2323 Victory Ave
Dallas, TX 75202 · Balfour Beatty, Ey: Dallas - Fids Relocation
Ninth-floor office finish-out planned at 2323 Victory Ave
A ninth-floor office finish-out at 2323 Victory Ave includes new finishes, a break room, offices, a conference room and an open work area. The City of Dallas permit was filed October 21, 2026; the listed scope identifies Balfour Beatty.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 21, 2026
- Projects
- 60
- 60 filings
- Latest filing
- Oct 21, 2026
- since Oct 22, 2025
- Largest scope
- 28,466 sf
- Estimated cost
- $6.0M
- state registration
Permit & project history
60 projectsMcr location address: 2323 victory ave 250 dallas, tx 75219 scope of work:finish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area
Mcr location address: 2323 victory ave 250 dallas, tx 75219 scope of work:finish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area
City of Dallas permitCommercial Alteration Addition Permit51261 - victory capital improvements mcr capital improvements to include remodel of corridor and restroom
51261 - victory capital improvements mcr capital improvements to include remodel of corridor and restroom
City of Dallas permitCommercial Electrical Permit51261 - victory capital improvements floor 9mcr capital improvements to include remodel of corridor and restrooms
51261 - victory capital improvements floor 9mcr capital improvements to include remodel of corridor and restrooms
City of Dallas permitCommercial Electrical Permit51261 - victory capital improvements floor 7mcr capital improvements to include remodel of corridor and restrooms
51261 - victory capital improvements floor 7mcr capital improvements to include remodel of corridor and restrooms
City of Dallas permitCommercial Electrical Permit• demolition of the following:o (3) floor mounted crac units and associated ductwork and piping o existing underfloor air distribution galvanized and fabric ductwork o existing transfers installed within the ceiling plenumo remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock• relocation of the following:o (33) fpb’so ductwork and air devices as indicated• provision & installation of the following:o o roof curbs, hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto refrigerant pipingo condensate drain pipingo vibration isolation as specifiedo mechanical identification
• demolition of the following:o (3) floor mounted crac units and associated ductwork and piping o existing underfloor air distribution galvanized and fabric ductwork o existing transfers installed within the ceiling plenumo remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock• relocation of the following:o (33) fpb’so ductwork and air devices as indicated• provision & installation of the following:o o roof curbs, hangers and supports as specifiedo ductwork with insulationo fire and fire/smoke dampers, where shown on planso fire stopping for mechanical itemso grilles, registers, and diffusers with flex ducto refrigerant pipingo condensate drain pipingo vibration isolation as specifiedo mechanical identification
City of Dallas permitCommercial Mechanical Permit•??demolition of the following:o??(3) floor mounted crac units and associated ductwork and piping o??existing underfloor air distribution galvanized and fabric ductwork o??existing transfers installed within the ceiling plenumo??remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock•??relocation of the following:o??(33) fpb’so??ductwork and air devices as indicated•??provision & installation of the following:o??o??roof curbs, hangers and supports as specifiedo??ductwork with insulationo??fire and fire/smoke dampers, where shown on planso??fire stopping for mechanical itemso??grilles, registers, and diffusers with flex ducto??refrigerant pipingo??condensate drain pipingo??vibration isolation as specifiedo??mechanical identification
•??demolition of the following:o??(3) floor mounted crac units and associated ductwork and piping o??existing underfloor air distribution galvanized and fabric ductwork o??existing transfers installed within the ceiling plenumo??remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock•??relocation of the following:o??(33) fpb’so??ductwork and air devices as indicated•??provision & installation of the following:o??o??roof curbs, hangers and supports as specifiedo??ductwork with insulationo??fire and fire/smoke dampers, where shown on planso??fire stopping for mechanical itemso??grilles, registers, and diffusers with flex ducto??refrigerant pipingo??condensate drain pipingo??vibration isolation as specifiedo??mechanical identification
City of Dallas permitCommercial Mechanical Permit•??demolition of the following:o??(3) floor mounted crac units and associated ductwork and piping o??existing underfloor air distribution galvanized and fabric ductwork o??existing transfers installed within the ceiling plenumo??remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock•??relocation of the following:o??(33) fpb’so??ductwork and air devices as indicated•??provision & installation of the following:o??o??roof curbs, hangers and supports as specifiedo??ductwork with insulationo??fire and fire/smoke dampers, where shown on planso??fire stopping for mechanical itemso??grilles, registers, and diffusers with flex ducto??refrigerant pipingo??condensate drain pipingo??vibration isolation as specifiedo??mechanical identification
•??demolition of the following:o??(3) floor mounted crac units and associated ductwork and piping o??existing underfloor air distribution galvanized and fabric ductwork o??existing transfers installed within the ceiling plenumo??remove, clean and stack existing floor diffusers for reuse and return excess to owner for building stock•??relocation of the following:o??(33) fpb’so??ductwork and air devices as indicated•??provision & installation of the following:o??o??roof curbs, hangers and supports as specifiedo??ductwork with insulationo??fire and fire/smoke dampers, where shown on planso??fire stopping for mechanical itemso??grilles, registers, and diffusers with flex ducto??refrigerant pipingo??condensate drain pipingo??vibration isolation as specifiedo??mechanical identification
City of Dallas permitCommercial Mechanical PermitProposed scope of work includes demolition of previous tenant interiors, for new construction of interior non-structural partitions for open office, meeting rooms, break room, idf/server. — one victory park
TDLR project registrationRenovation/AlterationReview Complete28,466 sq ft$6.0M est.- Project #
- TABS2026025498
- Tenant / owner
- Balfour Beatty
- Design firm
- Pro
- Contact
- Pro
+ 20 older projects. See the full history with a free trial.
