8915 Stanwood Dr
Dallas, TX 75228
Balcony support girder replacement permitted in Dallas
City of Dallas permits indicate work to replace a deteriorated support girder beneath the balcony at 8915 Stanwood Dr. The residential alteration permits were filed July 17 and July 21, 2026, and describe replacing the girder and reconnecting the balcony floor joists.
Summarized from City of Dallas records · updated Jul 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 21, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsNsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements
Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements
City of Dallas permitResidential Alteration Addition PermitNsfaa balcony beam replacement due to rot-before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work
Nsfaa balcony beam replacement due to rot-before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work
City of Dallas permitResidential Alteration Addition Permit
Sources: City of Dallas
Questions about 8915 Stanwood Dr
What is being built at 8915 Stanwood Dr in Dallas?
City of Dallas permits describe replacement of a deteriorated support girder beneath the home’s balcony. The work also includes reconnecting the balcony floor joists.
Is a new building going up at 8915 Stanwood Dr?
The available permits describe balcony structural repairs, not construction of a new building. They were filed July 17 and July 21, 2026.
When was the balcony repair permitted at 8915 Stanwood Dr?
The City of Dallas records show residential alteration permits filed July 17, 2026 (RES-ALT-ADD-26-001357) and July 21, 2026 (RES-ALT-ADD-26-001379).
Why is the balcony girder being replaced?
The permit descriptions report moisture-related decay and deterioration in the existing laminated veneer lumber girder. They call for replacing it with a matching three-ply girder.
Do the permits say the balcony is safe to use?
The July 21 permit description says the balcony should be treated as structurally compromised until the girder is shored, and that foot traffic and imposed loads should be kept off it. The records do not state the current condition or completion status.
Also being built nearby
All of 75228- 8906 Stanwood DrJun 11, 2025Electrical service repair due to storm damages · 18 m away
- 9026 Westglen DrNov 26, 2025Tunnel up to 10 feet under structure and repair one hot side water leak · 91 m away
- 9032 Westglen DrJun 4, 2026Wire swimming pool · 95 m away
- 9015 Westglen DrApr 28, 2026Water heater replacement · 100 m away
- 9025 Westglen DrJun 26, 2026Drain leak spot repair · 103 m away
- 9029 Westglen DrOct 26, 2026Reroute the kitchen and laundry, tunneling to repipe the 2 bathrooms, replacing the entire yard service line · 104 m away
- 2323 Springhill DrFeb 12, 2026Gas line relay · 106 m away
- 8912 Westglen DrJul 14, 2026Replace 70 ft of cast iron with pvc underneath a pier and beam home · 110 m away
- 9041 Westglen DrNov 6, 2026Full roof re-placement with certainteed climateflex impact resistant composition shingles, color moire black · 111 m away
- 2311 Springhill DrOct 2, 2026Whole house re pipe for with 4 drops water heater, stove, fireplace and furnace with a total of 80ft · 112 m away
- 2324 Springhill DrApr 14, 2026Install 6 concrete pressed piers and reshim interior concrete supports as required · 117 m away
- 2314 Springhill StDec 11, 2020Remove existing roof and install new roof · 122 m away
More demolitions in 75228, warehouses & industrial in 75228.