Generator equipment and EV charging work at 2011 E 51st St
Austin permits indicate work to replace a generator automatic transfer switch and add an equipment docking station on a new concrete pad at 2011 E 51st St. Building, electrical, and plumbing permits for that work were filed from March 11 to April 22, 2025, and the City lists them as final; earlier permits covered EV charging stations.
Summarized from City of Austin records · updated Apr 22, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Apr 22, 2025
- since Dec 12, 2023
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsReplace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
Replace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
City of Austin permitPlumbing PermitFinal- Record
- 2025-028253 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
Replace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
City of Austin permitElectrical PermitFinal- Record
- 2025-028253 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
Replace an existing option generator automatic transfer switch an add a docking station on equipment pad with new concrete pad. site plan exemption not required less than 100 sq ft
City of Austin permitBuilding PermitFinal- Record
- 2025-028253 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of ev charging stations
Installation of ev charging stations
City of Austin permitElectrical PermitFinal- Record
- 2023-129940 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of ev charging stations
Installation of ev charging stations
City of Austin permitBuilding PermitExpired- Record
- 2023-129940 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2011 E 51st St
What is being built at 2011 E 51st St?
Austin permits indicate generator equipment work: replacing an automatic transfer switch and adding a docking station on a new concrete pad. Earlier permits at the address covered EV charging station installation.
Is a new building going up at 2011 E 51st St?
The available permits describe equipment upgrades and EV charging station installation, not a new building.
What work was permitted at 2011 E 51st St in 2025?
The City filed building permit 2025-028253 BP on March 11, electrical permit 2025-028253 EP on April 16, and plumbing permit 2025-028253 PP on April 22, 2025. They describe replacing a generator automatic transfer switch and adding a docking station on a new concrete pad.
Are EV charging stations planned at 2011 E 51st St?
Austin permits from 2023 describe installation of EV charging stations. The building permit, 2023-129940 BP, is listed as expired, while electrical permit 2023-129940 EP is listed as final.
What is the status of the 2025 permits for 2011 E 51st St?
The City lists permits 2025-028253 BP, 2025-028253 EP, and 2025-028253 PP as final.
Also being built nearby
All of 78723- 5029-1/2 Tilley StMay 16, 2025Tannehill creek trail · 274 m away
- 5027-1/2 Tilley StAug 2, 2022Tannehill creek trail · 276 m away
- 2601 Philomena StApr 11, 2019Philomena park · 284 m away
- 2001 Singing BrookFeb 9, 202450 tunnel & 30 yard line · 294 m away
- 2724 Philomena StSep 30, 2026Rerouting ducts of heat pump water heaters in all 2 and 3 bedroom units 92 units total. remove ducts into unit interior and replace with ducts to wall to exterior corridor with fire damper vents · 296 m away
- 2511 Philomena StDec 26, 2024Carport conversion to garage · 312 m away
- 2003 Singing BrookSep 30, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton 2 stage vertical gas · 312 m away
- 2007 Singing BrookApr 15, 2024Uograde permanent service · 331 m away
- 2004 Singing BrookMar 19, 2024Per tx gas- relocating gas meter away from tankless water heater and ac · 335 m away
- 2701 Philomena StNov 13, 2026Esp - the jordan ii psh · 346 m away
- 2006 Singing BrookMar 21, 2025New pool house with attached pergola & uncovered patio · 347 m away
- 1902 Sunny Brook DrOct 22, 2024Replacement of complete existing central heat and air system with or without duct work · 347 m away