groundranger
Recent · latest filing Feb 2026Commercial

103 E 5th St

Austin, TX 78701

Interior demolition permit at 103 E 5th St has expired

City records show an interior non-structural demolition permit for 103 E 5th St, filed July 18, 2025; the permit is now expired. A separate electrical permit filed February 5, 2026, describes a projection sign for the Austin Convention Center. The records do not describe a new building at this address.

Summarized from City of Austin records · updated Feb 5, 2026

Projects
3
3 filings
Latest filing
Feb 5, 2026
since Dec 12, 2024
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. 28513 austin convention center projection sign

    28513 austin convention center projection sign

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior non-structural demolition

    Interior non-structural demolition

    City of Austin permitBuilding PermitExpired
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. ***per coordination with 2024 151367 rw no work to occur 12/19/24 12/20/24*** construct new sidewalk including ada ramps of 41.5 lf and curb & gutter of 44.5 ft. inspections paid through 2024 154621 000 00 ssi

    ***per coordination with 2024 151367 rw no work to occur 12/19/24 12/20/24*** construct new sidewalk including ada ramps of 41.5 lf and curb & gutter of 44.5 ft. inspections paid through 2024 154621 000 00 ssi

    City of Austin permitDriveway / SidewalksFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 103 E 5th St

What is happening at 103 E 5th St in Austin?

The City of Austin records show an interior non-structural demolition permit filed July 18, 2025. It is marked expired, and the records do not describe new construction.

Is a new building being built at 103 E 5th St?

The records provided do not describe a new building. They include an expired permit for interior non-structural demolition.

When was the demolition permit filed at 103 E 5th St?

The City of Austin lists permit 2024-113157 BP, for interior non-structural demolition, as filed July 18, 2025. Its status is expired.

What does the February 2026 permit at 103 E 5th St cover?

Electrical permit 2026-012894 EP was filed February 5, 2026. Its description refers to an Austin Convention Center projection sign, and its status is final.

What's happening near Phillips Level 2 at 105 East 5th Street?

At 103 E 5th St, City records show an expired interior demolition permit filed July 18, 2025. Phillips Level 2 is listed at the nearby address of 105 East 5th Street.

Is the sidewalk being rebuilt at 103 E 5th St?

A City of Austin driveway/sidewalk permit describes a new sidewalk with ADA ramps and curb and gutter work. Permit 2024-144803 DS, dated December 12, 2024, is marked final.

Also being built nearby

All of 78701

More demolitions in 78701.

Get alerts for 103 E 5th St