5924 Lux St
Austin, TX 78721
5924 Lux St: 1 project on record
City of Austin lists 1 filing across 1 project at 5924 Lux St, Austin, TX 78721. The most recent, filed April 21, 2026, covers: “(chin eric) - installation of circuit for elec. vehicle charging station - esip”.
Compiled from City of Austin records · updated Apr 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 21, 2026
- since Apr 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project(chin eric) - installation of circuit for elec. vehicle charging station - esip
(chin eric) - installation of circuit for elec. vehicle charging station - esip
City of Austin permitElectrical PermitFinal- Record
- 2026-043535 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5924 Lux St
What is being built at 5924 Lux St?
The latest filing (City of Austin permit 2026-043535 EP, April 21, 2026) covers (chin eric) - installation of circuit for elec. vehicle charging station - esip.
How many permits and filings does 5924 Lux St have?
1 filing across 1 project, from April 21, 2026 to April 21, 2026.
Is there other construction near 5924 Lux St?
Yes. Nearby filings include 5928 Lux St (addition for kitchen expansion on first floor converting second floor balcony into interior space, Feb 1, 2024); 5932 Lux St (replacement of complete existing central heat and air system with or without duct work, May 7, 2024); 5933 Lux St (addition - enclosing a patio using exisitng concrete slab. we will be constrcuting a single slope roof walls with (2) window units and (1) door unit spray foam insulation will be applied (4) new duplex outlets switches (4) can lights (1) ceiling fan circut. sheetrock trim paint and flooring will be applied to finish out. no hvac, Dec 17, 2025).
How do I get alerts for new permits at 5924 Lux St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78721- 5928 Lux StFeb 1, 2024Addition for kitchen expansion on first floor converting second floor balcony into interior space · 13 m away
- 5932 Lux StMay 7, 2024Replacement of complete existing central heat and air system with or without duct work · 26 m away
- 5933 Lux StDec 17, 2025Addition - enclosing a patio using exisitng concrete slab. we will be constrcuting a single slope roof walls with (2) window units and (1) door unit spray foam insulation will be applied (4) new duplex outlets switches (4) can lights (1) ceiling fan circut. sheetrock trim paint and flooring will be applied to finish out. no hvac · 53 m away
- 5909 Lux StDec 12, 2023Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 5920 Ventus StFeb 5, 2024Replacement of mini-split system · 76 m away
- 5932 Ventus StJun 7, 2024New pool · 77 m away
- 1117 Altum StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 1149 Perry RdJun 12, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 5913 Ventus StMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 1127 Perry RdJul 10, 2008Sol subdivision (smart housing) · 140 m away
- 1153 Perry RdJan 21, 20221153 perry road subdivision · 143 m away
- 5907 Jain LnApr 8, 2026Upgrade of existing overhead service to duplex to current codes and standards for both units 1 2 meters are located on unit 2 · 165 m away