710 E 3rd St
Austin, TX 78701 · 710 E3 LLC
Meeting-room finish-out permitted at 710 E 3rd St
City of Austin permits indicate a first-time finish-out of shell space for a meeting room at 710 E 3rd St. Building, mechanical and electrical permits were filed in September 2025, followed by a plumbing permit on November 12, 2025. Separate permits filed in August 2024 describe a change of use from mixed-use multifamily to mixed-use hotel, including a remodel.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Nov 12, 2025
- Projects
- 15
- 15 filings
- Latest filing
- Nov 12, 2025
- since May 24, 2024
- Largest scope
- 11,735 sf
- Estimated cost
- $350K
- state registration
Permit & project history
15 projectsFirst time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitPlumbing PermitFinal- Record
- 2025-108348 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitElectrical PermitFinal- Record
- 2025-108348 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitMechanical PermitFinal- Record
- 2025-108348 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitBuilding PermitFinal- Record
- 2025-108348 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitPlumbing PermitFinal- Record
- 2025-011732 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitElectrical PermitExpired- Record
- 2025-011732 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitMechanical PermitFinal- Record
- 2025-011732 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
First time finish-out shell space for meeting room
First time finish-out shell space for meeting room
City of Austin permitBuilding PermitExpired- Record
- 2025-011732 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
City of Austin permitPlumbing PermitFinal- Record
- 2024-080652 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
City of Austin permitElectrical PermitFinal- Record
- 2024-080652 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
Change of use from mixed-use multifamily to mixed-use hotel to include remodel
City of Austin permitBuilding PermitFinal- Record
- 2024-080652 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install channel letters. placemakr. sign a. east elevation
Install channel letters. placemakr. sign a. east elevation
City of Austin permitElectrical PermitFinal- Record
- 2024-082462 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install channel letters. placemakr. north elevation
Install channel letters. placemakr. north elevation
City of Austin permitElectrical PermitFinal- Record
- 2024-082468 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install channel letters. placemakr. south elevation
Install channel letters. placemakr. south elevation
City of Austin permitElectrical PermitFinal- Record
- 2024-082472 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Convert the building from r-2 to r-1 use. work to include adapting the required number of units to accessible units and adding visible alarm devices to the required number of units. square footage of scope of work is 11,735 sq ft — block 36
TDLR project registrationRenovation/AlterationProject Closed11,735 sq ft$350K est.- Project #
- TABS2024019345
- Tenant / owner
- Block 36 R-1 Conversion
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 710 E 3rd St
What is being built at 710 E 3rd St in Austin?
City permit records describe a first-time finish-out of shell space for a meeting room. Building permit 2025-108348 BP was filed September 4, 2025.
Is 710 E 3rd St changing into a hotel?
August 2024 permits describe a change of use from mixed-use multifamily to mixed-use hotel, including a remodel. The records provided do not identify a hotel operator.
When were the meeting-room permits filed at 710 E 3rd St?
The building permit was filed September 4, 2025, followed by mechanical and electrical permits in September and a plumbing permit on November 12, 2025.
What do permit 2025-108348 BP and related permits cover?
The permits describe a first-time finish-out of shell space for a meeting room. The building, mechanical, electrical and plumbing permits are all listed as final.
Were there earlier permits for work at 710 E 3rd St?
Yes. Permits filed in August 2024 describe a change of use from mixed-use multifamily to mixed-use hotel, including a remodel. Some earlier 2025 permit records have expired status.
Also being built nearby
All of 78701- 710 E. 3rd Street · 710 E3 LLCNov 20, 2024Placemakr downtown austin - meeting space — renovation/alteration — build out of shell space in multi-family building for meeting room
- 217 Red River StNov 10, 2026Austin energy - dcp 4.1 c1 · 114 m away
- 602 E 4th St · Acc Austin OfficeApr 10, 2025Project control acc austin office renovation — renovation/alteration — renovation of existing retail space to transition to office. include open office, large conference room, small conference room, and two phone rooms; existing restrooms, break room, and storage room to remain · 165 m away
- 701 E 5th StApr 3, 2026Rework existing mechanical units on level 2. add additional louver to the area to server 3 new intake fans. work is in exterior room no asbestos. work is in non occupied mechanical room no tas · 184 m away
- 710 E Cesar Chavez StMay 22, 2025Loose meter can repair and anchor- only needed to get power back · 186 m away
- 807 E 4th StMar 5, 2024Install walk in cooler/freezer combo. ref permit : 2023-153393 bp · 208 m away
- 601 E 5th StOct 9, 2024Add ups (uninterruptible power source) for existing mdf room loads along with mini-split a/c units for cooling in garage building · 210 m away
- 100-1/2 Sabine StOct 28, 2020Palm park utility relocation · 213 m away
- 120-1/2 Red River StMar 17, 2016Canopy walk · 219 m away
- 101 Red River StNov 28, 2023Fairmont manchester - wall sign (lit) · 228 m away
- 507 Sabine StJun 30, 2026Replace one complete hvac system serving apt. 301 only: remove and replace one indoor fan coil and matching rooftop condensing unit. reconnect existing refrigerant electrical and condensate. no ductwork involved · 238 m away
- 555 E 5th StMay 19, 2026Replacement of complete existing central heat and air system with or without duct work chilled water air handler with electric heat · 240 m away