1445 Ross Avenue 55th
Dallas, TX 75202 · 1445 Ross Ave, LLC
Integrity Level 55 office renovation at 1445 Ross Avenue
A 4,820-square-foot corporate office renovation for Integrity Level 55 is planned at 1445 Ross Avenue in Dallas. The TDLR project registration was filed May 22, 2026, and describes removing and replacing interior walls, ceilings, lighting and finishes, with new millwork and furniture. The applicant estimated the project cost at $500,000.
Summarized from Texas Department of Licensing and Regulation records · updated May 22, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 22, 2026
- since May 22, 2026
- Largest scope
- 4,820 sf
- Estimated cost
- $500K
- state registration
Where this project stands
Under constructionIntegrity Level 55
4,820 sq ft · $500K est.
- RegisteredMay 22, 2026
- Plan review
- ConstructionAug '26 – Dec '26
- Inspected
- Closed
4 contacts on this project · 4 phone numbers
Permit & project history
1 projectRenovations to corporate office, including demolition of exisiting walls, act ceiling, lighting, and select finishes. construction of new walls, ceiling, and millwork. installation of new lighting, finishes, and furniture. — fountain place
TDLR project registrationRenovation/AlterationReview Complete4,820 sq ft$500K est.- Project #
- TABS2026021018
- Tenant / owner
- Integrity Level 55
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1445 Ross Avenue 55th
What is being built at 1445 Ross Avenue in Dallas?
The TDLR registration describes a renovation of Integrity Level 55’s corporate office, including new walls, ceilings, lighting, finishes and millwork. It does not describe a new building.
What work is planned for Integrity Level 55 at 1445 Ross Avenue?
The scope includes demolition of existing walls, ceiling, lighting and select finishes, followed by new walls, ceiling, lighting, finishes, millwork and furniture. The registration is for a 4,820-square-foot renovation.
When was the 1445 Ross Avenue office renovation filed?
The project registration, TABS2026021018, was filed with TDLR on May 22, 2026. Its status is listed as Review Complete.
How much will the Integrity Level 55 renovation cost?
The applicant’s estimated cost for the project is $500,000. This is an estimate in the TDLR registration, not a confirmed final cost.
How large is the office renovation at 1445 Ross Avenue?
The TDLR registration lists the renovation area as 4,820 square feet.
What's happening next to Integrity - Project Elevate 2.0 at 1445 Ross Avenue?
A separate TDLR registration describes a renovation of Integrity Level 55’s corporate office at 1445 Ross Avenue. It was filed May 22, 2026, and lists 4,820 square feet of work.
Also being built nearby
All of 75202- 1445 Ross Avenue, 52nd · 1445 Ross Ave., LLCApr 6, 2026Integrity marketing group — renovation/alteration — new buildout from previously built-out space for executive office suites to include breakroom, private offices, hallways, reception area, conference room, and restrooms
- 1445 Ross Ave Floors 19 And 20 · 1445 Ross Ave LLCSep 15, 2026Morgan stanely floors 19 and 20 - dallas tx — renovation/alteration — renovate in place the existing 19th and 20th floors of an existing building (fountain place) to serve as office space for a new business-occupancy tenant
- 1445 Ross Avenue · 1445 Ross Ave, LLCNov 26, 202529th floor public corridor and restrooms — renovation/alteration — interior renovation of existing common areas in a high rise office building
- 1445 Ross Ave.suite 22 · Fountain PlaceDec 8, 2025Integrity - project elevate 2.0 — renovation/alteration — the scope of this project is non-structural interior finish-out in an existing singe floor suite to include private offices, reception, conference room, and break room
- 1445 Ross AveNov 19, 2026Phase 1 - remodel 19th and 20th floors
- 1800 Field StSep 23, 2020Tc-2020-20594 date 9/18/20 time 9:00 am to 3:30pm · 26 m away
- 1800 N Field StMar 18, 2026Perform torque and clean of two services · 26 m away
- 1581 Ross AveMay 16, 2025Meter was turned off. oncor requested city inspection to restore service · 87 m away
- 1581 Ross AveNov 11, 2026Needing to restore power to small cell after meter was removed · 87 m away
- 1365 San Jacinto StDec 17, 2020Permanent electrical service · 101 m away
- 1338 San Jacinto StSep 30, 2026An 8 feet tall construction fence is needed around the property for material laydown and parking area. fence will be needed on san jacinto street and n field street. the other two sides will not have fencing. they are open to the other enclosed fence areas. the lot is currently used only for parking · 122 m away
- 1598 Ross AveOct 20, 2020Permanent electrical service · 130 m away