2324 Springhill Dr
Dallas, TX 75228
Sewer line and foundation repairs at Dallas home
City of Dallas permits indicate a sewer line replacement at 2324 Springhill Dr, filed October 13, 2025, and foundation repairs filed April 14, 2026. The foundation permit describes installing six concrete pressed piers and reshimming interior concrete supports as needed.
Summarized from City of Dallas records · updated Apr 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 14, 2026
- since Oct 13, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2324 Springhill Dr
What work is happening at 2324 Springhill Dr?
City of Dallas records show a sewer line replacement and residential foundation repair at the address. The permits were filed October 13, 2025, and April 14, 2026.
Is the home getting foundation repairs?
Yes. Permit RES-FDN-25-000576, filed April 14, 2026, describes installing six concrete pressed piers and reshimming interior concrete supports as needed.
Is the sewer line being replaced at 2324 Springhill Dr?
Yes. City of Dallas permit RES-PLM-25-005969 describes a sewer line replacement and was filed October 13, 2025.
When were permits filed for work at 2324 Springhill Dr?
The sewer line replacement permit was filed October 13, 2025. The foundation repair permit was filed April 14, 2026.
Is a new home being built at 2324 Springhill Dr?
The records provided describe sewer line and foundation repairs, not construction of a new home.
Also being built nearby
All of 75228- 2323 Springhill DrFeb 12, 2026Gas line relay · 13 m away
- 2314 Springhill StDec 11, 2020Remove existing roof and install new roof · 13 m away
- 2311 Springhill DrOct 2, 2026Whole house re pipe for with 4 drops water heater, stove, fireplace and furnace with a total of 80ft · 22 m away
- 2281 Springhill DrFeb 11, 2026Nsfaa-adding a metal carport for cars to be protected from weather 20x18 carport flat top roof with a small slope · 81 m away
- 2277 Springhill DrJun 20, 2025Updating existing electrical service · 89 m away
- 2284 Springhill DrSep 28, 202680ft whole home gas re pipe - 4 appliances (water heater/furnace/oven/stove) · 90 m away
- 8906 Stanwood DrJun 11, 2025Electrical service repair due to storm damages · 108 m away
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements · 117 m away
- 2261 Springhill DrJan 21, 2026Gas pressure test · 120 m away
- 2274 Springhill DrSep 28, 20261-in gas pipe leak repair in attic · 122 m away
- 8712 Tudor PlJan 14, 2026Gas testing · 132 m away
- 8813 Tudor PlNov 6, 2025Replace water heater, install new 50 gallon gas water heater in attic · 134 m away