719 E 11th St

Dallas, TX 75203

Rooftop solar permitted at 719 E 11th St

A rooftop solar photovoltaic system is proposed at 719 E 11th St under a City of Dallas permit filed December 18, 2025. The permit describes a larger project across two adjacent parcels with a 574.78-kWp/485-kW carport and rooftop solar system and a 1,044-kWh battery energy storage system; this permit covers the rooftop solar work.

Summarized from City of Dallas records · updated Dec 18, 2025

Projects
2
2 filings
Latest filing
Dec 18, 2025
since Dec 11, 2020
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system

    The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001656
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Demolition sfd

    Demolition sfd

    City of Dallas permitDemolition Permit Commercial
    Record
    2012071110
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 719 E 11th St

What is being built at 719 E 11th St?

A City of Dallas permit describes a rooftop solar photovoltaic system at the address. It was filed December 18, 2025, under permit COM-ALT-ADD-25-001656.

Is a battery energy storage system part of the project at 719 E 11th St?

The permit describes a broader project across two adjacent parcels that includes a 1,044-kWh battery energy storage system. This specific permit covers the rooftop solar system.

How large is the solar project near 719 E 11th St?

The broader project is described as a 574.78-kWp/485-kW carport and rooftop solar system across two adjacent parcels. The permit for 719 E 11th St specifically covers rooftop solar.

When was the solar permit filed for 719 E 11th St?

The City of Dallas filed permit COM-ALT-ADD-25-001656 on December 18, 2025.

What's being proposed near Safari Trails Phase 1 African Shorelines?

A rooftop solar photovoltaic system is proposed at 719 E 11th St, about 247 meters from Safari Trails Phase 1 African Shorelines. The permit was filed December 18, 2025.

Also being built nearby

All of 75203

More demolitions in 75203, warehouses & industrial in 75203, solar installs in 75203.