3020 Pegasus Park Dr

Dallas, TX 75247 · Project Geode, Pegasus 2/3 - Spec Labs + 1 more

Laboratory and office renovations at 3020 Pegasus Park Drive

City of Dallas permits indicate a laboratory expansion and office and laboratory tenant fit-outs in an existing building at 3020 Pegasus Park Drive. The lab expansion alteration was permitted July 8, 2026, with electrical, mechanical and plumbing permits filed August 5; later fit-out permits were filed in October, followed by electrical work on November 13, 2026.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Nov 13, 2026

Projects
21
21 filings
Latest filing
Nov 13, 2026
since Nov 13, 2026
Largest scope
—
Estimated cost
$32M
state registration

Permit & project history

21 projects
  1. Installing, panels, atss, & generator. overhead conduit homeruns and branch circuiting, lighting, grounding, new feeders from the main electrical room, and feeders from the generator to the atss

    Installing, panels, atss, & generator. overhead conduit homeruns and branch circuiting, lighting, grounding, new feeders from the main electrical room, and feeders from the generator to the atss

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005658
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior remodel to create a corridor

    Interior remodel to create a corridor

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002702
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Tenant fit-out of 16,500 sq ft of an existing building with office and labaoratory enviroments

    Tenant fit-out of 16,500 sq ft of an existing building with office and labaoratory enviroments

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-004148
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Address: 3020 pegasus park drscope: tenant fit-out of 16,000 sq ft of an existing building with office and laboratory environments

    Address: 3020 pegasus park drscope: tenant fit-out of 16,000 sq ft of an existing building with office and laboratory environments

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-002160
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Plumbing

    Plumbing

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-003867
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Mcr address: 3020 pegasus parkway scope: renovation to existing tenant suite in an office building

    Mcr address: 3020 pegasus parkway scope: renovation to existing tenant suite in an office building

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001606
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Mcr address: 3020 pegasus park drive scope: renovation of existing space

    Mcr address: 3020 pegasus park drive scope: renovation of existing space

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001754
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Provide all labor, materials, equipment, supervision, testing, and coordination required for the electrical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied two-story building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 26 electrical and division 28 fire detection and alarm.scope includes tracing, identifying, disconnecting, and making safe existing electrical circuits, lighting, devices, equipment connections, fire alarm components, and associated wiring within the renovation area. remove, relocate, reroute, reconnect, or extend existing raceways, conductors, boxes, devices, and circuits as required for the new construction. maintain electrical service to occupied portions of the building and protect systems designated to remain.coordinate shutdowns, tie-ins, and energization with the owner and general contractor. provide temporary lighting, temporary power, gfci-protected construction receptacles, and temporary life-safety provisions as required.furnish and install new electrical distribution equipment shown on the permit drawings, including panelboards, transformers, circuit breakers, disconnect switches, surge protection devices, feeders, branch circuits, raceways, boxes, supports, grounding, and bonding. modify existing distribution equipment and install new breakers, feeders, and branch circuits as indicated by the one-line diagrams and panel schedules.provide led lighting, emergency lighting, exit signs, associated branch circuitry, and a complete lighting-control system including switches, dimmers, occupancy sensors, daylight controls, relays, power packs, networked controls, controlled receptacles, programming, calibration, and testing.provide general-purpose, dedicated, gfci, controlled, above-counter, ceiling-mounted, and equipment receptacles. provide power and final connections for laboratory equipment, casework, owner-furnished equipment, mechanical and plumbing equipment, air valves, terminal units, exhaust equipment, bas panels, and specialty equipment. install required disconnects, overcurrent protection, starters, control transformers, and 120-volt control-power circuits.provide electrical rough-in for telecommunications, data, audiovisual, wireless access points, security, and access control, including backboxes, conduit, sleeves, pull strings, pathways, cable tray, grounding, and supports. install telecommunications cabling and terminations where shown.modify and extend the existing fire alarm system, including initiating and notification devices, modules, raceways, wiring, programming, testing, certification, and coordination with the existing building system and authority having jurisdiction.provide equipment and circuit identification, panel directories, warning and arc-flash labels, supports, required restraints, sleeves, and listed firestopping at penetrations. complete testing, startup, commissioning support, inspections, corrections, record drawings, updated panel schedules, test reports, warranties, and closeout documentation.the completed installation shall provide fully operational electrical power, lighting, lighting controls, equipment power, telecommunications infrastructure, security rough-in, and fire alarm systems in compliance with the 2020 national electrical code and city of dallas amendments

