Permit lists tool storage at 4540 Las Haciendas Dr
A City of Dallas residential alteration and addition permit filed June 11, 2026, describes the work as “Nsfaa-storage for tools.” The record does not list a project size or valuation.
Summarized from City of Dallas records · updated Jun 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 11, 2026
- since Jun 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4540 Las Haciendas Dr
What is being built at 4540 Las Haciendas Dr?
A City of Dallas residential alteration and addition permit describes the work as “Nsfaa-storage for tools.”
When was the permit for 4540 Las Haciendas Dr filed?
The permit was filed June 11, 2026. Its number is RES-ALT-ADD-26-001126.
What kind of work is planned at 4540 Las Haciendas Dr?
The permit description lists storage for tools. It is classified as a residential alteration and addition permit.
How much will the work at 4540 Las Haciendas Dr cost?
The City of Dallas permit record does not list a valuation or project cost.
How large is the project at 4540 Las Haciendas Dr?
The permit record does not provide a square footage.
Also being built nearby
All of 75211- 4528 Las Haciendas DrJun 3, 2026Re-roof · 24 m away
- 4518 Bessie DrMar 16, 202650 gal electriccloset · 96 m away
- 4521 Bessie DrDec 2, 2025Replace 3 ton package unit · 107 m away
- 4513 Bessie DrFeb 18, 202650 gallon electric water heater located in kitchen pantry · 114 m away
- 4455 Bessie DrJun 3, 2026Romove and reset the shingles , owner ricardo barrera , sq ft 2120 sq ft · 200 m away
- 4541 Posada DrMar 30, 2026Install 40 gallon electric water heater (swap out) · 210 m away
- 4470 Posada DrAug 22, 2025Mcr installation of a 25 modules - roofmounted - 10.750 kw dc, 7.600 kw ac · 219 m away
- 4455 Las Haciendas DrAug 12, 2025Mcr new pv system 35 modules - 12.950 kw dc, 10.150 kw ac system sizepv module: (35) vsun370-120bmhinverter: (35) enphase iq8plus-72-m-uscombiner: (1) 125a enphase x-iq-am1-240-5cac disconnect: (1) 60a fused ac disconnect with 60a fuses · 227 m away
- 4545 Posada DrJan 27, 2021Remove existing roof and install new roof · 227 m away
- 1720 Western Park DrNov 25, 2025Gas test · 242 m away
- 4502 Ridge Point DrJul 21, 2026Install temporary electrical service to supply power to a temporary construction field office trailer for the chalk hill trail phase 1 project. work includes installation of a temporary service pole, meter socket, service disconnect, distribution equipment, grounding and bonding, feeders, branch circuits, and all associated wiring necessary to provide electrical service to the temporary construction trailer. the installation is intended solely to support project management, administrative operations, safety meetings, inspections, and construction activities for the duration of the project. all work will be performed in accordance with the currently adopted national electrical code (nec), city of dallas requirements, and applicable utility provider standards. upon completion of the project, the temporary electrical service and associated equipment will be removed · 246 m away
- 4573 Posada DrSep 15, 2026Residential roof mounted solar · 252 m away