New warehouses & industrial in Dallas 75228
24 addresses in 75228 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 8242 Claremont Dr.
Latest filings
- 8242 Claremont DrNov 12, 2026Mcr with battery install energy storage system
- 2702 Andrea LnOct 28, 2026Mcr with battery hilario cedillo - installation of a grid-tied, roof-mounted, 20.91 kw dc solar pv system (51 modules) with a 40 kwh energy storage system (8 batteries). third-party plan review completed under texas sb 1202 by texas power inspections
- 10218 San Juan AveOct 22, 2026Illegal carport in building line to be removed. construct 12' × 20' (240 sq ft) detached non-habitable storage/work shed. electrical work
- 9301 E R L Thornton FwyOct 19, 2026Installation of gas line for new paint booth
- 8459 Banquo DrSep 25, 2026Mcr with battery install roof mounted pv solar system, energy storage system and ev wall connector
- 11714 Featherbrook DrSep 25, 20263rd party - floy allen - installation of a grid tied, roof mounted, solar pv system with battery
- 4115 Fairlakes CtSep 23, 2026Install energy storage system
- 10660 Cayuga DrSep 16, 202647 hyperian runergy hy-dh108p8b 405w modules,2 lion energy-sanctuary ess 12-14.3 (240v) inverter,3 lion energy-sanctuary ess 12-14.3 (240v) battery (total output 42.90 kwh)
- 12025 Shiloh RdAug 31, 2026Clean and show/no work done
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements
- 1832 Mapleton DrJul 17, 2026Alteration/adition
- 3680 Dilido RdJun 18, 2026Mcr project was already built before i moved into the shop. it is a upstairs storage unit with a office
- 2420 Dunloe DrJun 16, 2026I do new electrical for this store
- 10626 Desdemona DrJun 1, 2026Nsfaa-addition small storage at the back of my property this storage will be for tools and a small car as well. it will be a garage storage type
- 11122 Aledo DrMay 21, 2026Battery energy storage system 01 tesla: powerwall 3 1707000-xx-y 11.5 kw (240v) 01 tesla gateway 3
- 10120 Cayuga DrApr 1, 2026Trying again to get added to a master permit for installation of new hvac equipment and duct work
- 2658 Healey DrMar 23, 2026Nsfaa-adding a storage in the back of the house
- 8303 E R L Thornton FwyMar 2, 2026Adding 14 piers to the southwest corner of the building to repair the foundation
- 3027 Shorewood DrFeb 27, 2026Nsfaa we built a shed in the right corner of the backyard. it is room that measures 20x20, 14 ft and 4 inches of height. has 2 windows, one on the front right side of the door and the other on the right wall, both of these windows measure 3x5 and they are verticle slide windows. it has a porch infront that is 8x20. this room has no running systems and is a just a open space room for storage
- 2223 Tealford DrFeb 19, 2026Nsfaa 16x16 shed for storage
- 9319 Vinewood DrJan 22, 2026Form and pour new drive approach
- 10227 Sylvia DrOct 16, 2025Adding 4 receptacles two light switches and a fan and light
- 3008 Klondike DrAug 8, 2025Wh replacement: gas storage 40 gallons
- 8640 E R L Thornton FwyJun 26, 2025We will install a 5 ton complete system with duct work
- 8707 East Rl Thornton Freeway · Jmf Interests, LLCMay 7, 2024La michoacana #37 — additions to existing building — adding 3810 sq ft to the existing building to relocate existing kitchen and restrooms and add storage space
Questions
What warehouses & industrial are being built in Dallas 75228?
24 addresses in 75228 have permits or project filings for warehouses & industrial in the last two years. The most recent was filed at 8242 Claremont Dr. Others include 2702 Andrea Ln, 10218 San Juan Ave, 9301 E R L Thornton Fwy.
How can I find out when a new industrial project is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new industrial project permit is filed.