What's being built in Dallas 75211
876 Dallas addresses in 75211 had a building permit or project filing in the past 12 months, out of 1,267 on record. The most active project types are restaurants (63), solar installs (44), warehouses & industrial (34). The latest filing here was November 13, 2026.
- Active in last 12 mo
- 876
- Addresses on record
- 1,267
- Latest filing
- Nov 13, 2026
By project type
Recent commercial projects
- 2534 W Davis StNov 13, 2026Electrical install
- 2233 Mountain Creek PkwyNov 12, 2026Exterior lights under the main entrance canopy will be replaced. an additional wall light will be added at the north side of the building. existing wall lights on all sides of the building will be placed with new fixtures. light fixtures on existing pole lights will be replaced. new light poles will be installed at the south side of the parking lot and along the drive leading to the parking lot
- 2488 S Cockrell Hill RdNov 12, 2026Service release -no work
- 6875 W Kiest BlvdNov 12, 2026Install (8) split systems ductwork, exhaust fans, dryer, crawl space exhaust, dedicated outside air system
- 1521 N Cockrell Hill Rd · Walmart 5147Nov 11, 2026Mcr install (1) dedicated 30-amp outlet in the online grocery pickup area for a cooler
- 3903 Orlando CtNov 10, 2026Mcr interior remodel
- 401 S Hampton RdNov 10, 2026Bc el fire reuse the existing 16' x 14' concrete equipment pad and extend it to 16' x 21'. relocate and reuse the existing other-carrier meter. install one 12' h-frame, two span panels, four new tesla powerwall 3 units, two new tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200-amp meter in the existing meter location, four nodes, and one ground bar. provide conduit runs from the h-frame to the nodes and install fiber handholes, with the final quantity to be determined by the contractor
- 1200 Stone Mesa DrNov 9, 2026Installation of sleekfence lineara8' tall privacy fence – blackfurnish and install 1,030 lf of 8' tall sleekfence lineara, color to be black.perimeter fence included.1ea double swing gate: one inactive leaf secured with drop rod; one active leaf equipped with detex panic device.posts to be spaced 6' on center and set 18" x 48" in concrete.3. dumpster gates with sleek fence infillfurnish and install 2ea double swing gates, 8' tall x 9' opening, with provisions for a padlock.gates to include sleek fence infill.posts to be furnished and installed by others (anchor excludes).4. 8' tall louver gates – the anchor group (main entrance / exit gates)furnish and install the following louver gates, fabricated from aluminum vented wall panel (65-63-100) and powder coated black:1ea double swing gate: 28' wide x 8' tall, with provisions for a padlock.1ea automated v-track slide gate: 28' wide x 8' tall
- 1501 N Walton Walker BlvdNov 9, 2026Reconfiguration of existing chain link fence and gates. changing layout and gates to allow larger trucks to access the parking lot. remove existing chain link, gates, and operators. install 146' of new 8' tall galvanized chain link. install (2) 8' x 26' chain link slide gates with slide gate operators. gates only secure a parking lot, no structure is located in this parking lot area, no fire lane, no fire safety access equipment included
- 300 S Smith StNov 8, 2026Electrical remodel take over job
- 2801 S Ledbetter DrNov 6, 2026Removal of antennas, cabinets and supporting equipment
- 4912 W Davis StNov 6, 2026Tear off existing roof to metal deck and mechanically attach 2 layers of 2.2 polyiso insulation (r25) and.60mil tpo membrane. no change to pitch
- 2804 S Cockrell Hill RdNov 5, 2026Relocate gas meter
- 1444 N Cockrell Hill RdNov 4, 2026Zo bc install selective pallet racking within suite 106 of an existing building. pallet racking was previously installed in this space. no change of use or occupancy
- 4300 W Davis StNov 3, 2026Mcr install stone and mortar retaining wallslovett canyon
Latest filings
- 2534 W Davis StNov 13, 2026Electrical install
- 831 Blue Grass DrNov 13, 2026New line in the yard....gas test needed
- 2233 Mountain Creek PkwyNov 12, 2026Exterior lights under the main entrance canopy will be replaced. an additional wall light will be added at the north side of the building. existing wall lights on all sides of the building will be placed with new fixtures. light fixtures on existing pole lights will be replaced. new light poles will be installed at the south side of the parking lot and along the drive leading to the parking lot
- 2488 S Cockrell Hill RdNov 12, 2026Service release -no work
