New warehouses & industrial in Dallas 75247
48 addresses in 75247 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3020 Pegasus Park Dr.
Latest filings
- 3020 Pegasus Park Dr · Bridge Labs Dallas, Llc, Attn. Grant DziudaNov 13, 2026Installing, panels, atss, & generator. overhead conduit homeruns and branch circuiting, lighting, grounding, new feeders from the main electrical room, and feeders from the generator to the atss
- 4545 Leston AveNov 13, 2026Install gas underground
- 3817 Irving Blvd · Trip Jv Investors, LLCNov 12, 2026Gas test
- 4211 Irving BlvdNov 11, 2026Jf petroleum group is providing the electrical to the following fuel equipment. overhead electrical conduit and wire to new fuel dispending system new shop building. note: electrical fuel panel and circuit breakers are to be provided by g.c. electrical contractor. electrical to (4) island fuel pump meters with solenoids. (4) island fuel pump fuel management system (3) diesel exhaust fluid (def) dispensers. (2) fuel system emergency stop switches electrical wire and cables to existing fuel dispensing system at tank pad. pull new wire and cables to existing aboveground storage tanks. note: underground conduits from new shop building to existing tank pad are provided by g.c. electrical contractor. (4) stp motors (1) offload pump (1) emergency stop switch (4) ast tank monitor cables
- 2931 Irving Blvd · Macro Drive Loan HoldingsNov 11, 2026Electrical remodel
- 8900 Sovereign Row · Bf & Jf, LLCNov 9, 2026Additional 20ft x 138ftfor the building
- 201 Regal RowNov 4, 2026201 regal row dallas,tx renovating approximately 10,000sqft to approximately 4,000sqft of office space. inside warehouse renovations :removing sprinkler system,dry wall,hvac,electrical outside warehouse:concrete modifications,building modifications (cut out for 2- 14x10ft roll up doors and 3 man way doors) driveway widening modifications, ada ramp modifications, exit curb modifications. i have submitted prints for this project
- 5017 Pulaski StNov 3, 2026Zo bc pallet racking permit to be connected to tenant's com-alt-add-26-002167. erect and anchor tall metal shelving (pallet racks)
- 1539 Round Table DrOct 27, 2026Zo bc our company recently purchased the property. we recently applied for a co that was denied due to proposed floor plans that do not match previous floor plans from historic owners. we are applying for this permit to correct the record
- 4939 Reading St · Rack Asset Realty, LLCOct 27, 2026Installing main distribution feeders, mbp to ups feeders, ups control conduits, ups battery cabinet feeders, pdu feeder, crac branch circuit, crac condenser branch circuit, circuits for future crac units, generator
- 8601 Sovereign RowOct 22, 20265 ton packaged unitrun ductwork
- 4900 Calvert St · Shift HqOct 21, 2026Administrative request to create a new lease suite number (suite b127) inside an existing warehouse. no construction, no structural changes, and no mep (mechanical, electrical, plumbing) work being performed. establishing space for a certificate of occupancy
- 1107 Conveyor LnSep 30, 2026Zo bc north dallas warehouse equipment will be installing a pallet racking storage system for cain foods
- 8408 Chancellor RowSep 15, 2026Service upgrade
- 4333 Irving Blvd · Core & Main LPSep 8, 2026This project includes the renovation and reconfiguration of the existing office and warehouse facilities to improve functionality, accessibility, and operational efficiency. the scope includes interior and exterior building improvements, selective demolition, and site modifications. construction will be phased to maintain business operations throughout the project
- 8303 Sovereign RowSep 3, 2026Test of gas line inspection. call 214-519-1898 if you arrive and have any question
- 308 W Mockingbird LnSep 2, 2026Repair sanitary stoppage inside warehouse & replace outdoor sanitary line service from double clean-outs to the city clean-out
- 1208 Viceroy DrSep 2, 2026Electrical for new generator
- 1455 Round Table Dr · 1515 Roundtable Dr Property LLCAug 10, 20262nd floor data center fit out for prime data centers
- 8181 Ambassador RowJul 30, 2026Waterline repair in front yard
- 7600 Ambassador RowJul 23, 2026--custom 18ft slide gate manualinstallation of one (1) 18-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--custom 37ft slide gate installation of one (1) 37-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--fencing laborlocation:front, right and left side of building excluding the backinstallation of 485 linear feet of 8-foot iron fencingincludes all labor for post setting, panel alignment, and weldingwelding and assembly performed per site requirementscustomer will provide all fencing materialsdemo 190ft of fencing and gates.--liftmaster sl3000 1 hp1/2 and 1 hp ac high traffic commercial slide gate operatorsideal for heavy-traffic applications1/2 hp rated for gates 50ft and 1,000 lbs. 1 hp rated for gates 50ft and 2,000 lbs.integrates easily with liftmaster access control technology.photo eye brackets chain and hardware. --lpr camerainstall and configure a license plate reader (lpr) camera at the gate operator, including:-mounting the lpr camera securely for optimal plate visibility-running and connecting all necessary wiring to the gate operator system-integrating the camera with the gate control software for automated vehicle access--gooseneck post for keypadinstall gooseneck post for keypad, including secure anchoring, proper alignment for vehicle access, and mounting of keypad to meet operational height and safety standards.--unifi g3 intercommounting the intercom unit at the gate locationconnecting to existing network infrastructureconfiguring audio and video functionalityintegrating with the gate access control system for remote entrytesting and verifying proper operation--run ethernet and powerrun ethernet and 120v power cables for the telephone entry system and operatorpull cables from the main network hub and electrical source to the entry unit locationinstall pathways, including cutting concrete where necessaryseal all cuts and penetrations to maintain structural integrityinstall necessary jacks, terminations, and electrical outletstest both ethernet connectivity and 120v power supplyensure full system integration with the building’s communication and power network--safety and exit loopproviding and installing loop detectors and loop harnessessaw-cutting pavement for loop wire placementinstalling and securing loop wire in saw cutsbackfilling and sealing all saw cuts for durabilityconnecting loops to gate operator and integrating with access control systemtesting and verifying full functionality of shadow, interrupt, and exit loopsproviding all labor and materials required for complete installation