    Provide all labor, materials, equipment, supervision, testing, and coordination required for the electrical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied two-story building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 26 electrical and division 28 fire detection and alarm.scope includes tracing, identifying, disconnecting, and making safe existing electrical circuits, lighting, devices, equipment connections, fire alarm components, and associated wiring within the renovation area. remove, relocate, reroute, reconnect, or extend existing raceways, conductors, boxes, devices, and circuits as required for the new construction. maintain electrical service to occupied portions of the building and protect systems designated to remain.coordinate shutdowns, tie-ins, and energization with the owner and general contractor. provide temporary lighting, temporary power, gfci-protected construction receptacles, and temporary life-safety provisions as required.furnish and install new electrical distribution equipment shown on the permit drawings, including panelboards, transformers, circuit breakers, disconnect switches, surge protection devices, feeders, branch circuits, raceways, boxes, supports, grounding, and bonding. modify existing distribution equipment and install new breakers, feeders, and branch circuits as indicated by the one-line diagrams and panel schedules.provide led lighting, emergency lighting, exit signs, associated branch circuitry, and a complete lighting-control system including switches, dimmers, occupancy sensors, daylight controls, relays, power packs, networked controls, controlled receptacles, programming, calibration, and testing.provide general-purpose, dedicated, gfci, controlled, above-counter, ceiling-mounted, and equipment receptacles. provide power and final connections for laboratory equipment, casework, owner-furnished equipment, mechanical and plumbing equipment, air valves, terminal units, exhaust equipment, bas panels, and specialty equipment. install required disconnects, overcurrent protection, starters, control transformers, and 120-volt control-power circuits.provide electrical rough-in for telecommunications, data, audiovisual, wireless access points, security, and access control, including backboxes, conduit, sleeves, pull strings, pathways, cable tray, grounding, and supports. install telecommunications cabling and terminations where shown.modify and extend the existing fire alarm system, including initiating and notification devices, modules, raceways, wiring, programming, testing, certification, and coordination with the existing building system and authority having jurisdiction.provide equipment and circuit identification, panel directories, warning and arc-flash labels, supports, required restraints, sleeves, and listed firestopping at penetrations. complete testing, startup, commissioning support, inspections, corrections, record drawings, updated panel schedules, test reports, warranties, and closeout documentation.the completed installation shall provide fully operational electrical power, lighting, lighting controls, equipment power, telecommunications infrastructure, security rough-in, and fire alarm systems in compliance with the 2020 national electrical code and city of dallas amendments

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003620
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Provide all labor, materials, equipment, supervision, testing, balancing, startup, and coordination required for the mechanical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 23 hvac and division 25 building automation requirements.scope includes identifying, isolating, disconnecting, and making safe existing ductwork, air devices, hydronic piping, controls, and associated hvac systems within the renovation area. selectively remove, relocate, reroute, reconnect, or extend existing systems as required while protecting systems designated to remain and maintaining hvac service to occupied portions of the facility.coordinate shutdowns, system isolations, drain-downs, tie-ins, and restoration with the owner and general contractor. cap and seal open ductwork and piping, protect existing systems from construction dust and debris, and provide temporary filtration where required.furnish and install new and relocated supply, return, and exhaust ductwork, fittings, transitions, dampers, flexible connections, access doors, insulation, sealants, supports, hangers, and related accessories. provide diffusers, registers, grilles, exhaust components, and air-distribution devices shown on the permit drawings.provide supply air valves, exhaust air valves, and single-duct terminal units, including hydronic reheat coils, control valves, actuators, supports, access provisions, and connections. install air valves with the required straight duct lengths and maintain service and maintenance clearances.provide new and modified hydronic heating-water piping serving reheat coils and terminal equipment, including fittings, valves, balancing valves, automatic flow-control valves, strainers, vents, drains, unions, specialties, anchors, guides, expansion provisions, supports, insulation, identification, and connections to existing building systems. pressure test, flush, clean, vent, refill, and place piping systems into operation.provide a complete building automation system interface for new mechanical equipment, including controllers, sensors, actuators, control valves, control wiring, network connections, programming, graphics, alarms, point-to-point verification, and integration with the existing bas. program systems to operate in accordance with the specified sequences of operation.provide all sleeves, openings, supports, vibration isolation, equipment identification, duct and piping labels, access panels, and listed firestopping required for penetrations through rated assemblies. coordinate mechanical work with architectural, structural, electrical, plumbing, fire protection, laboratory equipment, and ceiling systems.perform duct leakage testing, hydronic pressure testing, equipment startup, controls verification, functional performance testing, and complete testing, adjusting, and balancing of air and water systems. adjust systems to maintain required airflow, room pressure relationships, temperature control, and laboratory operating conditions. correct deficiencies and retest as required.provide certified tab reports, startup documentation, test reports, record drawings, operation and maintenance manuals, warranties, owner training, commissioning support, and closeout documentation.the completed installation shall provide fully operational supply, return, exhaust, hydronic heating, air-terminal, laboratory pressure-control, and building automation systems serving the laboratory expansion

