2323 Victory Ave
Dallas, TX 75219 · Hf Sinclair Partial 9th Floor Renovation, Hf Sinclair Dallas
HF Sinclair 9th-floor office renovation at One Victory Park
A 5,000-square-foot partial ninth-floor office renovation is planned at 2323 Victory Ave in One Victory Park. The Texas Department of Licensing and Regulation registered the project on October 19, 2026; the scope lists new finishes, a break room, offices, a conference room and open work area. The applicant’s estimated project cost is $4 million.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Oct 19, 2026
- Projects
- 31
- 31 filings
- Latest filing
- Oct 19, 2026
- since Nov 11, 2020
- Largest scope
- 5,000 sf
- Estimated cost
- $18M
- state registration
Where this project stands
In state plan reviewHF Sinclair Partial 9th Floor Renovation
5,000 sq ft · $4.0M est.
- RegisteredOct 19, 2026
- Plan reviewnow
- ConstructionDec '26 – Jun '27
- Inspected
- Closed
Construction is scheduled to start Dec 15, 2026. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
31 projectsFinish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area. — one victory park
TDLR project registrationRenovation/AlterationProject Registered5,000 sq ft$4.0M est.- Project #
- TABS2027003894
- Tenant / owner
- Hf Sinclair Partial 9th Floor Renovation
- Design firm
- Pro
- Contact
- Pro
51261 - victory capital improvements floor 9mcr capital improvements to include remodel of corridor and restrooms
51261 - victory capital improvements floor 9mcr capital improvements to include remodel of corridor and restrooms
City of Dallas permitCommercial Electrical Permit• relocation of the following:o (47) underfloor fan powered boxes• provision & installation of the following:o (2) inline exhaust fanso (1) water cooled crac unito hangers and supports as specifiedo ductwork with insulationo duct sox for interior zone duct runso transfer ducts as showno fire and fire/smoke dampers, where shown on planso grilles, registers, and diffuserso condenser water pipingo condensate drain pipingo vibration isolation as specifiedo mechanical identification
• relocation of the following:o (47) underfloor fan powered boxes• provision & installation of the following:o (2) inline exhaust fanso (1) water cooled crac unito hangers and supports as specifiedo ductwork with insulationo duct sox for interior zone duct runso transfer ducts as showno fire and fire/smoke dampers, where shown on planso grilles, registers, and diffuserso condenser water pipingo condensate drain pipingo vibration isolation as specifiedo mechanical identification
City of Dallas permitCommercial Mechanical PermitMcr phased project for suite 900 & 1000interior renovation to include the entirety of the 10th floor 26317 sq ft, and a portion of the 9th floor 11078, including workplace space, break rooms and a client facing conference area. area or work is 37,395 sq ft
Mcr phased project for suite 900 & 1000interior renovation to include the entirety of the 10th floor 26317 sq ft, and a portion of the 9th floor 11078, including workplace space, break rooms and a client facing conference area. area or work is 37,395 sq ft
City of Dallas permitCommercial Alteration Addition PermitProvision & installation of the following: o (3) underfloor air terminal diffuser ? please note: floor tiles to be cut by others o (1) transfer air boot • balance (6) existing floor diffusers and (3) new floor diffusers – performed by vmi • start-up equipment • extend existing ddc controls to new underfloor terminal • hoisting & man-lifts • daily cleanup of our identifiable trash to an on-site, general contractor provided, dumpster
Provision & installation of the following: o (3) underfloor air terminal diffuser ? please note: floor tiles to be cut by others o (1) transfer air boot • balance (6) existing floor diffusers and (3) new floor diffusers – performed by vmi • start-up equipment • extend existing ddc controls to new underfloor terminal • hoisting & man-lifts • daily cleanup of our identifiable trash to an on-site, general contractor provided, dumpster
City of Dallas permitCommercial Mechanical PermitConstruct two new office suites, adjacent to one another at 15th floor---suites 1560 and 1570. interior finish out, demising walls, new finishes, mep and new life safety (fire alarm/fire sprinkler). address for suites are created. please create one phase per suite and assign the suite number at phase approval for addresses.• suite 1560: 5739 usf, $545,200.00• suite 1570: 2,705 usf, $254,800.00
Construct two new office suites, adjacent to one another at 15th floor---suites 1560 and 1570. interior finish out, demising walls, new finishes, mep and new life safety (fire alarm/fire sprinkler). address for suites are created. please create one phase per suite and assign the suite number at phase approval for addresses.• suite 1560: 5739 usf, $545,200.00• suite 1570: 2,705 usf, $254,800.00
City of Dallas permitCommercial Alteration Addition PermitInterior tenant renovation and finish out on three full floors, levels 11, 12, and 14. — one victory park
TDLR project registrationRenovation/AlterationProject Closed81,000 sq ft$18M est.- Project #
- TABS2024000098
- Tenant / owner
- Hf Sinclair Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 2323 Victory Ave
What is being built at 2323 Victory Ave in Dallas?