- 4500 Irving Blvd · Crown Enterprises, LLCJul 22, 2026Plumbing rough; plumbing top; plumbing final
- 8200 Sovereign Row · Gcats Investments, LLCJul 22, 2026Qteam interior office renovations
- 1107 Conveyor Lane · Conveyor Building 1Jul 16, 2026Cain food — renovation/alteration — tenant improvement of existing shell building, 9,942 sq ft of office, 111,348 sq ft of warehouse, total 121,290 sq ft
- 8617 Ambassador RowJul 9, 2026Installation of a new pallet racking system within an existing commercial warehouse. the scope of work includes the placement of selective pallet rack structures covering approximately 762 square feet of floor area. work consists of anchoring uprights to the existing concrete slab, installing beams, and assembling rack components per the engineered drawings. no modifications will be made to the building’s structural elements, electrical systems, plumbing, or mechanical systems. this project is limited to the installation of storage racks only. all racking will be installed per the stamped engineering plans and calculations provided, and the system will be used for high?pile storage as defined by the fire code
- 4816 Alexander LnJun 29, 2026Electric to show potential tenantsneed power meter unlocked so i can have electricty to show potential tenants
- 3233 Irving BlvdJun 24, 2026(2) new hvac systems
- 3280 Quebec StJun 16, 2026Adding 3 security gates to the 3 front docks
- 3145 Halifax StApr 24, 2026Electrical
- 9130 Premier Row · Solkorp LLCApr 15, 2026Install 2 walk in coolers and a blast freezer for food storage
- 3434 Doug DrApr 2, 2026Repairing drain in kitchen sink and vent, 8 feet drain will be replaced
- 7410 Ambassador Row · Qi TechMar 30, 2026Install 480v - 380v transformers and distribution panelsinstall feeder to control panels
- 4855 Cash RdMar 26, 2026Add on ductwork for remodel
- 1515 Round Table DrMar 24, 2026• prepare space for customer provided (224) cpi zetaframe, 4-post (800mm x 1200mm), 42 ru racks. racks to be delivered at a later date.• supply and install overhead primary/redundant 400a 415vac busway system as per specification details provided.• supply and install overhead bus taps for all pods.• ensure that distribution pdus are sized in a manner to support 400a busway deployments; 500kva or greater preferred.• add (18) nema 5-15 convenience outlets with grainger w 4xp67 retractable cord reels.• add overhead fiber guide, cable basket and ladder rack as per customer standards.• add two-factor authentication card readers (badge + pin or badge + biometric, quantity per design shown on sheet z1100) and audio light strobe alarm at cage access points.• hot aisle containment solution for all pods to be supported via hard blanking panels.• install infrastructure (conduit, back boxes, cat6 cabling, etc) for video surveillance cameras per sheet z1500 for customer provided cameras
- 1262 Viceroy DrMar 17, 2026Install receptacles
- 3434 Easy StMar 9, 2026Add one toilet and sink to warehouse
- 3145 Halifax Street · Halifax Street LLCFeb 24, 2026Halifax office warehouse remodel — renovation/alteration — remodel office in existing office/warehouse
- 8607 Ambassador RowJan 30, 2026Electrical remodel
- 5020 Sharp StDec 29, 2025Qteam qr demolition the receiving, staging, workroom area. demolition 3 offices, storage room and parts storage. all walls are non-structural
- 5101 Norwood RdNov 10, 2025Mcr the warehouse has an office space inside, the ceiling to this office space is a false ceiling since it does not reach the warehouse ceiling. i want to raise this "false ceiling" from 8ft up to 12ft
- 8400 Ambassador RowNov 3, 2025Interior plumbing remodel
- 1380 River Bend DrOct 23, 2025Remove existing gravel roof and install emulsion system and silicon coating over emulsion system
- 3184 Quebec StOct 10, 2025Recreation of 1907081134* new warehouse & workshop added to back of existing warehouse
- 3511 Irving BlvdOct 7, 2025Gas test-vacant, empty warehouse
- 4800 Lakawana StOct 3, 2025Detach electrical for wall replacement and reattach
- 5025 Cash RdSep 23, 2025Mcr code upgrades, including new automatic fire sprinkler system, to an existing 1-story non-sprinklered metal building, 12,250 sq ft in size, used for storage (s-1) commercial vehicle repair garage; and an interior renovation to convert a 2,275 sq ft portion of the existing space to an office (b) and restroom area (non-separated uses)
- 1113 Conveyor LnSep 19, 2025Adding toilets, floor drains, mop sinks, water heater, kitchen sink, drinking fountain
- 750 Regal RowAug 15, 2025Check all plumbing up to code
- 4844 Don DrJul 30, 2025Security fence on warehouse
- 4843 Norma StMay 13, 2025Vacant lot, new construction for multi purpose light industrial garage
Questions
What warehouses & industrial are being built in Dallas 75247?
48 addresses in 75247 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 3020 Pegasus Park Dr. Others include 4545 Leston Ave, 3817 Irving Blvd, 4211 Irving Blvd.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.