210 Lavaca St
Austin, TX 78701
Condo suite remodel and water heater replacement
City of Austin permits indicate interior remodeling of existing condominium suite 3502 and replacement of a 50-gallon electric water heater in the laundry room at 210 Lavaca St. The remodel permits were filed Aug. 22 and Dec. 2, 2024; the water heater permit was filed June 19, 2026.
Summarized from City of Austin records · updated Jun 19, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jun 19, 2026
- since Jul 25, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsReplacement of an existing water heater unt 3111 block 21 condominiums replace 50 gallon electric water heater location: laundry room
Replacement of an existing water heater unt 3111 block 21 condominiums replace 50 gallon electric water heater location: laundry room
City of Austin permitPlumbing PermitFinal- Record
- 2026-076492 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing condominium suite 3502
Interior remodel to existing condominium suite 3502
City of Austin permitPlumbing PermitFinal- Record
- 2024-147777 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing condominium suite 3502
Interior remodel to existing condominium suite 3502
City of Austin permitElectrical PermitFinal- Record
- 2024-089678 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel to existing condominium suite 3502
Interior remodel to existing condominium suite 3502
City of Austin permitBuilding PermitActive- Record
- 2024-089678 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel coming units 3101 & 3103 into one unit 3101 install private spa
Interior remodel coming units 3101 & 3103 into one unit 3101 install private spa
City of Austin permitBuilding PermitExpired- Record
- 2023-102945 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 210 Lavaca St
What is being built at 210 Lavaca St in Austin?
The permits listed for this address cover remodeling an existing condominium suite and replacing a water heater, not a new building.
Is a new building planned for 210 Lavaca St?
The City of Austin records provided show permits for work in an existing condominium, but do not list a new building project.
What work is planned for condo suite 3502 at 210 Lavaca St?
Permits describe an interior remodel of existing condominium suite 3502. The electrical permit was filed Aug. 22, 2024, and the plumbing permit was filed Dec. 2, 2024.
Is a water heater being replaced at 210 Lavaca St?
Yes. Permit 2026-076492 PP, filed June 19, 2026, covers replacing a 50-gallon electric water heater in a laundry room.
What permits were filed for 210 Lavaca St?
The records list plumbing permit 2026-076492 PP for a water heater replacement, plus electrical permit 2024-089678 EP and plumbing permit 2024-147777 PP for an interior remodel of suite 3502.
Also being built nearby
All of 78701- 212 Lavaca StMar 20, 2024Interior remodel of existing office space (plumbing demolition. only) [qt] · 8 m away
- 259 W 3rd StJun 4, 2026Card vault logo blade sign on the corner of w 3rd and lavaca · 42 m away
- 200 Lavaca StAug 19, 20267 day - fire pump fire pump controller jockey pump jockey pump controller replacement - ova · 45 m away
- 247 W 3rd StMar 26, 2024Remodel to existing restaurant. specifications new equipment interior partitions and new mep · 53 m away
- 201 Lavaca StMar 24, 2026Replacement of complete existing central heat and air system with or without duct work · 56 m away
- 313 Lavaca St · Riley BuildingNov 11, 2026Eplan: commercial expedited review - interior remodel and change of use from storage to cocktail lounge (3676 sq ft) · 57 m away
- 315 Lavaca StMay 8, 2024Installation of riley building headquarters sign at 315 lavaca suite 101 · 59 m away
- 212 Lavaca Street · Rhp Block 21 LLCFeb 16, 2024Weisbart springer hayes expansion — renovation/alteration — interior tenant fit out of expansion space. minimal demolition to interior finishes, walls and doors. plumbing is existing to remain. mechanical and electrical to be slightly modified. new interior finishes, partitions, doors and lighting elements · 62 m away
- 301 Lavaca StJan 21, 2022300 colorado office utility improvements · 70 m away
- 310 W 2nd StJul 28, 2026Secondary mechanical contractor* installing walk-in cooler and refrigeration systems only · 72 m away
- 200 Lavaca Street · Rhp Block 21 LLCMay 13, 2024W hotel, guestroom renovation — renovation/alteration — renovate 251 guest rooms with new finishes · 74 m away
- 237 W 3rd StNov 5, 2026Replacement of an existing water heater water heater replacement finleys barber shop · 81 m away