7410 Ambassador Row
Dallas, TX 75247 · Qi Tech
Qi Tech equipment and electrical work at 7410 Ambassador Row
Permits indicate Qi Tech is installing equipment and making interior and electrical changes at 7410 Ambassador Row. The first listed city permit, for a partial interior remodel, was filed July 18, 2025; electrical permits followed on February 17 and March 30, 2026.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Mar 30, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Mar 30, 2026
- since Jul 26, 2024
- Largest scope
- 30,000 sf
- Estimated cost
- $160K
- state registration
Where this project stands
Finishing up · inspection nextQI Tech
23,000 sq ft · $85K est.
- RegisteredJun 25, 2025
- Plan review
- ConstructionJul '25 – Oct '25
- Inspectednow
- Closed
Scheduled to finish Oct 24, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 1 phone number
Permit & project history
5 projectsEquipment installation — qi tech
TDLR project registrationRenovation/AlterationReview Complete23,000 sq ft$85K est.- Project #
- TABS2025022037
- Tenant / owner
- Qi Tech
- Design firm
- Pro
- Contact
- Pro
Renovation / alteration — qi manufacturing
TDLR project registrationRenovation/AlterationProject Closed30,000 sq ft$160K est.- Project #
- TABS2024024046
- Tenant / owner
- Qi Tech
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 7410 Ambassador Row
What is being built at 7410 Ambassador Row?
Permits indicate Qi Tech is installing equipment and making interior and electrical changes. The records do not describe a new building.
What is going in at 7410 Ambassador Row in Dallas?
A TDLR registration lists a 23,000-square-foot Qi Tech renovation and equipment installation. City permits also cover a partial interior remodel and electrical work for production lines.
What electrical work is permitted at 7410 Ambassador Row?
Permits filed February 17 and March 30, 2026, describe installing transformers and distribution panels, including feeders to control panels.
When was the work at 7410 Ambassador Row permitted?
The TDLR project registration is dated June 25, 2025, and the first listed city permit was filed July 18, 2025. Additional electrical permits were filed February 17 and March 30, 2026.
How much will the Qi Tech project at 7410 Ambassador Row cost?
The TDLR registration lists an applicant-estimated project cost of $85,000. This is an estimate, not a confirmed final cost.
What's happening near the Halifax Office Warehouse Remodel?
At 7410 Ambassador Row, about 376 meters from the Halifax Office Warehouse Remodel at 3145 Halifax Street, permits indicate Qi Tech equipment installation and interior and electrical work.
Also being built nearby
All of 75247- 1010 W Mockingbird Ln. 1010 W Mockingbird Ln · County Of Dallas CountyMar 27, 2024Dallas county emergency operations center — new construction — new construction – one story office building with warehouse and storm shelter, including site alterations · 26 m away
- 1010 W Mockingbird LnSep 12, 2025Ground up emergency operations center for dallas county. includes public and private utilities. will have a generator, fire sprinkler, fire alarm, access control, and ev chargers · 26 m away
- 1010 MockingbirdSep 12, 2025Ground up emergency operations center for dallas county. includes public and private utilities. will have a generator, fire sprinkler, fire alarm, access control, and ev chargers. 2407231061_189885740-003 · 26 m away
- 7600 Ambassador RowJul 23, 2026--custom 18ft slide gate manualinstallation of one (1) 18-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--custom 37ft slide gate installation of one (1) 37-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--fencing laborlocation:front, right and left side of building excluding the backinstallation of 485 linear feet of 8-foot iron fencingincludes all labor for post setting, panel alignment, and weldingwelding and assembly performed per site requirementscustomer will provide all fencing materialsdemo 190ft of fencing and gates.--liftmaster sl3000 1 hp1/2 and 1 hp ac high traffic commercial slide gate operatorsideal for heavy-traffic applications1/2 hp rated for gates 50ft and 1,000 lbs. 1 hp rated for gates 50ft and 2,000 lbs.integrates easily with liftmaster access control technology.photo eye brackets chain and hardware. --lpr camerainstall and configure a license plate reader (lpr) camera at the gate operator, including:-mounting the lpr camera securely for optimal plate visibility-running and connecting all necessary wiring to the gate operator system-integrating the camera with the gate control software for automated vehicle access--gooseneck post for keypadinstall gooseneck post for keypad, including secure anchoring, proper alignment for vehicle access, and mounting of keypad to meet operational height and safety standards.--unifi g3 intercommounting the intercom unit at the gate locationconnecting to existing network infrastructureconfiguring audio and video functionalityintegrating with the gate access control system for remote entrytesting and verifying proper operation--run ethernet and powerrun ethernet and 120v power cables for the telephone entry system and operatorpull cables from the main network hub and electrical source to the entry unit locationinstall pathways, including cutting concrete where necessaryseal all cuts and penetrations to maintain structural integrityinstall necessary jacks, terminations, and electrical outletstest both ethernet connectivity and 120v power supplyensure full system integration with the building’s communication and power network--safety and exit loopproviding and installing loop detectors and loop harnessessaw-cutting pavement for loop wire placementinstalling and securing loop wire in saw cutsbackfilling and sealing all saw cuts for durabilityconnecting loops to gate operator and integrating with access control systemtesting and verifying full functionality of shadow, interrupt, and exit loopsproviding all labor and materials required for complete installation · 122 m away
- 7118 Envoy CtDec 4, 2025Gas test · 153 m away
- 7138 Envoy CtJun 9, 2025Installing new 1/2" rpz for customer supplied ice machine · 181 m away
- 7151 Envoy CtJul 24, 2023Tentant finishout commerical remodel · 209 m away
- 7161 Envoy CtJun 17, 2025John manville glasply iv two ply spot repair's & hot-tar top coat, flood coat resurfacing installment.built up areas.- repaired areas two ply installment.- installment over roofing insulation.- cracks in the roof.- pipes- vents.- exhaust fans.- drains, drains.- penetrations.- erosion and deterioration areas.- perimeter of the entire roof- rtu curbs additional roof curbs.- replacement of counter flashing.- replacement of hvac counter flashing.- metal canopy roof repairs.- parapet wall removal and replacement of modified building cap sheets.- concrete parapet wall joint sealant.- removal and replacement of pitch pockets.- hot-tar resurfacing installment throughout the entire roof & re emed the gravel · 216 m away
- 7263 Envoy CtAug 21, 2026Changed all ductwork · 234 m away
- 7901 John W Carpenter FwyApr 29, 2026Gas pressure test · 261 m away
- 7901 John Carpenter Freeway · Montgomery Law OfficeFeb 18, 2025Montgomery law office — renovation/alteration — remodel · 261 m away
- 7203 John W Carpenter FwyJan 6, 2026400 amp outdoor panel rack for a truck yard · 297 m away