Permits at 2611 Healey Dr indicate construction work for a Dallas ISD school, including new-construction mechanical work, a gym storm shelter and a cafetorium. Electrical work for Edwin J. Kiest Elementary was permitted on Oct. 21, 2025, and a demolition permit filed Oct. 5, 2026, calls for complete removal of the vacated elementary school building.
Summarized from City of Dallas records · updated Oct 5, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Oct 5, 2026
- since Jul 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
13 projectsDsst-disd ej keist middle school demolition scope of work includes a complete demolition of the vacated edwin j. kiest elementary school. demolition includes removal of all utilities onsite (above and below grade). demolition includes selective removal of certain trees, perimeter fencing, playground equipment, parking lots, approaches and sidewalks. demolition is also inclusive of complete removal of the existing elementary school building down to 10' below existing grade
Dsst-disd ej keist middle school demolition scope of work includes a complete demolition of the vacated edwin j. kiest elementary school. demolition includes removal of all utilities onsite (above and below grade). demolition includes selective removal of certain trees, perimeter fencing, playground equipment, parking lots, approaches and sidewalks. demolition is also inclusive of complete removal of the existing elementary school building down to 10' below existing grade
City of Dallas permitCommercial Demolition PermitInstallation of electrical for new construction school edwin j kiest elementary. gc sedalcohas master permit #2409321127
Installation of electrical for new construction school edwin j kiest elementary. gc sedalcohas master permit #2409321127
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 2611 Healey Dr
What is being built at 2611 Healey Dr in Dallas?
City permits indicate school construction work, including new-construction HVAC, a gym storm shelter and a cafetorium. The records also include a demolition permit for the vacated Edwin J. Kiest Elementary School.
Is Edwin J. Kiest Elementary being demolished?
A City of Dallas demolition permit filed Oct. 5, 2026, calls for complete removal of the vacated school building. The scope also includes removing onsite utilities and certain site features.
When were permits filed for work at 2611 Healey Dr?
The records span July 21, 2025, through Oct. 5, 2026. They include an electrical permit for the school dated Oct. 21, 2025, and the demolition permit filed Oct. 5, 2026.
What does the demolition permit cover at 2611 Healey Dr?
Permit COM-DEM-26-000130, filed Oct. 5, 2026, describes complete demolition of the vacated Edwin J. Kiest Elementary School building to 10 feet below existing grade. It also lists removal of utilities, selected trees, fencing, playground equipment, parking lots, approaches and sidewalks.
Are there permits for a gym or storm shelter at the site?
Yes. A commercial mechanical permit filed Feb. 6, 2026, describes HVAC for a gym storm shelter. The same date, permits were filed for other school mechanical work, including the cafetorium and new construction.
What school work was permitted at 2611 Healey Dr in 2025?
A City of Dallas electrical permit filed Oct. 21, 2025, describes electrical work for Edwin J. Kiest Elementary School. Plumbing permits were filed Nov. 3 and Dec. 9, 2025.
Also being built nearby
All of 75228- 2648 Healey DrApr 6, 2026Roof replacement shingles only · 109 m away
- 2610 Larry DrJun 1, 2025Gas test · 114 m away
- 2658 Healey DrMar 23, 2026Nsfaa-adding a storage in the back of the house · 137 m away
- 2646 Larry DrMay 28, 2025Change ducts · 147 m away
- 2520 Healey DrJan 29, 2026Installation of 1 tesla power wall battery · 164 m away
- 2542 Larry DrAug 26, 2025Tunnel repair to repair broken cast iron sewer line · 180 m away
- 2508 Hillglenn RdAug 28, 2026Perform gas test, meter was off no issues or repairs needed · 184 m away
- 2607 Millmar DrSep 29, 2020Foundation repair · 196 m away
- 2615 Province LnOct 19, 2026Gas test · 199 m away
- 2623 Province LnMay 20, 2025Foundation repair-install 16 pilings · 201 m away
- 2526 Millmar DrMay 11, 2026Single hvac system change out · 207 m away
- 2647 Province LnMay 12, 2026Gas test · 218 m away