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2323 Victory Ave
What is being built at 2323 Victory Ave?
A ninth-floor office finish-out is planned, with new finishes, a break room, offices, a conference room and an open work area. The City of Dallas permit, COM-ALT-ADD-26-002592, was filed October 21, 2026.
Is a new building going up at 2323 Victory Ave?
The recent permit describes interior finish-out work on the ninth floor, not construction of a new building. It lists new finishes and office spaces.
When was the 2323 Victory Ave office work permitted?
The ninth-floor finish-out permit was filed with the City of Dallas on October 21, 2026. Its permit number is COM-ALT-ADD-26-002592.
What work is planned for the sixth and seventh floors at 2323 Victory Ave?
A City of Dallas permit filed August 20, 2026, describes first-time finish-outs for floors six and seven. The record says applications for certificates of occupancy had been submitted.
What's being built near the Dallas Wings Lockers at AAC?
At 2323 Victory Ave, a ninth-floor office finish-out is planned, including offices, a break room, a conference room and an open work area. The permit was filed October 21, 2026.
Is the work at 2323 Victory Ave an office renovation?
Yes. The October 21, 2026, permit describes an interior office finish-out on the ninth floor, while other 2026 permits cover office finish-outs and improvements on additional floors.
Also being built nearby
All of 75202- 2323 Victory Avenue · Clpf One Victory LP C/O Clarion Partners LLCMar 26, 2026Marsh dallas — renovation/alteration — interior renovation to include the entirety of the 10th floor and a portion of the 9th floor, including workplace space, break rooms and a client facing conference area. area or work is 37,395 sq ft
- 2323 Victory Ave, 6th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 06 capital improvementsv — renovation/alteration — interior alteration of existing interior office common space
- 2323 Victory Ave, 9th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 09 capital improvements — renovation/alteration — alteration of existing interior office common space
- 2323 Victory Ave · One Victory ParkJun 24, 2026Vmg — renovation/alteration — tenant improvement
- 2323 Victory Ave, 10th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 10 restroom upgrades — renovation/alteration — alteration of existing interior office restrooms
- 2323 Victory Ave · Clpf One Victory LP C/O Clarion Partners LLCOct 19, 2026Hf sinclair partial 9th floor renovation — renovation/alteration — finish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area
- 2500 Victory AveSep 29, 2020Applying for a new permit for the installation of 3 addressable monitoring module for the new fm200 · 19 m away
- 2500 Victory Ave · Center Operating CompanyNov 11, 2026The project scope consists of interior renovation and fit-out of approximately 3,225 sq ft on the northeast corner of the american airlines center on "event level" - qteam inhouse - one story below sidewalk grade. the fit-out includes a locker room facility and associated program for the dallas wings wnba team · 19 m away
- 2500 Victory Ave · City Of DallasNov 11, 2026Dallas wings lockers - aac — renovation/alteration — 3,225sf renovation incudes a locker room facility and associated program for the dallas wings wnba team · 19 m away
- 2323 N Houston StMar 16, 2026Install 38 gallon electric water heater · 86 m away
- 2323 N Houston StOct 26, 20263 ton hvac full system replacement for ubit 613 · 86 m away
- 2200 Victory AveJul 29, 20264 ton deluxe hp electric system · 101 m away
More demolitions in 75202, warehouses & industrial in 75202, offices in 75202.