A City of Dallas residential plumbing permit filed October 26, 2026, covers rerouting the kitchen and laundry, tunneling to repipe two bathrooms, and replacing the entire yard service line. The record does not describe a new building.
Summarized from City of Dallas records · updated Oct 26, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 26, 2026
- since Oct 26, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReroute the kitchen and laundry, tunneling to repipe the 2 bathrooms, replacing the entire yard service line
Reroute the kitchen and laundry, tunneling to repipe the 2 bathrooms, replacing the entire yard service line
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 9029 Westglen Dr
What work is planned at 9029 Westglen Dr?
A City of Dallas residential plumbing permit describes rerouting the kitchen and laundry, repiping two bathrooms by tunneling, and replacing the entire yard service line. The filing is dated October 26, 2026.
Is a new building being built at 9029 Westglen Dr?
The available record describes plumbing work at a residence, not construction of a new building. It does not provide square footage.
When was the plumbing permit filed for 9029 Westglen Dr?
The City of Dallas record is dated October 26, 2026. Its permit number is RES-PLM-26-011459.
What plumbing work is planned for the bathrooms?
The permit description says the work includes tunneling to repipe two bathrooms. It does not provide further details about the bathroom work.
Will the kitchen and laundry be rerouted at 9029 Westglen Dr?
Yes. The permit description includes rerouting the kitchen and laundry.
Does the permit include replacing a water or service line?
Yes. It describes replacing the entire yard service line, along with kitchen, laundry, and bathroom plumbing work.
Is a restaurant opening at 9029 Westglen Dr?
The available City of Dallas permit describes residential plumbing work, not a restaurant opening. It does not identify a business or tenant.
Also being built nearby
All of 75228- 9025 Westglen DrJun 26, 2026Drain leak spot repair · 6 m away
- 9026 Westglen DrNov 26, 2025Tunnel up to 10 feet under structure and repair one hot side water leak · 13 m away
- 9032 Westglen DrJun 4, 2026Wire swimming pool · 14 m away
- 9041 Westglen DrNov 6, 2026Full roof re-placement with certainteed climateflex impact resistant composition shingles, color moire black · 18 m away
- 9015 Westglen DrApr 28, 2026Water heater replacement · 21 m away
- 9028 Vinewood DrOct 15, 2026Replace yard gas line · 88 m away
- 9022 Vinewood DrSep 24, 2026Replace service damaged by fallen tree · 89 m away
- 9021 Vinewood DrAug 17, 2026Replace 50 gal gas water heater · 101 m away
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements · 104 m away
- 9105 Westglen DrJan 30, 2026Mcr with battery installing 27 roof mounted solar panels 11.610 kw dc system with 1 tesla powerwall 3 as integrated inverter and partial back up · 115 m away
- 8906 Stanwood DrJun 11, 2025Electrical service repair due to storm damages · 122 m away
- 9110 Westglen DrJul 31, 2026Tear off and install new asphalt shingles · 126 m away