groundranger
Active · latest filing Nov 2026Commercial

1025 W Loop 820 N

Fort Worth, TX 76108 · White Settlement ISD

Brewer High School HVAC replacement registered in Fort Worth

A partial HVAC replacement is planned at White Settlement ISD’s Brewer High School at 1025 W Loop 820 N in Fort Worth. The project was registered with the Texas Department of Licensing and Regulation on November 10, 2026, and calls for replacing geothermal heat pump air-conditioning units and adding two closed-circuit fluid cooler machines.

Summarized from Texas Department of Licensing and Regulation records · updated Nov 10, 2026

Projects
1
1 filings
Latest filing
Nov 10, 2026
since Nov 10, 2026
Largest scope
10,000 sf
Estimated cost
$5.2M
state registration

Where this project stands

In state plan review

White Settlement ISD Brewer High School Partial HVAC Replacement

10,000 sq ft · $5.2M est.

  1. RegisteredNov 10, 2026
  2. Plan reviewnow
  3. ConstructionMar '27 – Dec '27
  4. Inspected
  5. Closed

Construction is scheduled to start Mar 15, 2027. Subcontractors and suppliers are usually picked in the weeks before.

4 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Replacement of geothermal heat pump air conditioning units and addition of two closed circuit fluid cooler machines for geothermal well field temperature management. — brewer high school

    TDLR project registrationRenovation/AlterationProject Registered10,000 sq ft$5.2M est.
    Tenant / owner
    White Settlement ISD Brewer High School Partial Hvac Replacement
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 1025 W Loop 820 N

What is being built at 1025 W Loop 820 N in Fort Worth?

The project is a partial HVAC replacement at Brewer High School, including replacement geothermal heat pump air-conditioning units and two closed-circuit fluid cooler machines. It was registered on November 10, 2026, under TDLR number TABS2027005577.

Is a new school being built at Brewer High School?

The registration describes a renovation and alteration for partial HVAC replacement, not a new school building. The work includes equipment for the geothermal well field.

What HVAC work is planned at Brewer High School?

The project calls for replacing geothermal heat pump air-conditioning units and adding two closed-circuit fluid cooler machines to manage geothermal well field temperatures.

When was the Brewer High School HVAC project registered?

The Texas Department of Licensing and Regulation project registration is dated November 10, 2026. Its project number is TABS2027005577.

How much is the Brewer High School HVAC project expected to cost?

The TDLR registration lists an estimated project cost of $5.24 million. This is the applicant’s estimate for the project.

What is being renovated near West Loop Varsity Sports?

Brewer High School, at 1025 W Loop 820 N, has a registered partial HVAC replacement project. West Loop Varsity Sports is listed about 477 meters away.

Also being built nearby

All of 76108

More schools & daycares in 76108.

Email me when plan review is complete