2314 Springhill St
Dallas, TX 75228
2314 Springhill St: 1 project on record
City of Dallas lists 1 filing across 1 project at 2314 Springhill St, Dallas, TX 75228. The most recent, filed December 11, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Dec 11, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 11, 2020
- since Dec 11, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2314 Springhill St
What is being built at 2314 Springhill St?
The latest filing (City of Dallas permit 2012115004, December 11, 2020) covers remove existing roof and install new roof.
How many permits and filings does 2314 Springhill St have?
1 filing across 1 project, from December 11, 2020 to December 11, 2020.
Is there other construction near 2314 Springhill St?
Yes. Nearby filings include 2324 Springhill Dr (install 6 concrete pressed piers and reshim interior concrete supports as required, Apr 14, 2026); 2311 Springhill Dr (whole house re pipe for with 4 drops water heater, stove, fireplace and furnace with a total of 80ft, Oct 2, 2026); 2323 Springhill Dr (gas line relay, Feb 12, 2026).
How do I get alerts for new permits at 2314 Springhill St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75228- 2324 Springhill DrApr 14, 2026Install 6 concrete pressed piers and reshim interior concrete supports as required · 13 m away
- 2311 Springhill DrOct 2, 2026Whole house re pipe for with 4 drops water heater, stove, fireplace and furnace with a total of 80ft · 14 m away
- 2323 Springhill DrFeb 12, 2026Gas line relay · 16 m away
- 2281 Springhill DrFeb 11, 2026Nsfaa-adding a metal carport for cars to be protected from weather 20x18 carport flat top roof with a small slope · 68 m away
- 2277 Springhill DrJun 20, 2025Updating existing electrical service · 76 m away
- 2284 Springhill DrSep 28, 202680ft whole home gas re pipe - 4 appliances (water heater/furnace/oven/stove) · 76 m away
- 2261 Springhill DrJan 21, 2026Gas pressure test · 107 m away
- 2274 Springhill DrSep 28, 20261-in gas pipe leak repair in attic · 109 m away
- 8906 Stanwood DrJun 11, 2025Electrical service repair due to storm damages · 112 m away
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements · 122 m away
- 8712 Tudor PlJan 14, 2026Gas testing · 128 m away
- 8708 Tudor PlApr 2, 2026Gas test · 132 m away