A renovation of the 18,000-square-foot Givens District Park Recreation Center at 3811 E. 12th was registered with TDLR on July 25, 2025. The work includes mechanical equipment upgrades, a new flat roof and insulation, sidewalk improvements, and interior renovations. The applicant’s estimated project cost is $2.7 million.
Summarized from Texas Department of Licensing and Regulation records · updated Jul 25, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 25, 2025
- since Jul 25, 2025
- Largest scope
- 18,000 sf
- Estimated cost
- $2.7M
- state registration
Permit & project history
1 projectRenovation 18,000 sq ft building - replace & upgrade mechanical equipment, clerestory storefront system, replacement of flat roof & insulation, sidewalk upgrade & interior renovation: new water cooler & upgrade to restroom showers. — givens district park - recreation center
TDLR project registrationRenovation/AlterationReview Complete18,000 sq ft$2.7M est.- Project #
- TABS2025024413
- Tenant / owner
- Givens District Park - Recreation Center
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3811 E. 12th
What is being renovated at 3811 E. 12th in Austin?
The project is a renovation of the Givens District Park Recreation Center, an 18,000-square-foot building. The TDLR registration lists mechanical, roof, sidewalk, and interior improvements.
When was the Givens District Park Recreation Center renovation registered?
The project was registered with TDLR on July 25, 2025.
What work is planned at the Givens District Park Recreation Center?
The listed work includes replacing and upgrading mechanical equipment, replacing the flat roof and insulation, upgrading the clerestory storefront system and sidewalks, and renovating the interior. The description also mentions a new water cooler and restroom shower upgrades.
How big is the Givens District Park Recreation Center renovation?
The TDLR registration describes an 18,000-square-foot building renovation.
How much is the Givens District Park Recreation Center project estimated to cost?
The applicant’s estimated cost for the project is $2.7 million, according to the TDLR registration.
What is the status of the Givens District Park Recreation Center project?
The TDLR project registration, TABS2025024413, lists its status as “Review Complete.”
Also being built nearby
All of 78721- 4008 E 12th StMay 29, 2025Excavate 8 tunnel to repair main drain line serving one bathroom under the house · 45 m away
- 4018 E 12th StMay 11, 2025New 6 solid fence within floodplain and erosion hazard zone · 90 m away
- 1205 Perez StMay 14, 2024Irrigation system · 104 m away
- 1215 Luna StFeb 5, 2025Upgrade overhead duplex service approved for reconnect---slc ecc @ 1437---wes · 106 m away
- 1207 Perez StOct 29, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [3bed 2.5bath] with attached carport. building 2 · 112 m away
- 1209 Perez StAug 19, 2024Express: tub-to-shower conversion. remove the existing tub and surround. install new shower pan and tiled walls · 123 m away
- 4103 E 12th StJan 8, 2025Install new 13.53 kw rooftop solar system to existing residential only · 125 m away
- 1300 Luna StJun 11, 2024Replacement of complete existing central heat and air system with or without duct work · 138 m away
- 1204 Perez StJan 15, 2025Main service upgrade. meter upgrade · 141 m away
- 4105 E 12th StNov 15, 2023Installation of wall mounted ev charging station · 144 m away
- 1212 Cometa StMar 5, 2024Replacement of complete existing central heat and air system with or without duct work · 147 m away
- 1213 Perez StDec 15, 2023Replacement of complete existing central heat and air system with or without duct work · 148 m away