2026This project includes the renovation and reconfiguration of the existing office and warehouse facilities to improve functionality, accessibility, and operational efficiency. the scope includes interior and exterior building improvements, selective demolition, and site modifications. construction will be phased to maintain business operations throughout the project
- 1208 Viceroy DrSep 2, 2026Electrical for new generator
- 3132 Iron Ridge StSep 2, 2026Install a carlisle vacuseal tpo layover with loose lay coverboard and iso. to receive 20 year ndl warranty from manufacturer. make localized deck repairs as needed before installing tpo layover
- 7263 Envoy CtAug 21, 2026Changed all ductwork
- 1901 Regal RowAug 6, 2026Install 310 lf of 6' tall black chainlink
- 4500 Irving Blvd · Crown Enterprises, LLCJul 22, 2026Plumbing rough; plumbing top; plumbing final
- 8617 Ambassador RowJul 9, 2026Installation of a new pallet racking system within an existing commercial warehouse. the scope of work includes the placement of selective pallet rack structures covering approximately 762 square feet of floor area. work consists of anchoring uprights to the existing concrete slab, installing beams, and assembling rack components per the engineered drawings. no modifications will be made to the building’s structural elements, electrical systems, plumbing, or mechanical systems. this project is limited to the installation of storage racks only. all racking will be installed per the stamped engineering plans and calculations provided, and the system will be used for high?pile storage as defined by the fire code
- 909 Regal RowJul 9, 2026Plumbing work above ground onlywe are not touching gas lines we might do a pressure test if needed
- 304 W Mockingbird LnJun 10, 2026Bu zo el ev chargers, associated with project com-gen-26-000036
- 1241 Majesty DrMay 5, 2026Electrical work for commercial alterations
- 5131 Sharp StApr 30, 2026Remplaced 1 toilet, 1 vanity and a hand sink
- 3145 Halifax StApr 24, 2026Electrical
- 5124 Sharp StApr 9, 2026Electrical work for commercial project
- 7050 N Stemmons FwyApr 9, 2026Completely new backflow install serial #535157 and also a backflow demolition and serial #355851 (the new install is not a replacement of the demolition backflow)
- 3200 Irving Blvd · Mariners Rga Proto Industrial LPApr 8, 2026Install new hvac
- 4855 Cash RdMar 26, 2026Add on ductwork for remodel
- 4007 Irving BlvdMar 12, 2026Demolition of existing building at 4007 irving blvd
- 4001 Irving BlvdMar 12, 2026Demolition of existing building structure at 4001 irving blvd
- 1220 W Mockingbird LnFeb 3, 2026Relocate existing circuits for kitchen equipment
- 4711 Carol LnJan 16, 2026Demolish 1200 sq ft house includes removing all existing slab. the 4940 sq ft building will not be disturbed / demolished. it will remain
- 5020 Sharp StDec 29, 2025Qteam qr demolition the receiving, staging, workroom area. demolition 3 offices, storage room and parts storage. all walls are non-structural
- 1311 Empire CentralDec 4, 2025Mcr demolition existing bar in main ballroom. remove wood frame, bar top and tile floor
- 1212 Majesty DrOct 16, 2025We want to move the existing curb back about 10 feet so that the trucks have space and it doesn't affect them. in the area where the curve is currently, there is nothing that would interfere with the work, such as irrigation or anything else
- 1330 Empire CentralSep 11, 2025• mechanically demolish, removal and disposal of 1-story brick building and associated canopies. foundation to remain.• removal and disposal of standalone canopy. foundation to remain
- 740 Regal RowJul 22, 2025Qteam qr demolition one sheetrock demising wall. the wall is approximately 176 linear feet and approximately 18 feet high. the wall that is being demolished does not include any electrical, plumbing, or mechanical
Questions
What demolitions are being built in Dallas 75247?
31 addresses in 75247 have permits or project filings for demolitions in the last two years. The most recent was filed at 9144 King Arthur Dr. Others include 4939 Reading St, 8601 Sovereign Row, 4900 Calvert St.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.