5008 Baker St
Austin, TX 78721
5008 Baker St: 1 project on record
City of Austin lists 1 filing across 1 project at 5008 Baker St, Austin, TX 78721. The most recent, filed August 1, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Aug 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 1, 2024
- since Aug 1, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-090766 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5008 Baker St
What is being built at 5008 Baker St?
The latest filing (City of Austin permit 2024-090766 PP, August 1, 2024) covers replacement of an existing water heater.
How many permits and filings does 5008 Baker St have?
1 filing across 1 project, from August 1, 2024 to August 1, 2024.
Is there other construction near 5008 Baker St?
Yes. Nearby filings include 5010 Baker St (***per coordination with 23-154709 ex no work to occur 01/17/24-01/22/24*** construct a new driveway of 19 ft and a new sidewalk of 40 lf. *shay, Jan 8, 2024); 5004 Baker St (level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <20 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw, Oct 25, 2024); 5012 Baker St (***per coordination with 23-154709 ex no work to occur 01/17/24-01/22/24*** construct new driveway of 19 ft and new sidewalk of 40 lf. *shay, Jan 8, 2024).
How do I get alerts for new permits at 5008 Baker St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78721- 5010 Baker StJan 8, 2024***per coordination with 23-154709 ex no work to occur 01/17/24-01/22/24*** construct a new driveway of 19 ft and a new sidewalk of 40 lf. *shay · 17 m away
- 5004 Baker StOct 25, 2024Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <20 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw · 30 m away
- 5012 Baker StJan 8, 2024***per coordination with 23-154709 ex no work to occur 01/17/24-01/22/24*** construct new driveway of 19 ft and new sidewalk of 40 lf. *shay · 32 m away
- 5007 Baker StMar 2, 2007Baker subdivision — baker subdivision · 43 m away
- 5211 Rob Scott StJan 8, 2024***per coordination with 23-154727 ex no work to occur 01/17/24-01/22/24 construct new driveway of 12 ft and new sidewalk of 40 lf. *shay · 55 m away
- 1817 Adina StFeb 14, 2025Install a full lawn sprinkler system · 67 m away
- 5207 Rob Scott StJun 10, 2025Wire for car charger · 76 m away
- 5104 Heflin LnApr 4, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away
- 5205 Rob Scott StApr 13, 2026Replacement of an existing water heater 50gal electric located in the basement · 87 m away
- 5112 Heflin LnJun 10, 2026Express: existing foundation repair as per the scope of work attached · 91 m away
- 5116 Heflin LnJul 7, 2026Rack permit 2025-061584 ep and 2025-061585 ep · 94 m away
- 1810 Adina StJul 29, 2025Replacement of an existing water heater · 103 m away