3909 Adelphi Ln
Austin, TX 78727
Gas test permit recorded at 3909 Adelphi Lane daycare
A City of Austin plumbing permit records a gas test at a day care center for the health department at 3909 Adelphi Lane. The permit, 2025-012919 PP, was filed February 7, 2025, and is marked final; it does not describe new construction.
Summarized from City of Austin records · updated Feb 7, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Feb 7, 2025
- since Feb 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectGas test at day care center for health department
Gas test at day care center for health department
City of Austin permitPlumbing PermitFinal- Record
- 2025-012919 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3909 Adelphi Ln
What is being built at 3909 Adelphi Lane?
The City of Austin permit records a gas test at a day care center for the health department, not a new building. Permit 2025-012919 PP was filed February 7, 2025.
Is a new daycare opening at 3909 Adelphi Lane?
The available permit documents a gas test at a day care center. It does not say that a new daycare is opening.
What kind of permit was filed for 3909 Adelphi Lane?
It was a plumbing permit for a gas test at a day care center for the health department. The permit is marked final.
When was the 3909 Adelphi Lane permit filed?
The City of Austin filing date is February 7, 2025. The permit number is 2025-012919 PP.
What is happening near Austin International School on Adelphi Lane?
At 3909 Adelphi Lane, the City of Austin recorded a plumbing permit for a gas test at a day care center. Austin International School is listed nearby at 4001 Adelphi Lane.
Also being built nearby
All of 78727- 4001 Adelphi Lane · Austin International SchoolApr 17, 2024Phase one: austin international school campus improvements — renovation/alteration — replacement of a portion of the building's hvac system and associated exterior hvac units, ada upgrades for parking and accessible entrance route, interior renovation of the auditorium, existing library, and existing foyer area; & work on cds · 96 m away
- 4001 Adelphi LnJul 16, 2026Installation of a 240 sq ft (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the eastside campus entrance to provide weather protection from the drop-off point to the building. scope includes laying out and placing 6 concrete footings to support structural columns. all work to be completed per engineering specifications · 103 m away
- 12300 Amherst DrMar 2, 2007St. stephens missionary baptist church · 108 m away
- 12223 Cassady DrJul 23, 2025Access control-installing electronic locks · 114 m away
- 12400 Amherst DrJun 20, 2025Interior remodel and change of use to personal improvement services - karate studio · 117 m away
- 12500 Amherst DrMar 2, 2007Milwood branch library · 192 m away
- 12416 Coronet StMar 15, 2024Replacement of complete existing central heat and air system with or without duct work · 192 m away
- 12408 Coronet StOct 22, 2026Change of use from duplex into sfr. conversion of existing garage into habitable space · 201 m away
- 12418 Coronet StAug 18, 2025Express: replace 12 existing windows like for like · 200 m away
- 4100 Adelphi LnDec 27, 2024Replacement of complete existing central heat and air system with or without duct work · 222 m away
- 3704 Gable DrOct 19, 2026Base: installing a backup battery system and additional meter socket · 230 m away
- 4102 Adelphi LnFeb 26, 2025Replacement of complete existing central heat and air system with or without duct work · 235 m away