New offices in Dallas 75218
20 addresses in 75218 have permits or project filings for offices in the last two years. The most recent was filed at 11411 E Northwest Hwy.
Latest filings
- 11411 E Northwest HwyNov 13, 2026In reference to co-26-005156 and building code official meeting.minor interior alterations to accommodate the proposed change of occupancy. work includes converting an existing office into a new restroom, constructing limited interior partitions for storage and a decor staging area, and associated plumbing modifications.existing electrical and hvac systems will remain unchanged and are in working condition. no new electrical or hvac work is proposed. existing and proposed floor plans are attached for reference
- 11351 Rupley LnNov 10, 2026Building an office building in bakyard
- 11255 Garland Rd · Casa Linda Animal HospitalNov 6, 2026Exp bu zo me pl rar interior alteration of an existing tenant space for a veterinary hospital, including demolition and new interior partitions, finishes, plumbing, mechanical, electrical and associated improvements
- 9318 Alta Mira DrOct 22, 2026Sewer water and gas to 3 restrooms and plumbing to washing machine
- 718 N Buckner Blvd · My GymOct 16, 2026Me tenant improvements
- 833 Creekridge DrOct 16, 2026Remodel to include foyer, living area, sunroom, yoga area, kitchen/breakfast area, office, art studio, and utility area
- 8647 San Leandro DrSep 30, 2026Nsfaa-permit application for repair and expansion of an existing detached accessory structure at the rear of the property. a portion of the existing structure is in disrepair and will be repaired/reconstructed. proposed work includes an approximately 14 foot expansion toward the main residence resulting in 67.63. linear feet of expansion. the finished space will retain the existing bathroom and sink area. work may include framing, roofing, siding, windows/doors, electrical, plumbing associated with the existing bathroom and sink, insulation, drywall, and interior finishes. the structure will remain detached from the main residence and will be used as office space. all work will comply with applicable city of dallas zoning and building code requirements
- 8368 San Cristobal DrAug 11, 2026Nsfaa-building a new construction two-story single-family home. the first floor will have an open-concept, a kitchen, a pantry, a dining room, a covered patio, a powder bathroom, storage, a mudroom, and an attached three-car garage, hidden kitchen , guest bedroom, office and gym. the second floor will have 4 bedrooms and 4 bathrooms
- 8410 San Leandro DrJul 31, 2026Kitchen / restroom
- 848 Harter RdJul 16, 2026Wiring up new lighting and adding circuits
- 565 Bondstone DrJul 9, 2026Installation of a complete 2 ton ac system to addition
- 1151 N Buckner BlvdJul 8, 2026Commercial remodel
- 1010 Emerald Isle · Jlb Emerald IsleJun 18, 2026Jlb emerald isle — new construction — leasing office
- 9124 San Fernando WayApr 7, 2026Daughter had a shed built as a surprise and didn't know she had to pull a permit. shed built in backyard. 28ft long, 22ft weight, 16ft height. i went to the office off jefferson and they advise me to pull permit and have it inspected. the city said to use the permit for fence since it didn't have a shed permit option
- 8525 Garland RdMar 9, 2026Commercial tear off and reroof
- 10715 Garland RdDec 4, 2025Continuation of permit # 2307071150_181885600-029_me_1first permit expired. i need to renew so that final inspections can be scheduled
- 1606 Old Gate LnNov 17, 2025Nsfaa-restoration scope of work following collision damagethe work proposed is a restoration to repair structural and finish damage caused by a vehicle collision impacting the dwelling. the scope is confined to the interior spaces shown damaged on the plan (office, guest bath, and adjacent hall) and does not include any non-damage-related remodeling or additions.general structural & wall repair:demolition and removal of all damaged wall and door assemblies in the office and guest bath where impact occurred, as depicted by the framing details (e.g., around the door opening between the office and guest bath, and potentially framing related to w1-03 and w1-07 windows).re-framing and patching of damaged load-bearing or partition walls in the affected areas to meet code specifications.installation/reinstallation of windows w1-03 (office) and w1-07 (guest bath) if they were damaged or removed for access.office restoration (area: 201 sq ft):repair of damaged wall surfaces (e.g., drywall/plaster, tape, and finish).installation of new wood flooring to match existing or replace the entire area as required for a seamless repair.restoration of electrical components, including re-running/reconnecting wiring for any outlet or switch that was damaged or required relocation for framing repair (e.g., the planned floor outlet conduit connection).guest bath restoration (area: 75 sq ft):removal and replacement of damaged plumbing fixtures, tile, and wall finishes as necessary to restore the space to its pre-damage condition.installation of new tile flooring and associated wall patching/finishing.restoration of the plumbing and electrical systems within the room to full operational status.hall restoration (area: 63 sq ft):repair of any damaged wall finishes in the hall adjacent to the impact zone.installation of new wood flooring to match the restored office area.this scope is strictly limited to repairing the structure, systems, and finishes damaged by the collision to return the structure to its pre-loss condition
- 10909 Jupiter RdOct 3, 2025Zo bc would like to add an mobile certified commercial office 8x20 container that was built into an office so i can use as my office in the lot at 10909 jupiter rd dallas texas insted of building a wall inside the existing building
- 9352 Angora StSep 24, 2025Gas test using air pressure. the property is a duplex, but since we are doing only one unit, i registered the permit as a residential single family. this is the way the buildng inspection office told me to do so i wouldn't get charged for two units of the duplex residence
- 1415 San Saba DrJun 17, 2025Installing mini split in an in home office room
Questions
What offices are being built in Dallas 75218?
20 addresses in 75218 have permits or project filings for offices in the last two years. The most recent was filed at 11411 E Northwest Hwy. Others include 11351 Rupley Ln, 11255 Garland Rd, 9318 Alta Mira Dr.
How can I find out when a new office is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new office permit is filed.