225 S. Marsalis Ave
Dallas, TX 75203 · Felix Botello Elementary School
Felix Botello Elementary School renovation in Dallas
A renovation at Felix Botello Elementary School was registered with the Texas Department of Licensing and Regulation on September 18, 2024. The work includes replacing sealant at panel joints, adding flashing and elastomeric paint where water infiltration was identified, and replacing the fire alarm system. The applicant's estimated project cost is $644,000; the record is marked Project Closed.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2024
- since Sep 18, 2024
- Largest scope
- 1 sf
- Estimated cost
- $644K
- state registration
Where this project stands
CompletedDallas ISD _ Felix Botello Elementary School
1 sq ft · $644K est.
- RegisteredSep 18, 2024
- Plan review
- ConstructionDec '22 – Sep '24
- Inspected
- Closed
Ran as a 22-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectProvide mainenance to the existing building • sealant replacement at all panel joints * provide new aluminun capped flashing and elastomeric paint at designated locations were water infiltration has been identified • replacement of fire alarm system — felix botello elementary school
TDLR project registrationRenovation/AlterationProject Closed1 sq ft$644K est.- Project #
- TABS2025001290
- Tenant / owner
- Dallas ISD _ Felix Botello Elementary School
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 225 S. Marsalis Ave
What is being built at 225 S. Marsalis Ave?
The TDLR registration describes maintenance and renovation work at Felix Botello Elementary School, not a new building. The listed work includes exterior water-infiltration repairs and fire alarm system replacement.
When was the Felix Botello Elementary School project registered?
The project was registered on September 18, 2024, under TDLR record TABS2025001290.
What repairs are planned at Felix Botello Elementary School?
The registration lists sealant replacement at panel joints, new aluminum-capped flashing, and elastomeric paint at locations where water infiltration was identified. It also lists replacement of the fire alarm system.
How much is the Felix Botello Elementary School renovation estimated to cost?
The applicant's estimated cost in the TDLR registration is $644,000. This is an estimate for the project.
Is a new school being built near the Dallas Zoo?
The record is for renovation and maintenance at the existing Felix Botello Elementary School at 225 S. Marsalis Ave, about 360 meters from the Dallas Zoo. It does not describe new school construction.
Is the Felix Botello Elementary School project complete?
The TDLR record is marked Project Closed. It was registered on September 18, 2024, as TABS2025001290.
Also being built nearby
All of 75203- 549 E Jefferson Blvd · 549 E Jefferson Blvd LLCAug 26, 2026Qteam meeting 9.10.26 (all day)- interior remodel converting current church building into multifamily consisting of 40 dwelling units. converting current church sanctuary into vacant floor space for future tenant occupancy. adding elevator · 98 m away
- 211 S Lancaster AveJun 26, 2023Q-team review, commercial multi-family remodel. remodel of an existing two-story, 38-unit apartment building, of approximately 24,990 sq ft total · 109 m away
- 300 S Marsalis AveApr 14, 2026New storm & overflow drain piping · 153 m away
- 719 E 11th StDec 18, 2025The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system · 183 m away
- 110 S Marsalis AveAug 20, 2025Gas test · 204 m away
- 223 S Ewing AveJun 3, 2026- demolition and removal of the building and foundations- removal of concrete flatwork- clear lot · 274 m away
- 127 N Denver StOct 14, 2020Install roof mounted solar pv system · 276 m away
- 117 S Patton AveSep 24, 2020Permanent electrical service · 284 m away
- 410 E 10th StJun 2, 2025Ran pool line · 284 m away
- 702 E Jefferson BlvdJan 7, 2026The proposed project will have 574.78kwp/485kw carport + rooftop solar pv system along with a battery energy storage system of 1044kwh. the project will be utilizing two adjacent parcels owned by the same owner, for which two different permits will be applied. this permit is specifically for the rooftop solar pv system · 299 m away
- 428 E Jefferson BlvdSep 16, 2026Add floor drain to bathroom for compliance · 300 m away
- 103 La Estrella PlzOct 15, 2026Install 22 piers · 330 m away