Records describe a partial ninth-floor office renovation for HF Sinclair at One Victory Park, including updated finishes, a break room, offices, a conference room and open work area. The 5,000-square-foot project was registered with TDLR on October 19, 2026.
Is HF Sinclair renovating an office at One Victory Park?
Yes. TDLR project registration TABS2027003894 describes an HF Sinclair partial ninth-floor renovation at 2323 Victory Ave.
When was the 9th-floor renovation at 2323 Victory Ave filed?
The TDLR registration was filed October 19, 2026. A City of Dallas permit for interior demolition in suite 950, COM-ALT-ADD-26-002375, was filed October 7, 2026.
How much will the HF Sinclair renovation at One Victory Park cost?
The TDLR registration lists an applicant-estimated project cost of $4 million. This is an estimate for the project, not a final reported cost.
What other office work is planned at 2323 Victory Ave?
A City of Dallas filing dated August 6, 2026, describes office work for Balfour Beatty on floors 6 and 7. Separate filings also describe capital improvements to a ninth-floor corridor and restrooms.
What's being renovated near the Dallas Wings lockers at 2500 Victory Ave?
At 2323 Victory Ave, about 19 meters from the Dallas Wings lockers listing, records describe a 5,000-square-foot partial ninth-floor office renovation for HF Sinclair. TDLR registered the project on October 19, 2026.
Also being built nearby
All of 75219- 2323 Victory Avenue · Clpf One Victory LP C/O Clarion Partners LLCMar 26, 2026Marsh dallas — renovation/alteration — interior renovation to include the entirety of the 10th floor and a portion of the 9th floor, including workplace space, break rooms and a client facing conference area. area or work is 37,395 sq ft
- 2323 Victory Ave · Clpf One Victory LP C/O Clarion Partners LLCOct 21, 2026Mcr location address: 2323 victory ave 250 dallas, tx 75219 scope of work:finish out of 9th floor, new finishes throughout, new break room, offices, conference room and open work area
- 2323 Victory Ave, 6th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 06 capital improvementsv — renovation/alteration — interior alteration of existing interior office common space
- 2323 Victory Ave, 9th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 09 capital improvements — renovation/alteration — alteration of existing interior office common space
- 2323 Victory Ave · One Victory ParkJun 24, 2026Vmg — renovation/alteration — tenant improvement
- 2323 Victory Ave, 10th · Clpf One Victory, L.p. C/O Clarion Partners LLCJun 17, 2026Level 10 restroom upgrades — renovation/alteration — alteration of existing interior office restrooms
- 2500 Victory AveSep 29, 2020Applying for a new permit for the installation of 3 addressable monitoring module for the new fm200 · 19 m away
- 2500 Victory Ave · Center Operating CompanyNov 11, 2026The project scope consists of interior renovation and fit-out of approximately 3,225 sq ft on the northeast corner of the american airlines center on "event level" - qteam inhouse - one story below sidewalk grade. the fit-out includes a locker room facility and associated program for the dallas wings wnba team · 19 m away
- 2500 Victory Ave · City Of DallasNov 11, 2026Dallas wings lockers - aac — renovation/alteration — 3,225sf renovation incudes a locker room facility and associated program for the dallas wings wnba team · 19 m away
- 2323 N Houston StMar 16, 2026Install 38 gallon electric water heater · 86 m away
- 2323 N Houston StOct 26, 20263 ton hvac full system replacement for ubit 613 · 86 m away
- 2200 Victory AveJul 29, 20264 ton deluxe hp electric system · 101 m away