New warehouses & industrial in Dallas 75211
34 addresses in 75211 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 2623 Alco Ave.
Latest filings
- 2623 Alco AveNov 5, 2026Adding one full bathroom with one toilet, one sink and one shower. also adding a washer
- 4300 W Davis StNov 3, 2026Mcr install stone and mortar retaining wallslovett canyon
- 1515 N Cockrell Hill RdOct 30, 2026Removal and replacement of a pre-manufactured, stand-alone, unmanned water vending station placed in 2 leased parking spots in a local shopping plaza. existing utilities to be disconnected and reconnected with new unit. unit is trucked in from our corporate headquarters manufacturing yard, already inspected, approved, and stamped by the state. local review & inspection is primarily on the foundation and utility connections
- 711 N Morocco AveOct 19, 2026Gas test
- 1301 Chalk Hill RdOct 15, 2026Complete hvac system
- 4444 W Illinois AveOct 9, 2026Zo bc interior remodel of an existing 4,844.99 sq ft grocery store commercial tenant space (suite 206). the scope of work includes the interior build-out and layout optimization consisting of a 3,350 sq ft sales floor area, a 396 sq ft walk-in cooler, a 455 sq ft commercial kitchen area, a 229 sq ft storage room, a 221 sq ft checkout counter area, restroom facilities, and a 25 sq ft electrical room. work includes mechanical, electrical, and plumbing (mep) modifications to connect to the existing gas lines and existing exterior grease trap as identified in the construction documents. no exterior footprint or structural expansion is proposed
- 4114 Adler DrSep 30, 2026Electrical installation associated with building permit # com-new-25-000304
- 3700 Pinnacle Point DrSep 30, 2026Remodel
- 4331 Communications DrSep 30, 2026Electrical installation related to building permit # com-new-25-000302
- 210 S Navy AveSep 16, 2026This is building was put in 20 years ago with no permit. it is a bare bones, utility free storage shed for lawn equipment. non-structural repairs had to be made and photos and plans are being submitted with this application. there are no utilites on this building
- 3901 Adler Dr · Fedex Ground Package System, Inc.Sep 14, 2026Install electrical circuits for new conveyors being added to the system
- 2830 W Jefferson BlvdAug 26, 2026Nsfaa-small storage with patio attached
- 4445 Rock Quarry RdAug 13, 2026System upgrade. addition of motors and devices. conveyor
- 4524 W. Davis St · Rag Rental, LLCAug 13, 2026Pinnacle point — new construction — new construction of a 19,200 sq ft warehouse site work to include parking and detention pond facilities
- 1171 N Cockrell Hill Rd · First Industrial Realty Trust, Inc.Aug 6, 2026Install new backflow
- 712 S Walton Walker BlvdJul 22, 2026Unit replacement of ac1 and 2 / add on of 2 - 2ton mini split unitsac 1 - package unitmake: carriermodel #: 48tced16a2a6a0a0a0serial #: 0214p04629age: 12 yearssize: 15.00 tons ac 2 - package unitmake: tranemodel #: ysd300f4rla03serial #: 141010304dage: 12 yearssize: 25.00 tons nextech proposes to: * furnish and supply like to like package units and 2 - 2 ton mini split systems* permit* tie down details* with crane service lift new unit to roof* set and secure factory supplied curb adaptors for units that require them* install and secure new unit per code* reconnect new unit to existing electrical and drain lines* install new service outlet and disconnect.* install factory supplied hail guards and economizer* connect system to existing ems equipment* reconnect to existing duct work* start unit and verify all operations* clean job site* complete final permit inspection ***exclusions*** * permitting * engineered drawing, if required for permitting * any electrical upgrades not included in normal disconnect and reconnect * any controls upgrades not included in normal disconnect and reconnect * fire/smoke devices and control upgrades required by code * fire alarm inspection * road closure permit, if required * parking fees * security if needed or required. * modifications to walls or structures surrounding the new unit * structural steel work if needed * chill water treatment, or rust prevention. * any roof leaks from exhaust fans * any fines or penalties from the city * any roofing work needed
