549 E Jefferson Blvd
Dallas, TX 75203 · 549 E Jefferson Blvd LLC
Former church building to become 40-unit multifamily project
A Dallas permit filed Aug. 26, 2026, describes converting the current church building at 549 E Jefferson Blvd into multifamily housing with 40 dwelling units. The work also includes an elevator, and the former sanctuary is described as vacant floor space for future tenant occupancy. A May 8 TDLR registration lists interior renovation, foundation repair and an elevator tower addition, with an applicant-estimated project cost of $13.5 million.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 26, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 26, 2026
- since May 8, 2026
- Largest scope
- 46,236 sf
- Estimated cost
- $14M
- state registration
Where this project stands
In state plan reviewThe Jefferson
46,236 sq ft · $14M est.
- RegisteredMay 8, 2026
- Plan reviewnow
- ConstructionMay '26 – May '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsQteam meeting 9.10.26 (all day)- interior remodel converting current church building into multifamily consisting of 40 dwelling units. converting current church sanctuary into vacant floor space for future tenant occupancy. adding elevator
Qteam meeting 9.10.26 (all day)- interior remodel converting current church building into multifamily consisting of 40 dwelling units. converting current church sanctuary into vacant floor space for future tenant occupancy. adding elevator
City of Dallas permitCommercial Alteration Addition PermitInterior renovation and foundation repair. elevator tower addition. — oak cliff united methodist church
TDLR project registrationRenovation/AlterationProject Registered46,236 sq ft$14M est.- Project #
- TABS2026019795
- Tenant / owner
- The Jefferson
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 549 E Jefferson Blvd
What is being built at 549 E Jefferson Blvd in Dallas?
A Dallas permit describes converting the current church building into a multifamily project with 40 dwelling units. It also lists an elevator addition.
Is the church at 549 E Jefferson Blvd being converted into apartments?
A Dallas permit filed Aug. 26, 2026, describes converting the building into multifamily housing with 40 dwelling units.
What is planned for the sanctuary at 549 E Jefferson Blvd?
The permit describes converting the current church sanctuary into vacant floor space for future tenant occupancy. It does not identify a future tenant.
When was work at 549 E Jefferson Blvd permitted?
The TDLR project registration was filed May 8, 2026. A Dallas commercial alteration permit, COM-ALT-ADD-26-002071, was filed Aug. 26, 2026.
What renovations are planned at 549 E Jefferson Blvd?
The TDLR registration lists interior renovation, foundation repair and an elevator tower addition. The Aug. 26 Dallas permit describes the 40-unit conversion and an elevator.
How much will the 549 E Jefferson Blvd project cost?
The TDLR registration lists an applicant-estimated cost of $13.5 million for the project. This is an estimate, not a confirmed final cost.
What is being built near I-35 & 8th in Dallas?
At 549 E Jefferson Blvd, about 441 meters from I-35 & 8th, a permit describes converting a church building into multifamily housing with 40 dwelling units.
Also being built nearby
All of 75203- 225 S. Marsalis Ave · Felix Botello Elementary SchoolSep 18, 2024Dallas isd _ felix botello elementary school — renovation/alteration — provide mainenance to the existing building • sealant replacement at all panel joints * provide new aluminun capped flashing and elastomeric paint at designated locations were water infiltration has been identified • replacement of fire alarm system · 98 m away
- 110 S Marsalis AveAug 20, 2025Gas test · 170 m away
- 127 N Denver StOct 14, 2020Install roof mounted solar pv system · 181 m away
- 211 S Lancaster AveJun 26, 2023Q-team review, commercial multi-family remodel. remodel of an existing two-story, 38-unit apartment building, of approximately 24,990 sq ft total · 191 m away
- 410 E 10th StJun 2, 2025Ran pool line · 192 m away
- 117 S Patton AveSep 24, 2020Permanent electrical service · 198 m away
- 300 S Marsalis AveApr 14, 2026New storm & overflow drain piping · 230 m away
- 103 La Estrella PlzOct 15, 2026Install 22 piers · 247 m away
- 113 La Estrella PlzNov 4, 2020Adding approach on side of house 10x22x5radius · 250 m away
- 719 E 11th StDec 18, 2025The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system · 252 m away
- 428 E Jefferson BlvdSep 16, 2026Add floor drain to bathroom for compliance · 254 m away
- 412 E 9th StAug 11, 2026New construction plumbing · 299 m away
More apartments & multifamily in 75203, churches & places of worship in 75203.