4500 Irving Blvd
Dallas, TX 75247 · Crown Dallas TX Terminal, Central Transport Dallas
Freight terminal and fleet shop additions planned on Irving Blvd
Dallas permits filed May 6, 2026, describe additions and renovations at an existing freight terminal and fleet maintenance shop at 4500 Irving Blvd. Plans include an approximately 11,600-square-foot addition for business and storage uses at the terminal and an approximately 9,041-square-foot warehouse addition at the fleet shop. Earlier permits filed July 15, 2025, also describe additions for business and warehouse uses.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Jul 22, 2026
- Projects
- 9
- 9 filings
- Latest filing
- Jul 22, 2026
- since Jul 15, 2025
- Largest scope
- 76,515 sf
- Estimated cost
- $2.6M
- state registration
Where this project stands
Finishing up · inspection nextCrown Dallas TX Terminal
76,515 sq ft · $1.2M est.
- RegisteredJul 25, 2025
- Plan review
- ConstructionOct '25 – Apr '26
- Inspectednow
- Closed
Scheduled to finish Apr 1, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
9 projectsThe selective demolition to accommodate new renovation and addition at an existing fleet maintenance shop (auto repair facility associated with existing freight terminal also on property, under separate permit). selective demolition measuring ±10,000 sq ft to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ±9,041 sq ft of s-1 storage use, warehouse function, and construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application
The selective demolition to accommodate new renovation and addition at an existing fleet maintenance shop (auto repair facility associated with existing freight terminal also on property, under separate permit). selective demolition measuring ±10,000 sq ft to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ±9,041 sq ft of s-1 storage use, warehouse function, and construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application
City of Dallas permitCommercial Alteration Addition PermitThe selective demolition (± 5300 sq ft) of existing freight terminal structure to accommodate new renovation and addition. renovated facility will remain a freight terminal. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ± 11,600 sq ft of b-business and s-1 storage use/function of construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
The selective demolition (± 5300 sq ft) of existing freight terminal structure to accommodate new renovation and addition. renovated facility will remain a freight terminal. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ± 11,600 sq ft of b-business and s-1 storage use/function of construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
City of Dallas permitCommercial Alteration Addition PermitInstall a new sanitary sewer line from building just outside parts room approximately 200 lf across parking lot and connect to existing sanitary sewer line
Install a new sanitary sewer line from building just outside parts room approximately 200 lf across parking lot and connect to existing sanitary sewer line
City of Dallas permitCommercial Plumbing PermitThe selective demolition to accommodate new renovation and addition at an existing terminal logistics facility. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ± 12,000sf — logistics terminal
TDLR project registrationAdditions to Existing BuildingReview Complete76,515 sq ft$1.2M est.- Project #
- TABS2025024396
- Tenant / owner
- Crown Dallas TX Terminal
- Design firm
- Pro
- Contact
- Pro
The selective demolition to accommodate new renovation and addition. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ±9,000sf of s-1 storage use, warehouse function, and construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
The selective demolition to accommodate new renovation and addition. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ±9,000sf of s-1 storage use, warehouse function, and construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
City of Dallas permitCommercial Alteration Addition PermitThe selective demolition to accommodate new renovation and addition at an existing terminal logistics facility. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ± 12,000sf of b-business use and function of construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
The selective demolition to accommodate new renovation and addition at an existing terminal logistics facility. demolition to include architectural, structural, and mep elements. new construction scope to include one (1) addition measuring ± 12,000sf of b-business use and function of construction type ii-b. scope of work shall include ground improvements, conventional foundation design, metal engineered building, architectural, mechanical, electrical, plumbing. fire protection and fire alarms shown for reference only. fire protection and fire alarms to be provided under separate work order and application. civil engineering to be provided under separate work order and application
City of Dallas permitCommercial Alteration Addition PermitAddition of an office building and forklift storage area to an existing dock/transport sorting facility — central transport dallas
TDLR project registrationAdditions to Existing BuildingReview Complete10,000 sq ft$2.6M est.- Project #
- TABS2024004776
- Tenant / owner
- Central Transport Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 4500 Irving Blvd
What is being built at 4500 Irving Blvd?
Dallas permits describe renovations and additions to an existing freight terminal and fleet maintenance shop. The May 6, 2026, filings include a terminal addition and a warehouse addition at the shop.
Is a new warehouse planned at 4500 Irving Blvd?
A May 6, 2026, permit describes an approximately 9,041-square-foot storage and warehouse addition at an existing fleet maintenance shop. The permit number is COM-ALT-ADD-25-001998.
What changes are planned for the freight terminal?
Permit COM-ALT-ADD-25-001997, filed May 6, 2026, describes selective demolition and an approximately 11,600-square-foot addition for business and storage uses. The permit says the renovated facility will remain a freight terminal.
When were permits filed for work at 4500 Irving Blvd?
The records span July 15, 2025, through July 22, 2026. Addition and renovation permits were filed July 15, 2025, and May 6, 2026; plumbing permits were filed July 22, 2026.
How large are the planned additions at 4500 Irving Blvd?
The May 2026 permits describe additions of approximately 11,600 square feet at the freight terminal and 9,041 square feet at the fleet maintenance shop. Earlier permits filed in July 2025 describe additions of approximately 12,000 and 9,000 square feet.
What is planned at 4500 Irving Blvd near Core & Main Dallas B102?
The site is about 388 meters from Core & Main Dallas B102 at 4333 Irving Blvd. Permits for 4500 Irving Blvd describe freight terminal and fleet maintenance shop renovations and additions.
Do the permits mention plumbing work at 4500 Irving Blvd?
Yes. Two commercial plumbing permits filed July 22, 2026, cover plumbing rough-in, top-out and final work; one also lists site work. Their numbers are COM-PLM-26-002759 and COM-PLM-26-002758.
Also being built nearby
All of 75247- 4515 Irving BlvdJun 4, 20253 ton condenseralso this should be mcco trucks but it doesnt show up on this website the right way as it does on the appraisal site just fyi · 203 m away
- 4415 Irving BlvdSep 23, 2020Remove existing roofing install mechanically attached 60mil tpo with 4.5 iso tapered to drain water · 274 m away
- 4333 Irving Blvd · Core & Main LPSep 8, 2026This project includes the renovation and reconfiguration of the existing office and warehouse facilities to improve functionality, accessibility, and operational efficiency. the scope includes interior and exterior building improvements, selective demolition, and site modifications. construction will be phased to maintain business operations throughout the project · 388 m away
- 4303 Irving BlvdNov 5, 2020Install wiring to pump yard · 435 m away
- 4531 Leston AveMar 20, 2026New electrical service for fans · 446 m away
- 4541 Leston AveOct 19, 2026New underground gas to be installed and gas to be installed inside also · 450 m away
- 4545 Leston AveNov 13, 2026Install gas underground · 451 m away
- 4557 Leston AveSep 12, 2025Repair electric damage · 456 m away
- 4433 Leston Ave · Salem LeasingMay 6, 2024Salem leasing — renovation/alteration — commercial remodel. we are building out rooms within the current structure. the main sewer lines for the bathrooms will be replace because of pipe corrosion. there will be no load bearing walls or structural modifications. new electrical and plumbing · 461 m away
- 4411 Leston AveFeb 10, 2026Replace double check assembly by the street · 475 m away
- 4560 Leston AveJul 23, 2026Replace stolen service feeds from transformer to building · 518 m away
- 4647 Leston AveAug 14, 2026Replacing damaged 600 amp breaker utility release needed · 522 m away
More demolitions in 75247, warehouses & industrial in 75247, parking structures in 75247.