New demolitions in Dallas 75203
40 addresses in 75203 have permits or project filings for demolitions in the last two years. The most recent was filed at 819 Bonnie View Rd.
Latest filings
- 819 Bonnie View RdNov 12, 2026Demolition one story single family and detached garage-clear lot
- 608 Cumberland StOct 28, 2026Licensed professional will use the foundation structural engineering plans provided to complete and repair the addition to my home
- 423 Avenue LOct 23, 20268 ft wood fence
- 1119 Morrell AveOct 22, 2026New sewer water gas 2 showes 2 toilets 2 lava kitchen washer
- 2621 Southerland Ave · Dhfc The Legacy On Kiest Landowner, LLCOct 15, 2026Instal new ac system and duct work to 1 st floor
- 518 Avenue JOct 8, 2026Plumbing associated with permit #res-new-26-000700
- 650 S R L Thornton Fwy · City Of DallasOct 8, 2026Electrical service and branch wiring for zip line
- 410 Du Bois AveOct 6, 2026New wiring for new constuction home
- 1030 Dodd StSep 23, 2026Will demolition house and cement as well as complete a soft grade on the land
- 428 E Jefferson BlvdSep 16, 2026Add floor drain to bathroom for compliance
- 833 Havendon CirAug 28, 2026Complete demolition of burn down house, blade clean, nothing to remain
- 1018 N Beckley AveAug 25, 2026200 amp service wire all house
- 118 E 12th StAug 11, 2026Interior demolition full prep for remodel
- 326 Avenue FAug 10, 2026Install of wooden 8 foot fence
- 3049 Morrell AveJul 24, 2026Demolish structure & remove debrisno protected trees will be removed or disturbed
- 732 Fernwood AveJul 1, 2026Install 5 ton (gas) a/c system complete
- 303 Bonnie View RdJun 29, 2026Demolition bladed clean
- 1003 Rockwood StJun 15, 2026Demolition
- 223 S Ewing AveJun 3, 2026- demolition and removal of the building and foundations- removal of concrete flatwork- clear lot
- 922 Claude StJun 2, 2026Install 4 ton (gas) a/c system complete with ductwork
- 1400 Hutchins AveMay 21, 2026Hvac rough & trim on new construction
- 345 Bonnie View RdMay 8, 2026New installation of hvac system
- 1942 Cedar Crest BlvdMay 3, 2026Nsfaa 1. take down old drywall2 demolition out old cabinets3 replace windows4 add additional lights and plugs5 install new drywall6 install new cabinets7 cabinet design is staying the same
- 1307 Diceman AveApr 29, 20262 units 3 ton electric sytemsrun new ductwork
- 511 Avenue JApr 4, 2026Install 4 ton unit in attic gas with 2 returns and 12 surplay
- 818 Lambert StMar 23, 2026New hvac
- 2210 Areba StMar 3, 2026Mcr with battery roof mounted solar pv system with battery back up
- 1411 Church StFeb 19, 2026We are going to demolish the entire house, and haul off all debris. trees are not being touched, just the building
- 621 E Clarendon DrFeb 9, 2026Demolition power for old commissary building and relocate it to near a fence. need to refeed power to three gates and a couple ticket booths. oncor shows the associated service to be:account reflected per meter badge number: 517 e clarendon dr, dallas, tx, 75203-2918, small non-residential (esi - location 0004279868)
- 506 High StJan 7, 2026Demolition sfdblade cleanclear debrisno tree removal
- 719 E 11th StDec 18, 2025The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system
- 102 N Cliff St · 102 N. CliffDec 14, 2025Mcr 102 n. cliff is an existing historic building located in the tenth street neighborhood. it is a contributing structure within the national register of historic places designation for the tenth street historic district. the building is a two-story, masonry-constructed commercial structure.the proposed scope of work includes a full historic rehabilitation to restore the building to its original use. the project will incorporate accessibility upgrades to meet tas standards, improvements to walls and floors to achieve required fire ratings, and the demolition of a non-historic rear addition. additional work includes repairing and replacing doors and windows, installing new mechanical, electrical, and plumbing systems, adding a driveway using the existing curb cut, landscape enhancements, installation of new roof decking and tpo roofing, and removal and replacement of the exterior balcony to meet current structural code requirements
- 1111 Comal StDec 3, 2025Demolition
- 814 Lambert StNov 30, 2025New hvac
- 718 N Marsalis AveNov 5, 2025Mcr interior demolition will include the removal and disposal of fire-damaged materials such as sheetrock, wood framing, and insulation. all affected areas will be carefully dismantled using hand tools (hammers, pry bars, utility knives, and scrapers) to avoid disturbing structural components. debris will be bagged and removed from the site in compliance with safety and waste-disposal regulations
- 1225 Boswell StOct 28, 2025Residential demolition permit
- 412 Avenue LOct 16, 2025Hvac install
- 608 N Denley DrOct 15, 2025Will demolition house and cement as well as complete a soft grade on the land
- 1102 Church StAug 28, 2025Install new plumbing
- 527 Woodbine AveJul 10, 2025Residential demolition permit
- 921 Dale StJun 11, 2025House demolition
- 650 S. R. L. Thornton Freeway, Dallas, TX 75203 · Dallas Zoo Herpetarium BuildingOct 25, 2024Dallas zoo- herpetarium reroof — renovation/alteration — project scope contains the demolition & replacement of the buildings existing skylight roof structure & enclosure. partial replacement of the existing hvac systems
- 2115 Berwick AveJan 28, 2021Demolition sfd
- 311 N Denver StJan 14, 2021Demolition sfd
- 341 N Patton AveSep 28, 2020Demolition sfd
Questions
What demolitions are being built in Dallas 75203?
40 addresses in 75203 have permits or project filings for demolitions in the last two years. The most recent was filed at 819 Bonnie View Rd. Others include 608 Cumberland St, 423 Avenue L, 1119 Morrell Ave.
How can I find out when a new demolition is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new demolition permit is filed.