2525 E Abram
Arlington, TX 76010 · Gm Arlington 2nd Floor Renovation, General Motors H Dock Addition + 1 more
H Dock addition and second-floor renovation at multi-tenant building
TDLR registrations indicate H Dock work and a second-floor renovation at the multi-tenant building at 2525 E Abram, within the General Motors Arlington facility. The registrations were filed from December 12, 2024, through September 9, 2025, and describe new dock equipment and concrete, exterior paving, and updated bathrooms, conference rooms, and a virtual studio.
Summarized from Texas Department of Licensing and Regulation records · updated Sep 9, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Sep 9, 2025
- since Dec 12, 2024
- Largest scope
- 8,400 sf
- Estimated cost
- $2.0M
- state registration
Permit & project history
3 projectsDemolition of existing bathroom, conference room, and studio and install new bathrooms, conference rooms, and virtual studio — general motors arlington assembly
TDLR project registrationRenovation/AlterationInspection Complete3,000 sq ft$750K est.- Project #
- TABS2026000484
- Tenant / owner
- Gm Arlington 2nd Floor Renovation
- Design firm
- Pro
- Contact
- Pro
Exterior paving portion of h dock work — general motors arlington facility
TDLR project registrationAdditions to Existing BuildingProject Closed8,400 sq ft$350K est.- Project #
- TABS2025014534
- Tenant / owner
- General Motors H Dock Addition
- Design firm
- Pro
- Contact
- Pro
Demolition of existing wall panels, demolition of exterior paving, new structural steel, new dock equipment, new concrete — general motors arlington facility
TDLR project registrationAdditions to Existing BuildingReview Complete2,000 sq ft$2.0M est.- Project #
- TABS2025007572
- Tenant / owner
- General Motors H Dock Additioin
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2525 E Abram
What is being built at 2525 E Abram in Arlington?
TDLR registrations describe an H Dock addition and a second-floor renovation at the multi-tenant building. The work includes dock equipment, structural steel, concrete, exterior paving, and updated bathrooms, conference rooms, and a virtual studio.
Is General Motors doing construction at 2525 E Abram?
The registrations identify the projects as work at the General Motors Arlington facility. They describe H Dock work and a second-floor renovation.
When were the 2525 E Abram projects registered?
The three TDLR project registrations were filed December 12, 2024, March 18, 2025, and September 9, 2025.
What is the H Dock addition at the General Motors Arlington facility?
TDLR registrations describe demolition of wall panels and exterior paving, followed by structural steel, new dock equipment, concrete, and exterior paving work. The registrations were filed December 12, 2024, and March 18, 2025.
What is changing in the second-floor renovation at 2525 E Abram?
The registered scope includes removing an existing bathroom, conference room, and studio, then installing new bathrooms, conference rooms, and a virtual studio. The registration, TABS2026000484, was filed September 9, 2025.
How large is the H Dock project at 2525 E Abram?
The March 18, 2025, TDLR registration lists 8,400 square feet for the exterior paving portion of the H Dock work.
What is the status of the projects at 2525 E Abram?
The TDLR records list the second-floor renovation as Inspection Complete, the March 2025 H Dock registration as Project Closed, and the December 2024 H Dock registration as Review Complete.