1010 W Mockingbird Ln. 1010 W Mockingbird Ln
Dallas, TX 75247 · County Of Dallas County
Dallas County registered a 37,000-square-foot emergency operations center
A one-story Dallas County Emergency Operations Center with office space, a warehouse and a storm shelter was registered for new construction on March 27, 2024. The TDLR project registration lists 37,000 square feet and an applicant-estimated cost of $25 million; its status is inspection complete.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 27, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 27, 2024
- since Mar 27, 2024
- Largest scope
- 37,000 sf
- Estimated cost
- $25M
- state registration
Where this project stands
Inspected · closing outDallas County Emergency Operations Center
37,000 sq ft · $25M est.
- RegisteredMar 27, 2024
- Plan review
- ConstructionMay '24 – Dec '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew construction – one story office building with warehouse and storm shelter, including site alterations — dallas county emergency operations center
TDLR project registrationNew ConstructionInspection Complete37,000 sq ft$25M est.- Project #
- TABS2024014829
- Tenant / owner
- Dallas County Emergency Operations Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1010 W Mockingbird Ln. 1010 W Mockingbird Ln
What is being built at 1010 W Mockingbird Lane in Dallas?
A one-story Dallas County Emergency Operations Center is registered for the site, with office space, a warehouse and a storm shelter. The project registration also includes site alterations.
When was the Dallas County Emergency Operations Center project registered?
The TDLR project registration was filed March 27, 2024. Its project number is TABS2024014829.
How big is the Dallas County Emergency Operations Center?
The TDLR registration lists the project at 37,000 square feet.
What is the estimated cost of the project at 1010 W Mockingbird Lane?
The applicant's estimate in the TDLR registration is $25 million. This is an estimate for the project, not a final reported cost.
Is the emergency operations center near Qi Tech?
Yes. The site is listed 26 meters from Qi Tech at 7410 Ambassador Row.
Is construction of the Dallas County Emergency Operations Center complete?
The TDLR project registration lists the status as inspection complete. The record describes new construction of a one-story office building with a warehouse and storm shelter.
Also being built nearby
All of 75247- 1010 MockingbirdSep 12, 2025Ground up emergency operations center for dallas county. includes public and private utilities. will have a generator, fire sprinkler, fire alarm, access control, and ev chargers. 2407231061_189885740-003
- 1010 W Mockingbird LnSep 12, 2025Ground up emergency operations center for dallas county. includes public and private utilities. will have a generator, fire sprinkler, fire alarm, access control, and ev chargers
- 7410 Ambassador Row · Qi TechMar 30, 2026Install 480v - 380v transformers and distribution panelsinstall feeder to control panels · 26 m away
- 7118 Envoy CtDec 4, 2025Gas test · 127 m away
- 7600 Ambassador RowJul 23, 2026--custom 18ft slide gate manualinstallation of one (1) 18-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--custom 37ft slide gate installation of one (1) 37-foot sliding gate with reinforced concrete channel, complete with all required posts, wheels, heavy-duty rollers, and track system. scope includes:fabrication of the gate frame and all necessary hardwaresupply of all materials including posts, wheels, rollers, and trackexcavation and pouring of reinforced concrete channelinstallation of gate posts and alignment for proper supportmounting of heavy-duty rollers and track systemfinal assembly and adjustments for smooth and reliable operation--fencing laborlocation:front, right and left side of building excluding the backinstallation of 485 linear feet of 8-foot iron fencingincludes all labor for post setting, panel alignment, and weldingwelding and assembly performed per site requirementscustomer will provide all fencing materialsdemo 190ft of fencing and gates.--liftmaster sl3000 1 hp1/2 and 1 hp ac high traffic commercial slide gate operatorsideal for heavy-traffic applications1/2 hp rated for gates 50ft and 1,000 lbs. 1 hp rated for gates 50ft and 2,000 lbs.integrates easily with liftmaster access control technology.photo eye brackets chain and hardware. --lpr camerainstall and configure a license plate reader (lpr) camera at the gate operator, including:-mounting the lpr camera securely for optimal plate visibility-running and connecting all necessary wiring to the gate operator system-integrating the camera with the gate control software for automated vehicle access--gooseneck post for keypadinstall gooseneck post for keypad, including secure anchoring, proper alignment for vehicle access, and mounting of keypad to meet operational height and safety standards.--unifi g3 intercommounting the intercom unit at the gate locationconnecting to existing network infrastructureconfiguring audio and video functionalityintegrating with the gate access control system for remote entrytesting and verifying proper operation--run ethernet and powerrun ethernet and 120v power cables for the telephone entry system and operatorpull cables from the main network hub and electrical source to the entry unit locationinstall pathways, including cutting concrete where necessaryseal all cuts and penetrations to maintain structural integrityinstall necessary jacks, terminations, and electrical outletstest both ethernet connectivity and 120v power supplyensure full system integration with the building’s communication and power network--safety and exit loopproviding and installing loop detectors and loop harnessessaw-cutting pavement for loop wire placementinstalling and securing loop wire in saw cutsbackfilling and sealing all saw cuts for durabilityconnecting loops to gate operator and integrating with access control systemtesting and verifying full functionality of shadow, interrupt, and exit loopsproviding all labor and materials required for complete installation · 139 m away
- 7138 Envoy CtJun 9, 2025Installing new 1/2" rpz for customer supplied ice machine · 155 m away
- 7151 Envoy CtJul 24, 2023Tentant finishout commerical remodel · 187 m away
- 7161 Envoy CtJun 17, 2025John manville glasply iv two ply spot repair's & hot-tar top coat, flood coat resurfacing installment.built up areas.- repaired areas two ply installment.- installment over roofing insulation.- cracks in the roof.- pipes- vents.- exhaust fans.- drains, drains.- penetrations.- erosion and deterioration areas.- perimeter of the entire roof- rtu curbs additional roof curbs.- replacement of counter flashing.- replacement of hvac counter flashing.- metal canopy roof repairs.- parapet wall removal and replacement of modified building cap sheets.- concrete parapet wall joint sealant.- removal and replacement of pitch pockets.- hot-tar resurfacing installment throughout the entire roof & re emed the gravel · 191 m away
- 7263 Envoy CtAug 21, 2026Changed all ductwork · 215 m away
- 7901 John W Carpenter FwyApr 29, 2026Gas pressure test · 242 m away
- 7901 John Carpenter Freeway · Montgomery Law OfficeFeb 18, 2025Montgomery law office — renovation/alteration — remodel · 242 m away
- 7203 John W Carpenter FwyJan 6, 2026400 amp outdoor panel rack for a truck yard · 271 m away