    Provide all labor, materials, equipment, supervision, testing, balancing, startup, and coordination required for the mechanical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 23 hvac and division 25 building automation requirements.scope includes identifying, isolating, disconnecting, and making safe existing ductwork, air devices, hydronic piping, controls, and associated hvac systems within the renovation area. selectively remove, relocate, reroute, reconnect, or extend existing systems as required while protecting systems designated to remain and maintaining hvac service to occupied portions of the facility.coordinate shutdowns, system isolations, drain-downs, tie-ins, and restoration with the owner and general contractor. cap and seal open ductwork and piping, protect existing systems from construction dust and debris, and provide temporary filtration where required.furnish and install new and relocated supply, return, and exhaust ductwork, fittings, transitions, dampers, flexible connections, access doors, insulation, sealants, supports, hangers, and related accessories. provide diffusers, registers, grilles, exhaust components, and air-distribution devices shown on the permit drawings.provide supply air valves, exhaust air valves, and single-duct terminal units, including hydronic reheat coils, control valves, actuators, supports, access provisions, and connections. install air valves with the required straight duct lengths and maintain service and maintenance clearances.provide new and modified hydronic heating-water piping serving reheat coils and terminal equipment, including fittings, valves, balancing valves, automatic flow-control valves, strainers, vents, drains, unions, specialties, anchors, guides, expansion provisions, supports, insulation, identification, and connections to existing building systems. pressure test, flush, clean, vent, refill, and place piping systems into operation.provide a complete building automation system interface for new mechanical equipment, including controllers, sensors, actuators, control valves, control wiring, network connections, programming, graphics, alarms, point-to-point verification, and integration with the existing bas. program systems to operate in accordance with the specified sequences of operation.provide all sleeves, openings, supports, vibration isolation, equipment identification, duct and piping labels, access panels, and listed firestopping required for penetrations through rated assemblies. coordinate mechanical work with architectural, structural, electrical, plumbing, fire protection, laboratory equipment, and ceiling systems.perform duct leakage testing, hydronic pressure testing, equipment startup, controls verification, functional performance testing, and complete testing, adjusting, and balancing of air and water systems. adjust systems to maintain required airflow, room pressure relationships, temperature control, and laboratory operating conditions. correct deficiencies and retest as required.provide certified tab reports, startup documentation, test reports, record drawings, operation and maintenance manuals, warranties, owner training, commissioning support, and closeout documentation.the completed installation shall provide fully operational supply, return, exhaust, hydronic heating, air-terminal, laboratory pressure-control, and building automation systems serving the laboratory expansion

