333 E Division St
Arlington, TX 76011 · Rodeo Goat Arlington, 333 E. Division St.
Rodeo Goat Arlington interior finish-out
A 6,540-square-foot interior finish-out for Rodeo Goat Arlington is planned for an existing shell space at 333 E Division St. The Texas Department of Licensing and Regulation registration is dated October 3, 2024, and lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 3, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Oct 3, 2024
- since Oct 3, 2024
- Largest scope
- 6,540 sf
- Estimated cost
- $1.3M
- state registration
Permit & project history
2 projectsInterior finish out of an existing shell space — rodeo goat
TDLR project registrationRenovation/AlterationProject Closed6,540 sq ft$400K est.- Project #
- TABS2025002402
- Tenant / owner
- Rodeo Goat Arlington
- Design firm
- Pro
- Contact
- Pro
Interior and exterior remodel with site modifications for future tenant lease space including mechanical, electrical, plumbing, and civil work. — 333 e. division st
TDLR project registrationRenovation/AlterationProject Registered6,641 sq ft$1.3M est.- Project #
- TABS2023018302
- Tenant / owner
- 333 E. Division St.
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 333 E Division St
What is being built at 333 E Division St in Arlington?
A 6,540-square-foot interior finish-out for Rodeo Goat Arlington is registered for an existing shell space. The TDLR project registration is TABS2025002402.
When was the Rodeo Goat Arlington project registered?
The TDLR registration is dated October 3, 2024.
How large is the Rodeo Goat Arlington finish-out?
The project registration lists the interior finish-out as 6,540 square feet.
What is the estimated cost of the Rodeo Goat Arlington project?
The applicant's estimated cost for the project is $400,000.
Is the Rodeo Goat Arlington project complete?
The TDLR registration lists the project status as closed.
What's being built near Rocketbelly in Arlington?
The Rodeo Goat Arlington interior finish-out is registered at 333 E Division St, about 161 meters from Rocketbelly at 380 E Front St, Ste 100.
Also being built nearby
All of 76011- 340 E Front Street · Street RealtyJan 7, 2025Coop's fowl ball — new construction — ground up construction of a one-story pre-engineered metal building shell · 154 m away
- 380 E Front St, Ste100 · Rocketbelly LLCJun 11, 2025Rocketbelly — renovation/alteration — tenant finish out · 161 m away
- 400 E Front St · Urban Front LLCDec 31, 2024Breakfast brothers — renovation/alteration — tenant interior finish out for a restaurant concept in an existing shell space · 172 m away
- 200 E Front StJan 20, 2025Mama cuca's restaurant — renovation/alteration — renovation · 215 m away
- 200 E Front St · 100 East Front LLCDec 10, 2025Game theory — renovation/alteration — interior finish out · 215 m away
- 200 East Front Street · 100 East Front LLCMay 28, 2024Sfc whitebox — renovation/alteration — interior tenant improvement including mechanical, electrical, and plumbing. no site work · 215 m away
- 255 N Center St Po Box 200847, Arlington, TX 76006 · Community Chest, LLCJun 20, 2024Wheeler advertising build out — renovation/alteration — tenant improvement project. renovation of existing office space · 274 m away
- 101 S. Mesquite Street · City Of ArlingtonApr 2, 2024Arlington city tower elevator replacement — renovation/alteration — replace three elevators in main lobby · 317 m away
- 101 S. Mesquite St. Arlington TX -76010 · City Of ArlingtonJan 19, 2024City of arlington - city tower interior renovation flrs 1-8 — renovation/alteration — interior remodel to include renovated restroom to meet ada requirements, new interior finishes at elevator lobbies/corridors, typical on all floors level 1-8 and interior office lobby entry modification - level 3 · 317 m away
- 101 S Mesquite St · City Of Arlington TexasApr 1, 2026Phase 2 traffic management center 4th floor city tower — renovation/alteration — this project consists of renovation to a 1,689 square feet portion of the 4th floor of the city tower building to accommodate administrative offices to support the traffic management center (tmc) issued as phase 1 separate from this project · 317 m away
- 105 S Mesquite St · City Of ArlingtonAug 13, 2024The downtown arlington doggie depot construction — new construction — creation of dog park with small and large off-leash areas, and an on-leash seated area. project includes landscaping, fencing, concrete pathway, lighting, and furniture · 321 m away
- 209 North Pecan St · United Texkam Co.Jul 29, 2024Huckleberry's restaurant construction — new construction — new restaurant tenant finish-out interior construction including: walls, finishes, fixtures, equipment, hvac, lighting, power, plumbing installation · 404 m away