74 Trinity St
Austin, TX 78701
Dock and boat-launch work at 74 Trinity St
City of Austin records show a new kayak and paddleboard launch dock and removal of an existing deck area at 74 Trinity St, permitted March 18, 2025. Later permits cover boat-charging circuits on August 11, 2026, and a 240-volt outlet box by the boat dock on September 14, 2026.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Sep 14, 2026
- Projects
- 12
- 12 filings
- Latest filing
- Sep 14, 2026
- since May 10, 2012
- Largest scope
- —
- Estimated cost
- $400K
- state registration
Permit & project history
12 projectsInstall a 240v 50a rv box under sub panel 1 by the boat dock on a 50a gfci breaker
Install a 240v 50a rv box under sub panel 1 by the boat dock on a 50a gfci breaker
City of Austin permitElectrical PermitFinal- Record
- 2026-116820 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical only being inspected. adding 2 50 amp circuits to provide power to boat charging
Electrical only being inspected. adding 2 50 amp circuits to provide power to boat charging
City of Austin permitElectrical PermitFinal- Record
- 2026-087020 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Electrical only being inspected. adding 2 50 amp circuits to provide power to boat charging
Electrical only being inspected. adding 2 50 amp circuits to provide power to boat charging
City of Austin permitBuilding PermitFinal- Record
- 2026-087020 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install 50a 14-50 receptacle and a 20a 120v receptacle on exterior wall of main service panels this will require eliminating a couple of circuits from the old cafe to make room in the electrical panel
Install 50a 14-50 receptacle and a 20a 120v receptacle on exterior wall of main service panels this will require eliminating a couple of circuits from the old cafe to make room in the electrical panel
City of Austin permitElectrical PermitFinal- Record
- 2026-027147 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add new kaya/paddle board launch dock and remove existing deck area
Add new kaya/paddle board launch dock and remove existing deck area
City of Austin permitBuilding PermitFinal- Record
- 2025-026469 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Demolition of existing bulkhead dock, reconfiguration of docks to be all floating and restoration of riparian zone. provision of ada-compliant kayak slip and hoist; configuration of bulkheads, ramps and docks to be ada-compliant — waller creek boathouse (austin rowing club)
TDLR project registrationAdditions to Existing BuildingProject Closed10,300 sq ft$400K est.- Project #
- TABS2023023098
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 74 Trinity St
What is being built at 74 Trinity St?
A March 18, 2025, building permit describes a new kayak and paddleboard launch dock and removal of an existing deck area.
Is there a new boat launch at 74 Trinity St?
A City of Austin permit filed March 18, 2025, describes adding a kayak and paddleboard launch dock.
What electrical work is listed for the boat dock?
An August 11, 2026, permit describes adding two 50-amp circuits for boat charging. A September 14, 2026, permit describes installing a 240-volt, 50-amp RV box by the dock.
Is a new restaurant opening at 74 Trinity St?
The records provided do not identify a new restaurant. One electrical permit refers to an old cafe while describing work on the electrical panel.
What are the Waller Beach Improvements near Industrious San Jacinto Center?
The site plan for Waller Creek Tunnel Project—Waller Beach Improvements was approved and released on October 29, 2025; a second site-plan record was approved and released on December 22, 2025. Industrious San Jacinto Center is about 203 meters from 74 Trinity St.
What work is happening near Waterline Solar Canopy?
At 74 Trinity St, a permit describes a kayak and paddleboard launch dock, and later permits describe electrical work by the boat dock. Waterline Solar Canopy is about 226 meters away.
When were the recent permits for 74 Trinity St filed?
The dock permit was filed March 18, 2025. Boat-charging circuit permits were filed August 11, 2026, and a permit for a 240-volt RV box by the dock was filed September 14, 2026.
Also being built nearby
All of 78701- 71-1/2 Trinity StJul 24, 2026Waterloo greenway - creek delta · 52 m away
- 85 Trinity StNov 14, 2024Installation of warning lines on rooftop to meet osha safety standards · 116 m away
- 80 Red River StJul 17, 2026The travis · 179 m away
- 97 Trinity StOct 20, 201499 trinity tower - demolition, clearing, and piers · 187 m away
- 99 Trinity StDec 18, 201599 trinity tower (withdraw & resubmittal of sp-2013-0402c) · 192 m away
- 327 E Cesar Chavez StMay 14, 2025Install main id sign on front facade canopy illuminated channel letters on a raceway using existing primary electrical · 202 m away
- 23 San Jacinto Blvd · University Of Texas At AustinApr 11, 2025Boyd auditorium renovation — renovation/alteration — renovation of the auditorium with fixed seating. new work will comprise of revised lighting, seating, and finishes · 213 m away
- 98 San Jacinto Blvd · Cousins -San Jacinto Center LLC C/O Cousins Properties Inc.Nov 11, 2026Interior remodel of condo (kitchen area) · 214 m away
- 503 E Cesar Chavez · Waller Creek Owner LLCAug 6, 2026Waterline solar canopy — new construction — steel supported solar canopy and surrounds. roof of canopy is solar panels with translucent blanks. structure is steel framed construction. canopy is for public and will have moveable furniture underneath. no storage · 226 m away
- 92 Red River StJan 16, 2020Waller park place · 228 m away
- 98 San Jacinto Blvd, L13, Austin, TX 78701 · Cousins -San Jacinto Center LLC C/O Cousins Properties Inc.Aug 2, 2024San jacinto center l13 restrooms — renovation/alteration — interior renovation including finishes at existing building restrooms · 233 m away
- 98 San Jacinto Blvd, 14th · Cousins -San Jacinto Center LLC C/O Cousins Properties Inc.Jan 10, 2024Citadel austin (phase 3) — renovation/alteration — tenant interior renovation on floor 14 of existing building; including construction of partitions and renovation of ceilings in order to suite existing space for multiple tenants · 233 m away
More restaurants in 78701.