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-26-001933
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Provide all labor, materials, equipment, supervision, testing, balancing, startup, and coordination required for the mechanical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 23 hvac and division 25 building automation requirements.scope includes identifying, isolating, disconnecting, and making safe existing ductwork, air devices, hydronic piping, controls, and associated hvac systems within the renovation area. selectively remove, relocate, reroute, reconnect, or extend existing systems as required while protecting systems designated to remain and maintaining hvac service to occupied portions of the facility.coordinate shutdowns, system isolations, drain-downs, tie-ins, and restoration with the owner and general contractor. cap and seal open ductwork and piping, protect existing systems from construction dust and debris, and provide temporary filtration where required.furnish and install new and relocated supply, return, and exhaust ductwork, fittings, transitions, dampers, flexible connections, access doors, insulation, sealants, supports, hangers, and related accessories. provide diffusers, registers, grilles, exhaust components, and air-distribution devices shown on the permit drawings.provide supply air valves, exhaust air valves, and single-duct terminal units, including hydronic reheat coils, control valves, actuators, supports, access provisions, and connections. install air valves with the required straight duct lengths and maintain service and maintenance clearances.provide new and modified hydronic heating-water piping serving reheat coils and terminal equipment, including fittings, valves, balancing valves, automatic flow-control valves, strainers, vents, drains, unions, specialties, anchors, guides, expansion provisions, supports, insulation, identification, and connections to existing building systems. pressure test, flush, clean, vent, refill, and place piping systems into operation.provide a complete building automation system interface for new mechanical equipment, including controllers, sensors, actuators, control valves, control wiring, network connections, programming, graphics, alarms, point-to-point verification, and integration with the existing bas. program systems to operate in accordance with the specified sequences of operation.provide all sleeves, openings, supports, vibration isolation, equipment identification, duct and piping labels, access panels, and listed firestopping required for penetrations through rated assemblies. coordinate mechanical work with architectural, structural, electrical, plumbing, fire protection, laboratory equipment, and ceiling systems.perform duct leakage testing, hydronic pressure testing, equipment startup, controls verification, functional performance testing, and complete testing, adjusting, and balancing of air and water systems. adjust systems to maintain required airflow, room pressure relationships, temperature control, and laboratory operating conditions. correct deficiencies and retest as required.provide certified tab reports, startup documentation, test reports, record drawings, operation and maintenance manuals, warranties, owner training, commissioning support, and closeout documentation.the completed installation shall provide fully operational supply, return, exhaust, hydronic heating, air-terminal, laboratory pressure-control, and building automation systems serving the laboratory expansion

    Provide all labor, materials, equipment, supervision, testing, balancing, startup, and coordination required for the mechanical renovation of approximately 5,640 square feet of existing tenant space into new laboratory, office, and support areas within an occupied building. work shall comply with the issue for bid and permit documents dated june 16, 2026, including division 23 hvac and division 25 building automation requirements.scope includes identifying, isolating, disconnecting, and making safe existing ductwork, air devices, hydronic piping, controls, and associated hvac systems within the renovation area. selectively remove, relocate, reroute, reconnect, or extend existing systems as required while protecting systems designated to remain and maintaining hvac service to occupied portions of the facility.coordinate shutdowns, system isolations, drain-downs, tie-ins, and restoration with the owner and general contractor. cap and seal open ductwork and piping, protect existing systems from construction dust and debris, and provide temporary filtration where required.furnish and install new and relocated supply, return, and exhaust ductwork, fittings, transitions, dampers, flexible connections, access doors, insulation, sealants, supports, hangers, and related accessories. provide diffusers, registers, grilles, exhaust components, and air-distribution devices shown on the permit drawings.provide supply air valves, exhaust air valves, and single-duct terminal units, including hydronic reheat coils, control valves, actuators, supports, access provisions, and connections. install air valves with the required straight duct lengths and maintain service and maintenance clearances.provide new and modified hydronic heating-water piping serving reheat coils and terminal equipment, including fittings, valves, balancing valves, automatic flow-control valves, strainers, vents, drains, unions, specialties, anchors, guides, expansion provisions, supports, insulation, identification, and connections to existing building systems. pressure test, flush, clean, vent, refill, and place piping systems into operation.provide a complete building automation system interface for new mechanical equipment, including controllers, sensors, actuators, control valves, control wiring, network connections, programming, graphics, alarms, point-to-point verification, and integration with the existing bas. program systems to operate in accordance with the specified sequences of operation.provide all sleeves, openings, supports, vibration isolation, equipment identification, duct and piping labels, access panels, and listed firestopping required for penetrations through rated assemblies. coordinate mechanical work with architectural, structural, electrical, plumbing, fire protection, laboratory equipment, and ceiling systems.perform duct leakage testing, hydronic pressure testing, equipment startup, controls verification, functional performance testing, and complete testing, adjusting, and balancing of air and water systems. adjust systems to maintain required airflow, room pressure relationships, temperature control, and laboratory operating conditions. correct deficiencies and retest as required.provide certified tab reports, startup documentation, test reports, record drawings, operation and maintenance manuals, warranties, owner training, commissioning support, and closeout documentation.the completed installation shall provide fully operational supply, return, exhaust, hydronic heating, air-terminal, laboratory pressure-control, and building automation systems serving the laboratory expansion

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-002919
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Alteration of existing space for lab expansion

