New warehouses & industrial in Dallas 75287
6 addresses in 75287 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 4952 Cape Coral Dr.
Latest filings
- 4952 Cape Coral DrSep 25, 2026Mcr with battery install energy storage system
- 4403 Creekmeadow DrApr 27, 2026Mcr with battery roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance
- 5108 Ambergate LnDec 15, 2025Install roof mounted pv solar system and energy storage system
- 17504 Ivy Hill DrOct 22, 2025Electrical permit required to close primary record res-solar-25-000307 for residential solar/pv.electrical scope of work has already been reviewed and approved as part of primary record. mcr with battery design and installation of a grid-tied residential solar photovoltaic (pv) system with battery energy storage at 17504 ivy hill drive, dallas, tx 75287. the proposed system consists of 21 meyer burger black 390 w monocrystalline pv modules mounted on the existing pitched asphalt shingle roof using the snapnrack topspeed original racking system. the modules will be installed in one contiguous array on the south-west facing 1st-story roof slope of the attached garage, at a tilt matching the roof pitch of 33°. the pv modules will be electrically connected in series to form strings that feed into an eg4 flexboss 21 hybrid inverter, which will be coupled to an eg4 gridboss microgrid interconnect device and an eg4 powerpro indoor wall-mounted lithium-ion battery for on-site energy storage and backup capability. the system will be interconnected to the utility grid in compliance with nec article 705 for grid-interactive systems, but will not allow excess generation to be exported to the grid. the total system capacity is 8.19 kw dc (390 w × 21 modules). the inverter’s ac output will be connected to the home’s existing electrical service panel via a dedicated solar breaker in accordance with nec 690.64(b) and 705.12(b). conductor sizes, overcurrent protection, and disconnects are selected to meet nec requirements for ampacity and safety. structural loading calculations, based on the 2021 international building code (), asce 7-16, and local amendments, confirm that the added distributed load of 2.41 psf from the pv system is well within allowable limits for the existing roof structure. the snapnrack topspeed racking system is designed and installed per the manufacturer’s installation manual and will provide wind uplift resistance for a basic design wind speed of 106 mph (exposure category b) and a ground snow load of 10 psf. all equipment used in this installation is ul-listed and compliant with the most recent nec, , and city of dallas building and electrical codes. the system will include nec-compliant labeling and placards for rapid shutdown, pv source circuits, ac disconnects, and battery storage. this project will provide the homeowner with renewable energy generation, reduced utility bills, and battery backup capability for resiliency during power outages, while meeting all safety, structural, and code requirements for rooftop solar installations in the city of dallas
- 4100 Spring Valley RdJul 15, 2025New chiller: ch-2 dunham bush mn: wcfx30srvework to be done by msntx scope below:demolition one (1) existing chiller.install one (1) new chiller on existing housekeeping padhms will provide all rigging pertaining to the chiller changeout. recover freon in existing chiller prior to chiller being demoed and be the responsibility of hms to remove from site.remove one existing fan on the north wall in the mechanical room and make an opening to remove the existing chiller and to bring in the new chiller and then put it back.remove the existing pipe stand to allow the chillers to be able to be moved into the mechanical room.receive one (1) chiller and provide 1 month’s storage at crane yard and shipping to job site on day of installation.hms will assist with facilities maintenance in isolating and draining down of existing chiller to be demoed.install one (1) new chiller.modify existing piping to fit new chiller.existing valves to remain.refrigerant relief line from new chiller #1 and tie into existing refrigerant relief line.chill water piping to be insulated with 1-1/2” fiberglass to match existing means and methods.hms will discard of all demoed equipment and be the responsibility of hms to remove from site.hms will remove all trash pertaining to the job and clean work area at end of the day prior to leaving the job site.work to be done during normal hours
- 3931 Walden WayJun 9, 2025Mcr install residential roof mounted solar pv system with battery storage
Questions
What warehouses & industrial are being built in Dallas 75287?
6 addresses in 75287 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 4952 Cape Coral Dr. Others include 4403 Creekmeadow Dr, 5108 Ambergate Ln, 17504 Ivy Hill Dr.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.