groundranger
Active · latest filing Oct 2026Commercial

1001 Ross Ave

Dallas, TX 75202 · Cc Meyer Properties LLC

Zero Latency interior renovation at 1001 Ross Ave

A 5,881-square-foot interior finishout for Zero Latency was registered with the Texas Department of Licensing and Regulation on May 18, 2026. The applicant estimated the project cost at $400,000. Dallas permits filed later in 2026 describe electrical work and plumbing for two restrooms.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 20, 2026

Projects
19
19 filings
Latest filing
Oct 20, 2026
since Oct 12, 2020
Largest scope
5,881 sf
Estimated cost
$400K
state registration

Where this project stands

Finishing up · inspection next

Zero Latency

5,881 sq ft · $400K est.

  1. RegisteredMay 18, 2026
  2. Plan review
  3. ConstructionJun '26 – Oct '26
  4. Inspectednow
  5. Closed

Scheduled to finish Oct 30, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 2 phone numbers

Permit & project history

19 projects
  1. We are going to be adding new receptacles /lights/ switches, on new walls. using existing panels and circuits

    We are going to be adding new receptacles /lights/ switches, on new walls. using existing panels and circuits

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-005194
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install plumbing for 2 rest rooms--sinks--floor drains--elec. water heater

    Install plumbing for 2 rest rooms--sinks--floor drains--elec. water heater

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-003850
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Qteam inhouse suite 104. interior finish out of a partial floor in an existing mixed use building for new tenant. the work includes limited demolition, new non-structural partitions, ceilings, finishes, millwork and furniture/equipment and associated mep improvements

    Qteam inhouse suite 104. interior finish out of a partial floor in an existing mixed use building for new tenant. the work includes limited demolition, new non-structural partitions, ceilings, finishes, millwork and furniture/equipment and associated mep improvements

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-001061
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Zero Latency

    Interior finishout by tenant — zero latency

    TDLR project registrationRenovation/AlterationReview Complete5,881 sq ft$400K est.
    Tenant / owner
    Zero Latency
    Design firm
    Pro
    Contact
    Pro
  5. Mcr remodel permit to white box the space. no finishes going back

    Mcr remodel permit to white box the space. no finishes going back

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000989
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. No tenant vacant space, needing electricity turned on because it is effecting fire alarm system

    No tenant vacant space, needing electricity turned on because it is effecting fire alarm system

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-002055
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Erect attached sign

    Erect attached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    2101181035
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Erect attached sign

    Erect attached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    2101181034
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Electrical remodel

    Electrical remodel

    City of Dallas permitElectrical (EL) Commercial Alteration$25
    Record
    2010273023
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Replace or modify existing hvac

    Replace or modify existing hvac

    City of Dallas permitMechanical (ME) Commercial Alteration$24
    Record
    2010163004
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  11. Erect attached sign

    Erect attached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    2010061091
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Service release no work

    Service release no work

    City of Dallas permitElectrical (EW) Commercial Alteration
    Record
    2009104001
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Commercial Renovation$55
    Record
    2007311107
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Erect attached sign

    Erect attached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    2007281111
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Interior/ exterior remodel (walk-up atm machine)

    Interior/ exterior remodel (walk-up atm machine)

    City of Dallas permitBuilding (BU) Commercial Renovation$6
    Record
    2006291045
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Tc-2020-09103 4-13-20 to 6-30-20 9a to 3:30p daily

    Tc-2020-09103 4-13-20 to 6-30-20 9a to 3:30p daily

    City of Dallas permitBarricade (BA) Commercial Alteration
    Record
    2004231066
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Tc-2019-33637 9:00 am to 3:30 pm 11/20/19 to 02/28/20

    Tc-2019-33637 9:00 am to 3:30 pm 11/20/19 to 02/28/20

    City of Dallas permitBarricade (BA) Commercial Alteration
    Record
    1911211026
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  18. Remodel

    Remodel

    City of Dallas permitBuilding (BU) Commercial Renovation$42
    Record
    1910291024
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  19. Erect attached sign

    Erect attached sign

    City of Dallas permitElectrical Sign New Construction
    Record
    1908135004
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 1001 Ross Ave

What is being built at 1001 Ross Ave in Dallas?

Records show a 5,881-square-foot interior finishout for Zero Latency. The TDLR registration was filed May 18, 2026.

When was the Zero Latency project at 1001 Ross Ave permitted?

The TDLR project registration is dated May 18, 2026, and its review status is complete. Dallas electrical and plumbing permits for work at the address were filed October 20 and September 30, 2026, respectively.

How much will the work at 1001 Ross Ave cost?

The TDLR registration lists an applicant estimate of $400,000 for the project. This is an estimate, not a confirmed final cost.

What work is included in the 1001 Ross Ave permits?

A Dallas electrical permit dated October 20, 2026, describes adding receptacles, lights and switches on new walls using existing panels and circuits. A September 30 plumbing permit describes plumbing for two restrooms, including sinks, floor drains and an electric water heater.

Is a new Zero Latency location confirmed at 1001 Ross Ave?

The records identify a Zero Latency interior finishout, but do not give an opening date or confirm when the space will begin operating.

What is being built near Highlevel on Lamar Street?

At 1001 Ross Ave, about 104 meters from Highlevel at 1801 Lamar Street, records show a 5,881-square-foot interior finishout for Zero Latency. The TDLR registration is dated May 18, 2026.

What construction is happening near Fire Station 18?

At 1001 Ross Ave, about 208 meters from Fire Station 18, a Zero Latency interior finishout is registered for 5,881 square feet. Dallas permits also describe electrical and restroom plumbing work at the address.

Also being built nearby

All of 75202

More demolitions in 75202.

Email me when it passes inspection