- 5525 W Illinois AveJul 21, 2026Hvac changeout/alteration
- 4001 Adler DrJul 21, 2026Electrical instalation of 3 circuits for each of 3 receptacles
- 4502 Ridge Point DrJul 21, 2026Install temporary electrical service to supply power to a temporary construction field office trailer for the chalk hill trail phase 1 project. work includes installation of a temporary service pole, meter socket, service disconnect, distribution equipment, grounding and bonding, feeders, branch circuits, and all associated wiring necessary to provide electrical service to the temporary construction trailer. the installation is intended solely to support project management, administrative operations, safety meetings, inspections, and construction activities for the duration of the project. all work will be performed in accordance with the currently adopted national electrical code (nec), city of dallas requirements, and applicable utility provider standards. upon completion of the project, the temporary electrical service and associated equipment will be removed
- 3000 Mountain Creek PkwyJul 13, 2026Installation of elecrical for new construction- third floor
- 1030 N Justin AveJul 7, 2026Meter inspection ; again work was already done but owner never called oncor
- 321 Stillwell BlvdJun 24, 2026Storage addition
- 4540 Las Haciendas DrJun 11, 2026Nsfaa-storage for tools
- 5504 Goodman StJun 9, 2026Nsfaa scope of work: additional storage to the rear part of the exciting garage and adding second floor leading to the second floor, the attic it's already exciting where just adding an easy access to the attic, which is adding stairs, no emp at all. also adding a proposed porch in the rear back
- 2707 W Jefferson BlvdMay 31, 2026New addition to the first floor for a bar.329 sq/ftnew addition to the second floor for storage.329 sq/fttotal 658 sq/ft
- 3835 Glenhaven BlvdMay 21, 2026Battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw/13.5kwh [240v] 01 tesla gateway 3
- 4536 Via San AntonioMay 21, 2026Battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw (240v) 01 tesla gateway 3
- 3314 Brandon StMay 19, 2026Nsfaa proposed a storage attached to a detached garage
- 310 S Barnett AveMay 11, 2026Nsfaa 20 ft by 30 ft storage and tool shed, no electric or plumbing
- 2131 Leander DrApr 24, 2026Install 110v outlets and 220v outlets
- 650 South Walton Walker Boulevard · Supreme Estate Investment, LLCMar 25, 2026Supreme one auto — new construction — new construction for office/warehouse development
- 3105 W Colorado BlvdFeb 11, 2026Install new plumbing for bathroom addition
- 4617 Lynnacre DrDec 31, 2025Nsfaa addition storage room and prayer rol
- 4114 Adler Drive · Pinnacle Park 1, LLCDec 18, 2025Pinnacle 30 park — new construction — the construction of a 75,046 sq ft cold dark shell warehouse made of concrete tilt wall panels over a slab on grade
- 4331 Communications Drive · Pinnacle Park 1, LLCDec 18, 2025Pinnacle 30 park — new construction — the construction of a 207,189 sq ftcold dark shell warehouse made of concrete tilt wall panels over a slab on grade
- 3901 Adler Drive · Bprep I-30 LPMay 20, 2025Linehaul office interior build-out — renovation/alteration — new interior office build-out in existing concrete tilt wall fedex distribution facility, including new interior walls, finishes and two new single-user restrooms
- 4410 Dallas Fort Worth Turnpike · Shops At Pinnacle Park LLC C/O Vista Property Company LLCSep 9, 2024America's best contacts & eyeglasses — renovation/alteration — demolition of previous tenant's layout including non-bearing partitions, doors, ceiling grid and finishes. new partitions, doors & frames, ceiling grid, lighting, hvac distribution, plumbing fixtures, finishes, furniture and equipment. 5293 sq ft
- 4117 Pinnacle Point Dr · Pinnacle ParkJun 3, 2024Air vent — renovation/alteration — interior office break room expansion/ renovation within existing office/ warehouse building
Questions
What warehouses & industrial are being built in Dallas 75211?
34 addresses in 75211 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 2623 Alco Ave. Others include 4300 W Davis St, 1515 N Cockrell Hill Rd, 711 N Morocco Ave.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.