- 2707 Searcy DrNov 12, 2026Installing complete 3-1/2 ton heat pump split air forced system.r-8 duct work throughout copper line setvent hood exhaust galvanized ducting to roof bath exhaust central return in ceiling dryer vent to exterior home will not be foamed
- 2764 W Jefferson BlvdNov 12, 2026Gas pressure test
- 2802 Aster StNov 12, 2026Reroof. tear off down to decking and replace with new drip edge synthetic felt , architectural shingles and ridge cap, ice and water in valleys
- 2912 W Colorado BlvdNov 12, 2026Remove and replace asphalt shingles
- 3319 Gibsondell AveNov 12, 2026Re-roof on property, remove existing roof, repair and rotted wood. add new layer of underlayment, add new starter shingle, hip and ridge shingle and new shingles. add new vents as well
- 4218 Dutton DrNov 12, 2026Remove existing shingles and install new shingles
- 4547 Bonanza LnNov 12, 2026Install 40 gallon gas water heater in hallway closet (swap out)
- 6875 W Kiest BlvdNov 12, 2026Install (8) split systems ductwork, exhaust fans, dryer, crawl space exhaust, dedicated outside air system
- 1521 N Cockrell Hill Rd · Walmart 5147Nov 11, 2026Mcr install (1) dedicated 30-amp outlet in the online grocery pickup area for a cooler
- 2803 Cain BlvdNov 11, 2026Remodeling all electrical outlets,switches etc
- 3711 Dawes DrNov 11, 2026Relocate gas meter
- 2842 Wilton AveNov 10, 2026Mcr with battery13.120 kw dc roof mountsolar pv system with32 american made power solution:amps-410p-54bb 410w pv modules with15 duracell: d600-m2a microinverters02 duracell: d350-m1a microinverters01 duracell power center maxhybrid 15 inverter and 08 duracelldura5 dc-coupled batteries [40 kwh]
- 3844 Mt Ranier StNov 10, 2026Relocate gas meter
- 3903 Orlando CtNov 10, 2026Mcr interior remodel
- 401 S Hampton RdNov 10, 2026Bc el fire reuse the existing 16' x 14' concrete equipment pad and extend it to 16' x 21'. relocate and reuse the existing other-carrier meter. install one 12' h-frame, two span panels, four new tesla powerwall 3 units, two new tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200-amp meter in the existing meter location, four nodes, and one ground bar. provide conduit runs from the h-frame to the nodes and install fiber handholes, with the final quantity to be determined by the contractor
- 4935 Larue StNov 10, 2026Re-roof: no re-deck
- 1200 Stone Mesa DrNov 9, 2026Installation of sleekfence lineara8' tall privacy fence – blackfurnish and install 1,030 lf of 8' tall sleekfence lineara, color to be black.perimeter fence included.1ea double swing gate: one inactive leaf secured with drop rod; one active leaf equipped with detex panic device.posts to be spaced 6' on center and set 18" x 48" in concrete.3. dumpster gates with sleek fence infillfurnish and install 2ea double swing gates, 8' tall x 9' opening, with provisions for a padlock.gates to include sleek fence infill.posts to be furnished and installed by others (anchor excludes).4. 8' tall louver gates – the anchor group (main entrance / exit gates)furnish and install the following louver gates, fabricated from aluminum vented wall panel (65-63-100) and powder coated black:1ea double swing gate: 28' wide x 8' tall, with provisions for a padlock.1ea automated v-track slide gate: 28' wide x 8' tall
- 1214 N Bagley StNov 9, 2026Gas test
- 1501 N Walton Walker BlvdNov 9, 2026Reconfiguration of existing chain link fence and gates. changing layout and gates to allow larger trucks to access the parking lot. remove existing chain link, gates, and operators. install 146' of new 8' tall galvanized chain link. install (2) 8' x 26' chain link slide gates with slide gate operators. gates only secure a parking lot, no structure is located in this parking lot area, no fire lane, no fire safety access equipment included
- 2403 Searcy DrNov 9, 2026Gas test only
- 2710 Kingston StNov 9, 2026Remodeling one shower one watercloset washer and dyrer
- 4530 Briarglen DrNov 9, 2026Gas line repair
- 511 BotanyNov 9, 2026Adjust existing pilings
- 706 Cherry Laurel LnNov 9, 2026Gas test
- 922 Hartsdale DrNov 9, 2026Service upgrade
- 300 S Smith StNov 8, 2026Electrical remodel take over job
Questions about 75211
What is being built in 75211?
876 Dallas addresses in 75211 had a building permit or project filing in the past 12 months, out of 1,267 on record. The most active project types are restaurants (63), solar installs (44), warehouses & industrial (34). The latest filing here was November 13, 2026.
What new commercial projects are in Dallas 75211?
Recent commercial filings include 2534 W Davis St, 2233 Mountain Creek Pkwy, 2488 S Cockrell Hill Rd.