1009 E 15th St
Austin, TX 78702
EV charging circuit and HVAC replacement permitted at 1009 E 15th
City of Austin permits at 1009 E 15th St indicate an electrical circuit for an electric vehicle charging station and replacement of the existing central heating and air system. The HVAC permit was filed August 21, 2025, and the EV charging circuit permit was filed September 23, 2026; both are marked Final.
Summarized from City of Austin records · updated Sep 23, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 23, 2026
- since Aug 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projects(smith barry) - installation of circuit for elec. vehicle charging station - esip
(smith barry) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-119857 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork
City of Austin permitMechanical PermitFinal- Record
- 2025-106134 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1009 E 15th St
What is being built at 1009 E 15th St?
The permits indicate home upgrades, not a new building: replacement of the existing central HVAC system and installation of a circuit for an electric vehicle charging station.
Is a new home being built at 1009 E 15th St in Austin?
The available City of Austin records show mechanical and electrical work at the residential address, not a new-home construction permit.
Is an EV charger being installed at 1009 E 15th St?
A City of Austin electrical permit describes installation of a circuit for an electric vehicle charging station. Permit 2026-119857 EP was filed September 23, 2026, and is marked Final.
Is the HVAC system being replaced at 1009 E 15th St?
Yes. Mechanical permit 2025-106134 MP describes replacing the existing central heating and air system, without ductwork, and is marked Final.
When were permits filed for work at 1009 E 15th St?
The HVAC permit was filed August 21, 2025. The electrical permit for an EV charging circuit was filed September 23, 2026.
What is the status of the permits at 1009 E 15th St?
Both available City of Austin permits are marked Final: the HVAC permit 2025-106134 MP and the EV charging circuit permit 2026-119857 EP.
Also being built nearby
All of 78702- 1007 E 15th StMar 17, 2026Express: foundation repair · 20 m away
- 1012 E 15th StOct 6, 2024Replacement of complete existing central heat and air system with or without duct work · 41 m away
- 1008 E 14th StOct 12, 2026Excavate under pier and beam home to replace 10 sewer line to left side bathroom and kitchen. also trenching to replace approximately 80ft of water line including from meter to home and from water heater in shed through the ground to kitchen and bathroom · 60 m away
- 1007 E 14th StSep 16, 2025Install new 13.94 kw dc rooftop solar system to existing residential · 92 m away
- 910 E 14th StFeb 20, 2025New 11x153 pool with retractable pool cover · 104 m away
- 1001 E 14th StJun 21, 2024Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 1308 Navasota StMar 29, 2018Merz addition · 122 m away
- 1309 Waller StMar 16, 2026**install 80ft gas line repair · 124 m away
- 1307 Waller StSep 26, 2015Joseph limerick subdivision · 135 m away
- 1210 Bob Harrison StJun 6, 2024Addition/remodel to primary residence adding 565 to first floor 308 to sq ft 133 sq ft to garage 93 sq ft porch 35 sq ft balcony includes 1 new bedroom and 1 new bathroom · 144 m away
- 1305 Waller StNov 11, 2026To remove the existing window inside the shower and close it permanently. a letter from the structural engineer is attached along with some images showing the work to be performed · 152 m away
- 1209 Bob Harrison StAug 27, 2024Addition/remodel. addition of a bathroom to side of existing noncomplying 1-story secondary unit resulting in a 2 bedroom 2 bathroom secondary residential unit. *change address to bob harrison · 155 m away