1301 Young St
Dallas, TX 75202
Commercial accessory-structure permit filed at 1301 Young St
A City of Dallas permit record indicates a commercial accessory structure at 1301 Young St. The permit, COM-ACC-25-000088, was filed July 25, 2025; its description, “Manual recreation***2403041139,” does not specify the structure.
Summarized from City of Dallas records · updated Jul 25, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jul 25, 2025
- since Jul 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1301 Young St
What is being built at 1301 Young St in Dallas?
A City of Dallas record lists a commercial accessory structure permit, but the description does not identify the structure.
When was the 1301 Young St permit filed?
The permit was filed July 25, 2025. Its number is COM-ACC-25-000088.
What does permit COM-ACC-25-000088 cover?
It is categorized as a Commercial Accessory Structure Permit. The record's description is “Manual recreation***2403041139” and provides no further details.
What's being built near Dallas Mock Store on S. Akard Street?
A commercial accessory-structure permit was filed at 1301 Young St, about 214 meters from Dallas Mock Store. The permit record does not specify the structure.
Is construction planned near the FIFA International Broadcasting Center?
A commercial accessory-structure permit was filed at 1301 Young St, about 268 meters from the listed FIFA International Broadcasting Center. The record does not describe the structure or provide a construction schedule.
Also being built nearby
All of 75202- 427 S Akard StOct 26, 2020Permanent electrical service · 138 m away
- 400 S Akard StMay 20, 2025Changing light fixtures, adding receptacles into 2 offices · 165 m away
- 400 South Akard Street Basement 1 · Db Data Center DallasMar 24, 2025Gigabit fiber - suite 200 — renovation/alteration — remodel existing space · 165 m away
- 1300 Jackson StApr 9, 2026Gas test only · 183 m away
- 311 S Akard StAug 21, 2026Gas repipe · 206 m away
- 311 Akard St · 4 At&tMay 2, 20254 at&t - level 5 renovation — renovation/alteration — renovation of an existing space. to include restroom work · 206 m away
- 308 S. Akard Street · At&t Discovery DistrictMar 10, 2026Dallas mock store — renovation/alteration — interior renovation of existing 4360 sq ft retail space including new interior partitions, casework fixtures, and select electrical · 214 m away
- 308 S Akard StSep 28, 2026Installation of 400a service to power distribution unit for battery room · 214 m away
- 1122 Jackson StJun 1, 2026Removal of existing hvac system and installation of new hvac system · 251 m away
- 1222 Commerce StApr 30, 2026Relocate meter from basement to new meter location · 264 m away
- 650 S Griffin St · City Of DallasNov 12, 2026Evolve concepts has been contracted by hyrox to install and subsequently remove three temporary, freestanding modular structures inside the kay bailey hutchinson convention center at 650 s griffin st, dallas, tx 75202 for a hyrox athletic competition. the installation consist of two elevated spectator viewing platforms and one elevated pedestrian course bridge. the structures will be assembled using engineered modular components, with stairs, guardrails and supporting structural elements as detailed in the submitted drawings. all structures are temporary, will be removed following the event, and will not involve permanent modifications to the existing building · 268 m away
- 1321 Commerce St · Rockbridge CapitalNov 10, 2026Temporary bleachersinstall: 12/01/26 - 12/04/26take down: 12/05/26 - 12/07/26 · 278 m away