groundranger
Historic · latest filing Jun 2024Residential

4805 Filey Cv

Austin, TX 78721

4805 Filey Cv: 2 projects on record

City of Austin lists 2 filings across 2 projects at 4805 Filey Cv, Austin, TX 78721 since May 31, 2024. The most recent, filed June 3, 2024, covers: “Replacing overhead service/meter base and 200 amp main panel”.

Compiled from City of Austin records · updated Jun 3, 2024

Projects
2
2 filings
Latest filing
Jun 3, 2024
since May 31, 2024
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Replacing overhead service/meter base and 200 amp main panel

    Replacing overhead service/meter base and 200 amp main panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express: foundation repair (2 smartjacks 9 concrete posts 20ft wood beam)

    Express: foundation repair (2 smartjacks 9 concrete posts 20ft wood beam)

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4805 Filey Cv

What is being built at 4805 Filey Cv?

The latest filing (City of Austin permit 2024-067440 EP, June 3, 2024) covers replacing overhead service/meter base and 200 amp main panel.

How many permits and filings does 4805 Filey Cv have?

2 filings across 2 projects, from May 31, 2024 to June 3, 2024.

Is there other construction near 4805 Filey Cv?

Yes. Nearby filings include 1708 Adina St (demolition fence carport conc patio slab; fill in exist. ext door/curb; replace exist. ext. doors/windows (same size); replace drywall at w. heater closet; replace exist. a/c water heater flooring cabinets doors trim/shelving fans switches outlets ac vents tile plumbing fixtures; add recess lighting. new roof fence, Jun 14, 2026); 4802 Filey Cv (express: tub-shower conversion, Mar 17, 2025); 1710 Meander Dr (tunnel under home approximately 75 feet to expose sewer line under home once sewer line is exposed radiant had replaced approximately 25 foot of sewer line from the clean out to the master bathroom we will repair any issues we notice with the pvc line then tie on to the new pvc and run the additional 50 feet needed through the home to the other guest hall bathroom in the main part of town. we will also branch off of the line to the kitchen sink and fixtures in both of the bathrooms to replace all of the old cast iron pipe under the home we will then test for leaks and proper function and preform a hydro static test to ensure ther are no issue we will have this inspected by the city and an engineer will ensure there are no issues with the foundation before backfill is preformed, Aug 8, 2025).

How do I get alerts for new permits at 4805 Filey Cv?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78721
Get alerts for 4805 Filey Cv