New offices in Dallas 75211
20 addresses in 75211 have permits or project filings for offices in the last two years. The most recent was filed at 2233 Mountain Creek Pkwy.
Latest filings
- 2233 Mountain Creek PkwyNov 12, 2026Exterior lights under the main entrance canopy will be replaced. an additional wall light will be added at the north side of the building. existing wall lights on all sides of the building will be placed with new fixtures. light fixtures on existing pole lights will be replaced. new light poles will be installed at the south side of the parking lot and along the drive leading to the parking lot
- 4300 W Davis StNov 3, 2026Mcr install stone and mortar retaining wallslovett canyon
- 1301 Chalk Hill RdOct 15, 2026Complete hvac system
- 3700 Pinnacle Point DrSep 30, 2026Remodel
- 2626 Duncanville RdSep 25, 2026Chimney rebuild on building l at mountain ridge apartments. framing and siding replacement only. not going back with fireplace only rebuilding chimney stack for appearance
- 2615 W Colorado BlvdSep 22, 2026Dsst disd stevens park kitchen electrican kitchen remodel com-ph-alt-add-26-000418
- 3901 Adler DrSep 14, 2026Install electrical circuits for new conveyors being added to the system
- 5224 W Jefferson Blvd · Estrada Law OfficesSep 8, 2026Estrada law offices5224 w. jefferson blvdconstruct new one story office building and associated site development
- 3000 Fort Worth AveAug 26, 2026Zo bc the site as built expanded the construction permitted. this permit is for the non-originally permitted construction alterations, including relocation of offices and new suite assignments
- 1171 N Cockrell Hill Rd · Taylor Farms West End Office MezzanineAug 6, 2026Install new backflow
- 4502 Ridge Point DrJul 21, 2026Install temporary electrical service to supply power to a temporary construction field office trailer for the chalk hill trail phase 1 project. work includes installation of a temporary service pole, meter socket, service disconnect, distribution equipment, grounding and bonding, feeders, branch circuits, and all associated wiring necessary to provide electrical service to the temporary construction trailer. the installation is intended solely to support project management, administrative operations, safety meetings, inspections, and construction activities for the duration of the project. all work will be performed in accordance with the currently adopted national electrical code (nec), city of dallas requirements, and applicable utility provider standards. upon completion of the project, the temporary electrical service and associated equipment will be removed
- 5525 W Illinois AveJul 21, 2026Hvac changeout/alteration
- 1100 N Walton Walker BlvdJul 14, 2026Garage room
- 3000 Mountain Creek Parkway · Dbu Ford Village Phase 5 Calabria HallJun 22, 2026Dbu ford village phase 5 calabria hall — new construction — a new 2-story residential college style housing development for year-round occupancy by upperclassmen, consisting of four 2-story dwelling units
- 650 South Walton Walker Boulevard · Supreme One AutoMar 25, 2026Supreme one auto — new construction — new construction for office/warehouse development
- 3109 W Davis StMar 24, 2026Installation of 3 exit signs and ensuring that all existing electrical meet the minimum requirements for the nec
- 302 S Ravinia DrMar 6, 2026Nsfaa-replace the existing carport that is located at the rear of the house adjacent to the alley. i have attached the plat maps to the building plans--please note that while the alley at the rear of the house has a name (weston), according to tommy bullard in the surveyor's office, weston was dedicated as an alley in the plat map.the existing and replacement carport satisfy the setback requirements for a carport in a rear yard per dallas city code.if for whatever reason you do not recognize weston as an alley and insist that it is a street, then i respectfully request an exception to the minimum front yard requirements as stipulated in sec. 51a-4.401 minimum front yard of the dallas city code. specifically, sec. 51a-4.401 subsection (c), special exception for carports, states: (1) the board may grant a special exception to the minimum front yard requirements in this section for a carport for a single family or duplex use when, in the opinion of the board: (a) there is no adequate vehicular access to an area behind the required front building line that would accommodate a parking space; and (b) the carport will not have a detrimental impact on surrounding properties. (2) in determining whether to grant this special exception, the board shall consider the following factors: (a) whether the requested special exception is compatible with the character of the neighborhood. (b) whether the value of surrounding properties will be adversely affected. (c) the suitability of the size and location of the carport. (d) the materials to be used in construction of the carport.as you can see from the building plans, there is no adequate vehicular access to an area behind the required front building line that would accommodate a parking space. the carport will not have a detrimental impact on the surrounding properties as it is replacing an existing carport, it is compatible with the character of the neighborhood as over half the houses on the block have a carport along the alley, the size and location is identical to the existing carport, and the materials to be used (metal) are standard carport materials.thank you for your time
- 4305 Pinnacle Point DrJan 15, 20262 access holes in concrete1 access hole in dirt5 feet of tunnel to repair existing sewer line
- 4992 Wisteria StOct 5, 20253- bathroom updated
- 3601 Pinnacle Point DrSep 30, 2025Replacing stolen wire
Questions
What offices are being built in Dallas 75211?
20 addresses in 75211 have permits or project filings for offices in the last two years. The most recent was filed at 2233 Mountain Creek Pkwy. Others include 4300 W Davis St, 1301 Chalk Hill Rd, 3700 Pinnacle Point Dr.
How can I find out when a new office is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new office permit is filed.