Active · latest filing Sep 2026Residential

1009 E 15th St

Austin, TX 78702

EV charging circuit and HVAC replacement permitted at 1009 E 15th

City of Austin permits at 1009 E 15th St indicate an electrical circuit for an electric vehicle charging station and replacement of the existing central heating and air system. The HVAC permit was filed August 21, 2025, and the EV charging circuit permit was filed September 23, 2026; both are marked Final.

Summarized from City of Austin records · updated Sep 23, 2026

Projects
2
2 filings
Latest filing
Sep 23, 2026
since Aug 21, 2025
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. (smith barry) - installation of circuit for elec. vehicle charging station - esip

    (smith barry) - installation of circuit for elec. vehicle charging station - esip

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1009 E 15th St

What is being built at 1009 E 15th St?

The permits indicate home upgrades, not a new building: replacement of the existing central HVAC system and installation of a circuit for an electric vehicle charging station.

Is a new home being built at 1009 E 15th St in Austin?

The available City of Austin records show mechanical and electrical work at the residential address, not a new-home construction permit.

Is an EV charger being installed at 1009 E 15th St?

A City of Austin electrical permit describes installation of a circuit for an electric vehicle charging station. Permit 2026-119857 EP was filed September 23, 2026, and is marked Final.

Is the HVAC system being replaced at 1009 E 15th St?

Yes. Mechanical permit 2025-106134 MP describes replacing the existing central heating and air system, without ductwork, and is marked Final.

When were permits filed for work at 1009 E 15th St?

The HVAC permit was filed August 21, 2025. The electrical permit for an EV charging circuit was filed September 23, 2026.

What is the status of the permits at 1009 E 15th St?

Both available City of Austin permits are marked Final: the HVAC permit 2025-106134 MP and the EV charging circuit permit 2026-119857 EP.