5609 Mapleleaf Dr
Austin, TX 78723
5609 Mapleleaf Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 5609 Mapleleaf Dr, Austin, TX 78723. The most recent, filed July 8, 2024, covers: “200a main service upgrade”.
Compiled from City of Austin records · updated Jul 8, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 8, 2024
- since Jul 8, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project200a main service upgrade
200a main service upgrade
City of Austin permitElectrical PermitFinal- Record
- 2024-083708 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5609 Mapleleaf Dr
What is being built at 5609 Mapleleaf Dr?
The latest filing (City of Austin permit 2024-083708 EP, July 8, 2024) covers 200a main service upgrade.
How many permits and filings does 5609 Mapleleaf Dr have?
1 filing across 1 project, from July 8, 2024 to July 8, 2024.
Is there other construction near 5609 Mapleleaf Dr?
Yes. Nearby filings include 5607 Mapleleaf Dr (base: installing a backup battery system and additional meter socket, Oct 28, 2026); 5613 Mapleleaf Dr (replacement of complete existing central heat and air system with or without duct work, Dec 19, 2025); 1907 Northridge Dr (installation of a 100a service-rated automatic transfer switch 18kw whole home generator additional grounding and type 2 surge protection, Nov 9, 2026).
How do I get alerts for new permits at 5609 Mapleleaf Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78723- 5607 Mapleleaf DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 26 m away
- 5613 Mapleleaf DrDec 19, 2025Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 1907 Northridge DrNov 9, 2026Installation of a 100a service-rated automatic transfer switch 18kw whole home generator additional grounding and type 2 surge protection · 48 m away
- 1903 Northridge DrJan 13, 2026Repair of main service. replace panel meter can and install main grounding required by code · 49 m away
- 1909 Northridge DrMay 5, 2026Replacing sewer line length is about 35-40 ft. this will be front yard and on the left side of the property facing the house. approximately 18 inches to 3 ft deep · 63 m away
- 5602 Mapleleaf DrFeb 13, 2024Express: fire repair · 73 m away
- 1911 Northridge DrApr 28, 2024New residential irrigation system · 82 m away
- 1807 Northridge DrNov 6, 202510 ft excavation to repair drain lines · 84 m away
- 1904 Northridge DrMar 19, 2024Replace 45-50 ft galvanized water line · 89 m away
- 5605 Delwood DrFeb 12, 2024New irrigation system in front and back yard · 91 m away
- 5600 Mapleleaf DrFeb 11, 2026Create tunnel(s) approx 85ft to replace cast iron drain up to bottom of foundation and out to exterior city tap location · 94 m away
- 1805 Northridge DrNov 21, 2023Express: window replacement (like for like) · 102 m away