groundranger
Active · latest filing Sep 2026Residential

8647 San Leandro Dr

Dallas, TX 75218

Detached accessory structure expansion for office space

A detached accessory structure at 8647 San Leandro Dr is slated for repair and expansion for use as office space. City of Dallas permit applications were filed on September 8 and September 30, 2026. The proposed work includes an approximately 14-foot expansion and repairs to the existing structure.

Summarized from City of Dallas records · updated Sep 30, 2026

Projects
2
2 filings
Latest filing
Sep 30, 2026
since Sep 8, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Nsfaa-permit application for repair and expansion of an existing detached accessory structure at the rear of the property. a portion of the existing structure is in disrepair and will be repaired/reconstructed. proposed work includes an approximately 14 foot expansion toward the main residence resulting in 67.63. linear feet of expansion. the finished space will retain the existing bathroom and sink area. work may include framing, roofing, siding, windows/doors, electrical, plumbing associated with the existing bathroom and sink, insulation, drywall, and interior finishes. the structure will remain detached from the main residence and will be used as office space. all work will comply with applicable city of dallas zoning and building code requirements

    Nsfaa-permit application for repair and expansion of an existing detached accessory structure at the rear of the property. a portion of the existing structure is in disrepair and will be repaired/reconstructed. proposed work includes an approximately 14 foot expansion toward the main residence resulting in 67.63. linear feet of expansion. the finished space will retain the existing bathroom and sink area. work may include framing, roofing, siding, windows/doors, electrical, plumbing associated with the existing bathroom and sink, insulation, drywall, and interior finishes. the structure will remain detached from the main residence and will be used as office space. all work will comply with applicable city of dallas zoning and building code requirements

    City of Dallas permitResidential Alteration Addition Permit
    Record
    RES-ALT-ADD-26-001821
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Permit application for repair and expansion of an existing detached accessory structure at the rear of the property. a portion of the existing structure is in disrepair and will be repaired/reconstructed. proposed work includes an approximately 14 foot expansion toward the main residence resulting in 67.63. linear feet of expansion. the finished space will retain the existing bathroom and sink area. work may include framing, roofing, siding, windows/doors, electrical, plumbing associated with the existing bathroom and sink, insulation, drywall, and interior finishes. the structure will remain detached from the main residence and will be used as office space. all work will comply with applicable city of dallas zoning and building code requirements

    Permit application for repair and expansion of an existing detached accessory structure at the rear of the property. a portion of the existing structure is in disrepair and will be repaired/reconstructed. proposed work includes an approximately 14 foot expansion toward the main residence resulting in 67.63. linear feet of expansion. the finished space will retain the existing bathroom and sink area. work may include framing, roofing, siding, windows/doors, electrical, plumbing associated with the existing bathroom and sink, insulation, drywall, and interior finishes. the structure will remain detached from the main residence and will be used as office space. all work will comply with applicable city of dallas zoning and building code requirements

    City of Dallas permitResidential Accessory Structure Permit
    Record
    RES-ACC-26-001170
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 8647 San Leandro Dr

What is being built at 8647 San Leandro Dr?

City of Dallas permit applications describe repairs and an expansion to an existing detached accessory structure at the rear of the property. The finished space is intended for office use.

Is a new office building planned at 8647 San Leandro Dr?

The applications describe expanding and repairing an existing detached structure, not building a new office building. The structure will remain separate from the main residence.

When were permits filed for work at 8647 San Leandro Dr?

The City of Dallas records show applications filed September 8, 2026, under permit RES-ACC-26-001170, and September 30, 2026, under permit RES-ALT-ADD-26-001821.

How much is the detached structure at 8647 San Leandro Dr being expanded?

The permit descriptions call for an approximately 14-foot expansion toward the main residence. They also list the resulting expansion as 67.63 linear feet.

What work is planned for the accessory structure at 8647 San Leandro Dr?

The applications describe repairing or reconstructing a portion that is in disrepair, with possible framing, roofing, siding, windows or doors, electrical and plumbing work, insulation, drywall, and interior finishes. The existing bathroom and sink area will be retained.

Also being built nearby

All of 75218

More offices in 75218.

Get alerts for 8647 San Leandro Dr