1608 Maple Ave
Austin, TX 78702
1608 Maple Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1608 Maple Ave, Austin, TX 78702. The most recent, filed June 27, 2018, covers: “Belcher resub of block 12 glenwood addition: resu, of portions of lots 7 8”.
Compiled from City of Austin records · updated Jun 27, 2018
- Projects
- 1
- 1 filings
- Latest filing
- Jun 27, 2018
- since Jun 27, 2018
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 1608 Maple Ave
What is being built at 1608 Maple Ave?
The latest filing (City of Austin case 11743445, June 27, 2018) covers belcher resub of block 12 glenwood addition: resu, of portions of lots 7 8.
How many permits and filings does 1608 Maple Ave have?
1 filing across 1 project, from June 27, 2018 to June 27, 2018.
Is there other construction near 1608 Maple Ave?
Yes. Nearby filings include 1604 Maple Ave (glenwood addn, blk 12; resub lt 1 & the e. 1/2 lt 2 a.b. belcher's (plat vac), Aug 10, 2009); 1600 Maple Ave (install circuit for level 2 evse, Nov 20, 2023); 1706 Maple Ave (sewer line replacement from pvc at home to city easement in front yard about 100 feet, Feb 19, 2025).
How do I get alerts for new permits at 1608 Maple Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78702- 1604 Maple AveAug 10, 2009Glenwood addn, blk 12; resub lt 1 & the e. 1/2 lt 2 a.b. belcher's (plat vac) · 35 m away
- 1600 Maple AveNov 20, 2023Install circuit for level 2 evse · 58 m away
- 1706 Maple AveFeb 19, 2025Sewer line replacement from pvc at home to city easement in front yard about 100 feet · 83 m away
- 1705 Chestnut AveOct 16, 2024Sprinkler system · 92 m away
- 2304 E 16th StNov 5, 2026Total demolition of sfr 800 sq ft circa 1940. ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 95 m away
- 1608 Chestnut AveSep 24, 2024Express: replace tile on tub in master bathroom · 100 m away
- 1709 Maple AveOct 15, 2025Construct new driveway approach of 10 ft. no sidewalk inspection per plan review · 118 m away
- 1415 Chestnut AveOct 20, 2025Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 1704 Singleton AveApr 25, 2026Express: replacement of shiplap on living room walls replacement of sheetrock in excess of 128 sq ft toilet replacement x2 replacement of broken window of same size · 126 m away
- 1710 Maple AveOct 29, 2015Glenwood addition lot 1 and part of lot 2 blk 5; resubdivision · 128 m away
- 1711 Maple AveSep 13, 2024Upgrade to accommodate building. 2 2401 e 18th st · 132 m away
- 2401 E 18th StOct 2, 2024Construct new driveway approach of 10 ft. no sidewalk inspection per plan review. adu- to 1711 maple ave · 141 m away