    Alteration of existing space for lab expansion

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001504
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. This project consists of a lighting fixture replacement within an approximately 1,300 square foot area of the building. existing light fixtures will be removed and replaced with new decorative light fixtures to enhance the aesthetics of the space per the owner’s request.all new lighting fixtures will be installed using existing branch circuitry, switching, and controls. no modifications to existing electrical distribution, circuitry, or control systems are included in this scope

    This project consists of a lighting fixture replacement within an approximately 1,300 square foot area of the building. existing light fixtures will be removed and replaced with new decorative light fixtures to enhance the aesthetics of the space per the owner’s request.all new lighting fixtures will be installed using existing branch circuitry, switching, and controls. no modifications to existing electrical distribution, circuitry, or control systems are included in this scope

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-000631
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Remodel conference room/remodel lobby

    Remodel conference room/remodel lobby

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002472
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Adding one roof mounted exhaust fan

    Adding one roof mounted exhaust fan

    City of Dallas permitCommercial Mechanical Permit
    Record
    COM-MEC-25-000865
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Remodel conference room, remodel lobby

    Remodel conference room, remodel lobby

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-001740
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. (6) - la drops(5) - o2 drops(4) - co2 drops

    (6) - la drops(5) - o2 drops(4) - co2 drops

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-000880
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Qteam meeting site work, paving and electrical for a new parking lot

    Qteam meeting site work, paving and electrical for a new parking lot

    City of Dallas permitCommercial New Construction Permit
    Record
    COM-NEW-25-000069
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Q team in house- finish out of medical or scientific laboratory

    Q team in house- finish out of medical or scientific laboratory

    City of Dallas permitCommercial Plumbing Permit$1.4M
    Record
    2503181018_198954793-002_PL_1
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Project Geode

    Approximately 3,500 sq ft of interior tenant improvement spaces of existing 2-story office building. tenant program includes new animal facilities. — pegasus park

    TDLR project registrationRenovation/AlterationProject Closed3,500 sq ft$4.0M est.
    Tenant / owner
    Project Geode
    Design firm
    Pro
    Contact
    Pro
  20. PEGASUS 2/3 - SPEC LABS

    New build out of laboratory research suites a1, b1, b2, and b3 in shell space of existing pegasus park building 2. the space consists of open and enclosed offices, open lab & support spaces totaling 19,217 sq ft — pegasus park

    TDLR project registrationRenovation/AlterationProject Closed19,217 sq ft$4.1M est.
    Tenant / owner
    Pegasus 2/3 - Spec Labs
    Design firm
    Pro
    Contact
    Pro
  21. Building 2 will be renovated. existing building 3 will be demolished and a new addition to building 2 will be provided in place. — building 2/3

    TDLR project registrationRenovation/AlterationProject Closed135,000 sq ft$32M est.
    Tenant / owner
    Pegasus Park Bridge Labs - Building 2/3
    Design firm
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 3020 Pegasus Park Dr

What is being built at 3020 Pegasus Park Drive?

City permit records describe a laboratory expansion and tenant fit-outs with laboratory and office space inside an existing building. They do not identify a business or tenant.

When was the laboratory expansion at 3020 Pegasus Park Drive permitted?

The City of Dallas issued an alteration permit for the lab expansion on July 8, 2026 (COM-ALT-ADD-26-001504). Electrical, mechanical and plumbing permits for work in about 5,640 square feet were filed August 5, 2026.

How large is the office and laboratory fit-out at 3020 Pegasus Park Drive?

An October 27, 2026 alteration permit describes a 16,000-square-foot office and laboratory tenant fit-out (COM-ALT-ADD-26-002160). A plumbing permit filed the next day describes a 16,500-square-foot fit-out (COM-PLM-26-004148).

What work is included in the lab renovation at 3020 Pegasus Park Drive?

Permits describe new and modified electrical, lighting, HVAC, plumbing and building-control systems for laboratory, office and support areas. The mechanical scope includes systems for laboratory pressure control.

What is the latest permit activity at 3020 Pegasus Park Drive?

A City of Dallas electrical permit filed November 13, 2026, describes installation of panels, an automatic transfer switch, a generator, lighting, conduit and electrical feeders (COM-ELC-26-005658).

Is 3020 Pegasus Park Drive a new building?

The permits describe renovations and tenant fit-outs in an existing building, including a two-story building in the August 5 electrical scope. The records provided do not indicate construction of a new building.