1445 Ross Ave Floors 19 And 20
Dallas, TX 75202 · 1445 Ross Ave LLC
Office renovation planned for floors 19 and 20 at Fountain Place
A 50,000-square-foot renovation of the existing 19th and 20th floors at Fountain Place is planned for office space for a new business-occupancy tenant. The Texas Department of Licensing and Regulation registered the project on September 15, 2026, under project number TABS2027001114. The applicant’s estimated project cost is $3.2 million.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2026
- since Sep 15, 2026
- Largest scope
- 50,000 sf
- Estimated cost
- $3.2M
- state registration
Where this project stands
In state plan reviewMorgan Stanely Floors 19 and 20 - Dallas TX
50,000 sq ft · $3.2M est.
- RegisteredSep 15, 2026
- Plan reviewnow
- ConstructionOct '26 – Nov '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectRenovate in place the existing 19th and 20th floors of an existing building (fountain place) to serve as office space for a new business-occupancy tenant. — fountain place
TDLR project registrationRenovation/AlterationProject Registered50,000 sq ft$3.2M est.- Project #
- TABS2027001114
- Tenant / owner
- Morgan Stanely Floors 19 And 20 - Dallas TX
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 1445 Ross Ave Floors 19 And 20
What is being built at 1445 Ross Ave?
The existing 19th and 20th floors at Fountain Place are planned for renovation into office space for a new business-occupancy tenant. The project was registered with TDLR on September 15, 2026.
What is going in on the 19th and 20th floors of Fountain Place?
A 50,000-square-foot office renovation is planned for the two existing floors. The registration does not name the new tenant.
When was the Fountain Place office renovation registered?
The project was registered on September 15, 2026, with the Texas Department of Licensing and Regulation. Its project number is TABS2027001114.
How much will the Fountain Place renovation cost?
The applicant’s estimated cost for the project is $3.2 million. This is an estimate, not a reported final project cost.
How large is the office renovation at 1445 Ross Ave?
The registered project covers 50,000 square feet on the existing 19th and 20th floors of Fountain Place.
Who is moving into floors 19 and 20 at Fountain Place?
The project description says the renovated floors will serve as office space for a new business-occupancy tenant, but it does not identify that tenant.
Also being built nearby
All of 75202- 1445 Ross Avenue, 52nd · 1445 Ross Ave., LLCApr 6, 2026Integrity marketing group — renovation/alteration — new buildout from previously built-out space for executive office suites to include breakroom, private offices, hallways, reception area, conference room, and restrooms
- 1445 Ross Avenue 55th · 1445 Ross Ave, LLCMay 22, 2026Integrity level 55 — renovation/alteration — renovations to corporate office, including demolition of exisiting walls, act ceiling, lighting, and select finishes. construction of new walls, ceiling, and millwork. installation of new lighting, finishes, and furniture
- 1445 Ross Avenue · 1445 Ross Ave, LLCNov 26, 202529th floor public corridor and restrooms — renovation/alteration — interior renovation of existing common areas in a high rise office building
- 1445 Ross Ave.suite 22 · Fountain PlaceDec 8, 2025Integrity - project elevate 2.0 — renovation/alteration — the scope of this project is non-structural interior finish-out in an existing singe floor suite to include private offices, reception, conference room, and break room
- 1445 Ross AveNov 19, 2026Phase 1 - remodel 19th and 20th floors
- 1800 Field StSep 23, 2020Tc-2020-20594 date 9/18/20 time 9:00 am to 3:30pm · 26 m away
- 1800 N Field StMar 18, 2026Perform torque and clean of two services · 26 m away
- 1581 Ross AveMay 16, 2025Meter was turned off. oncor requested city inspection to restore service · 87 m away
- 1581 Ross AveNov 11, 2026Needing to restore power to small cell after meter was removed · 87 m away
- 1365 San Jacinto StDec 17, 2020Permanent electrical service · 101 m away
- 1338 San Jacinto StSep 30, 2026An 8 feet tall construction fence is needed around the property for material laydown and parking area. fence will be needed on san jacinto street and n field street. the other two sides will not have fencing. they are open to the other enclosed fence areas. the lot is currently used only for parking · 122 m away
- 1598 Ross AveOct 20, 2020Permanent electrical service · 130 m away
More offices in 75202.