Active · latest filing Nov 2026Residential
3711 Dawes Dr
Dallas, TX 75211
Gas meter relocation permitted at 3711 Dawes Dr
A residential plumbing permit indicates a gas meter will be relocated at 3711 Dawes Dr. The City of Dallas permit was filed on November 11, 2026.
Summarized from City of Dallas records · updated Nov 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2026
- since Nov 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3711 Dawes Dr
What work was permitted at 3711 Dawes Dr?
The City of Dallas issued a residential plumbing permit for relocating a gas meter.
When was the gas meter relocation permit filed?
The permit was filed on November 11, 2026.
What is the permit number for 3711 Dawes Dr?
The permit number is RES-PLM-26-012233.
Is the work at 3711 Dawes Dr residential or commercial?
The record classifies it as residential plumbing work.
Does the permit mention other work besides relocating the gas meter?
The permit description lists relocating the gas meter.
Also being built nearby
All of 75211- 3714 Dawes DrApr 7, 2026Gas repipe in house · 14 m away
- 3627 Dawes DrMay 22, 2025Re roof only, no redeck. tear off 1 layer, install 30 yr laminated shingles. color-weatherwood · 104 m away
- 3723 Falls DrOct 27, 2026Replace the existing 1” gas line and connect the water heater furnace and range only inside replace water heater vent pipe and install fresh air vent in the water heater closet · 106 m away
- 3727 Falls DrApr 10, 2026Install (1) 29 gal gas water heater in residential home (change out) · 106 m away
- 3623 Dawes DrNov 6, 2026Relocate gas line · 109 m away
- 3618 Dawes DrSep 4, 2026Replace service and add disconnect upgrade grounding and indoor panel · 115 m away
- 3714 Falls DrNov 16, 2026Nsfaa addition, kitchen extension and addition two floor remodel · 118 m away
- 3718 Falls DrJan 29, 2026Putting in 3 1/2 ton heat pump system, cutting new boots and changing all ductwork · 118 m away
- 3702 Falls DrJul 21, 2025The part along the alley will be 8 feet tall.we’re using metal posts and 8-foot cedar pickets for the whole fence.the homeowner will do all the work · 118 m away
- 3626 Shelley BlvdFeb 26, 2026Gas test · 137 m away
- 3614 Shelley BlvdJan 20, 2021Install roof mounted solar panels · 148 m away
- 3802 Shelley BlvdAug 6, 2026Relocate gas meter · 159 m away