2017 Elysian Fields
Austin, TX 78727
2017 Elysian Fields: 1 project on record
City of Austin lists 1 filing across 1 project at 2017 Elysian Fields, Austin, TX 78727. The most recent, filed February 21, 2025, covers: “Express: replace 8 existing windows”.
Compiled from City of Austin records · updated Feb 21, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 21, 2025
- since Feb 21, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: replace 8 existing windows
Express: replace 8 existing windows
City of Austin permitBuilding PermitFinal- Record
- 2024-103207 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2017 Elysian Fields
What is being built at 2017 Elysian Fields?
The latest filing (City of Austin permit 2024-103207 BP, February 21, 2025) covers express: replace 8 existing windows.
How many permits and filings does 2017 Elysian Fields have?
1 filing across 1 project, from February 21, 2025 to February 21, 2025.
Is there other construction near 2017 Elysian Fields?
Yes. Nearby filings include 2101 Elysian Fields (replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 3.5 ton single stage goodman system, Apr 9, 2025); 13105 Bourbon St (express: replace windows, Feb 19, 2024); 13200 Bourbon St (express: tub to walk-in-shower no plumbing moving no change to layout, Jul 1, 2024).
How do I get alerts for new permits at 2017 Elysian Fields?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78727- 2101 Elysian FieldsApr 9, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 3.5 ton single stage goodman system · 82 m away
- 13105 Bourbon StFeb 19, 2024Express: replace windows · 101 m away
- 13200 Bourbon StJul 1, 2024Express: tub to walk-in-shower no plumbing moving no change to layout · 102 m away
- 13008 Candlestick PlFeb 7, 2024Upgrade an old electric service with a new 200 amps main breaker electric service · 111 m away
- 13009 Candlestick PlMay 1, 2026Replacement of an existing water heater · 116 m away
- 13201 Bourbon StJun 10, 2024Replacing 200 amp service · 118 m away
- 13205 Bourbon StAug 25, 2025Replacement of complete existing central heat and air system with or without duct work · 154 m away
- 13005 Candlestick PlDec 28, 2023Upgrading existing 125 amp service to 200 amp service · 153 m away
- 13100 Elysian Fields CvFeb 13, 2025Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 13007 Irongate CirAug 5, 2024Replacement of an existing water heater · 157 m away
- 2107 Elysian FieldsSep 24, 2025Replacement of complete existing central heat and air system with or without duct work · 157 m away
- 2120 Elysian FieldsJul 30, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 186 m away